Electrical Installation
We provide a full range of services for electrical systems, including design, testing and commissioning for systems such as main switch cubicles, cable transmission systems, sub-main switch gear distribution systems, final sub-circuit systems and emergency generator installation and extra low voltage installation systems for various residential, industrial, institutional, commercial and data /computer center projects.
Services
Supply and Installation of: 1. High Voltage (HV) & Low Voltage (LV) electrical distribution
2. Extra Low Voltage (ELV)
3. Security System
4. Emergency Power Supply System
5. Uninterrupted Power Supply System
Accreditation Electrical and Mechanical Services Department
*Registered Electrical Contractor
Works Branch, Development Bureau
*Electrical Installation (Group III)
Job Reference
Project | Owner | Contract period |
Lift Addition for Three Schools- Carmel Bunnan Tong Memorial Secondary School, Cotton Spinners Assoiation Secondary School and CCC Kei Wai Primary School for HKSAE (RF FM002) | Education Bureau (HKSAR) | Oct 2017- On Progress |
HKIA Level 3 Plantroom Transportation centre | Hong Kong International Airport | Oct 2017-On Progress |
Carmel Alison Lam Foundation Secondary School | Education Bureau (HKSAR) | Sep 2017 -On Progress |
Olympian city 2 G/F market and food corridor | Sino Estates Management Limited | Sep 2017-On Progress |
Hong Kong Polyu M102 M103 | Hong Kong Polytechnic University | Aug 2017 -Dec 2017 |
Tennis Court at Causeway Sport Ground | Architectural Services Department | Aug 2017 -Nov 2017 |
Tung Hei Road Toilet | Architectural Services Department | Aug 2017-On Progress |
HKBU AML511 Level 5 Au Shue Hung Memorial Library | Hong Kong Baptist University | Aug 2017 -On Progress |
Island School – Shatin (campus B) | English School Foundation | Jul 2017-Aug 2017 |
Footbrige near Old Bailey Street | The jockey Club CPS Limited | Jul 2017-On Progress |
ESF – South Island School | English School Foundation | Jun 2017-On Progress |
Area 9A Discovery Bay – Electrical installation | HKR International Ltd | Jun 2017- Aug 2017 |
CUHK 3/F Far East Consortuium Building Jordan | Chinese University of Hong Kong | Jun 2017- On Progress |
Guestroom and corridor renovation 1/F to 3/F and 5/F Gold Coast Hotel | Sino Estates Management Limited | May 2017-Jul 2017 |
UG/F shop re-layout at Olympian City 2 | Sino Estates Management Limited | Apr 2017 -Jun 2017 |
Tuen Mun Town Plazas 1 Upgrade Toilet | Sino Estates Management Limited | Apr 2017 -Jul 2017 |
Shopping Arcade One Silver | Sino Estates Management Limited | Apr 2017-On Progress |
One Silver G/F, UG/F and 2/F | Sino Estates Management Limited | Mar 2017 -Feb 2018 |
Cha Kwo Ling Sitting Out Area | Home Affairs Department | Mar 2017 -Jun 2017 |
E&M Installation for CSBS Mrs. Aw boon Haw Secondary School | Education Bureau (HKSAR) | Feb 2017 -Jul 2017 |
Electrical, MVAC & Fire Services Installation for Proposed Extension (Phase 3) & Alterations & Additions for Hong Chi Association Advanced Training Centre at Pinehill Village, Cheung Nga Road, Nam Hang, Tai Po, N.T. | Hong Chi Association | Feb 2017-On Progress |
Replacement of Electrostatic Precipitator at G1, STRC (2017) (RFQ7117) | Hong Kong Jocky Club | Feb 2017 -On Progress |
E&M Installation for A&A Works at Tuen Mun Town Plaza 1, 1 Tuen Shun Street, Tuen Mun, N.T. | Sino Estates Management Limited | Feb 2017-On Progress |
E&M Installation for Cognita A&A Works at 25 Man Fuk Road , Ho Man Tin | Stamford American School | Dec 2016 -On Progress |
Electrical, MVAC and FS Installation for Renovation works for Hong Kong Playground Association Tung Chung Camp at 38 Ngau Au Village, Tung Chung, Hong Kong | Hong Kong Playground Association | Dec 2016-On Progress |
E & M Installation for A&A Works for HKBU-Renovation Works at 9/F of Sir Run Run Shaw Building | Hong Kong Baptist University | Dec 2016 -Apr 2017 |
E&M Installation for Refurbishment and Strengthening of Mammal Cage at Hong Kong Zoological and Botanical Gardens (P1000819 ) | Architectural Services Department | Dec 2016 -Mar 2017 |
Electrical Installation for Construction of Sitting-out Area at the Eastern Bank of Tuen Mun River | Home Affairs Department | Dec 2016 -Apr 2017 |
Renovation Works to Discovery Bay Office Centre (HKP/PD/DBOC/0387/2016) – Tender Query No.1 | Hong Kong Resort Company Limited | Dec 2016 -On Progress |
HKBU Shek Mun power socket 7/F to 11/F | Hong Kong Baptist University | Dec 2016 -Dec 2017 |
Electrical, MVAC and Fire Services Installation for Alteration and Addition Works at U003 and U003A for the Hong Kong Polytechnic University | The Hong Kong Polytechnic University | Dec 2016 -Apr 2017 |
A&A Works fro Metro City Plaza II – Electrical Installation | Henderson Land Development Company Limited | Dec 2016-Mar 2017 |
E&M Installation for Renovation Works for 3/F & 5/F, Holy Trinity Bradbury Centre, 139 Ma Tau Chung Road, Kowloon, HK | Golden Build | Dec 2016-May 2017 |
Provision of Stage Engineering Services at Hong Kong Coliseum | Electrical and Mechanical Services Department | Dec 2016 -Apr 2017 |
1-19 Nam Cheong Street | Henderson Land Development Company Limited | Nov 2016 -Dec 2016 |
Electrical Installation for Refurbishment to Leisure Pool and Water Play Equipment at Hammer Hill Road Swimming Pool | Architectural Services Department | Nov 2016 -On Progress |
5-Month Contract for Operation and Maintenance of Electrical, Mechanical and Air-conditioning Systems at Yung Fung Shee Memorial Centre and Pamela Youde Polyclinic | Electrical and Mechanical Services Department | Nov 2016 -Mar 2017 |
Provision of Electrical, Mechanical & Building Services Support Services at New Specialist Clinic Block and Various Blocks of Queen Elizabeth Hosptial | Electrical and Mechanical Services Department | Oct 2016 -Mar 2017 |
Provision of Technical Service at Stenecuttars Island Governement Dockyard under MunCS | Electrical and Mechanical Services Department | Oct 2016-May 2017 |
Electrical Installation for CUHK 4/F,Cheng Yu Tung Building | City University of Hong Kong | Oct 2016- On Progress |
E&M Installation for Yau Tsim Mong Multicultural Activity Centre | Architectural Services Department | Oct 2016- On Progress |
Electrical Installation for Proposed Residential Development at Kou To Shan | Eminent Gold Inverstment Ltd,. | Oct 2016- On Progress |
Electrical & MVAC Installation for Refurbishment to Shelter and Toilet in Tsuen Wan Tin Hau Temple Garden | Architectural Services Department | Oct 2016- On Progress |
Provision of Engineering Works for Supporting Engineering System Project Management Service under MunSD from Year 2016 to 2018 | Electrical and Mechanical Services Department | Sep 2016-Oct 2017 |
Electrical Installation at 1752 DD122,Tong Yan San Tsuen, Yuen Long | Henderson Land Development Company Limited | Sep 2016 -On Progress |
E&M Installation for Refurbishment to Refurbishment to Fu Tei Sheung Tsuen Aqua Privy, Tuen Mun | Architectural Services Department | Aug 2016-On Progress |
E&M Installation for Refurbishment of Changing Rooms at Sham Shui Po Sports Ground | Architectural Services Department | Aug 2016 -On Progress |
E & M Installation for Li Po Chun Health Centre | Architectural Services Department | Jul 2016-Nov 2016 |
Electrical Installation for Fitting Out Works to 4F & 6F Cheng Yu Tung Building, CUHK | City University of Hong Kong | Jul 2016-Nov 2016 |
Electrical & MVAC Installation for Fitting Out Works at 6/F Ho Sin Hang Engineering Building | City University of Hong Kong | Jul 2016-Sep 2016 |
Electrical, MVAC, Fire Service and P&D Installation for The Bridges Street Market as Hong Kong New-Expo at 2 Bridge Street | Hong Kong New-Expo | Jul 2016-Sep 2016 |
E&M Installation for Alteration and Addition Works for 3/F North Wing at West Kowloon Campus and 4/F Canteen at Hung Hum Bay Campus | The Hong Kong Polytechnic University | Jul 2016-On Progress |
E&M Installation for Pet Garden and a Model Car Play Area | Home Affairs Department | Jul 2016-Dec 2016 |
E&M Installation for Renovation Works on 4F of Au Shue Hung Memorial Library and 6F of Cha Chi-Ming Science Tower, HKBU | Hong Kong Baptist University | Jun 2016-Feb 2018 |
E&M Installation for Harbourview Guestroom Renovation Works to 20F and 21F | The Hong Kong Harbourview | Jun 2016-Sep 2016 |
E & M Installation for Design and Build Contract for Halal Catering Outlet at 5/F Amenities Building | City University of Hong Kong | Jun 2016-Aug 2016 |
The Chinese University of Hong Kong 702 Wong Foo Yuan Building | The Chinese University of Hong Kong | May 2016-Aug 2016 |
Diacovery Bay North Sales Office- Proposed E & M Works for Art Gallery | Hong Kong Resort Company Limited | May 2016-Jun 2016 |
E & M Installation for Reference Electrical Diagrame for Pillar Box underneath Footbridge Staircase | Tsing Lun Road | May 2016-On Progress |
12 Months Provision of Electronic and Electrcial Maintwnance Serivices at Tin Shui Wai Community Health Centre (TSWCHC) | Electrical and Mechanical Services Department | May 2016-Aug 2016 |
Provision of Fitness Equipment Near Holford And Lighting | Home Affairs Department | Apr 2016 -Apr 2017 |
Electrical Installation at Peng Chau Clinic | Home Affairs Department | Apr 2016-On Progress |
E & M Installation for Heep Hong Society Catherine Lo Centre | Heep Hong Society | Mar 2016 -On Progress |
Mei Foo Neighborhood Activity Centre | Home Affairs Department | Mar 2016-On Progress |
Cheung Sha Wan Plaza | Henderson Land Development Company Limited | Mar 2016 -On Progress |
Provision of Stage Engineering Service at Ngua Chi Wan Civic Centre | Electrical and Mechanical Services Department | Mar 2016-On Progress |
Replacement of Existing Floodlight by Energy Efficient Induction Luminaires at Lai Sua Correctional Institution, Nei Kwu Correctional Insitution and Caoe Correctional Institution | Architectural Services Department | Apr 2016 -On Progress |
Electrical Installation for Tuen Mun District Welcome Sign | Homes Affairs Department | Jan 2016 -Feb 2016 |
Tsun Yip Cooked Food Market | Architectural Services Department | Feb 2016-On Progress |
E &M Installation for Toilets on 2/F of Cityview | YWCA | Feb 2016 -Aug 2016 |
Electrical & MVAC Installation at Tuen Mun Storage Centre | Architectural Services Department | Feb 2016 -Apr 2016 |
Electrical and P&D Installation for Temporary Footbridge Works at Tai Wai Station Property Development- Addendum no 1 | MTR Corporation Limited | Feb 2016-On Progress |
2 Storeys Shop House at Sai Kung | Plaza Hut | Feb 2016 -May 2016 |
Provusion of Maintenance Services for Electrical, Mechanical and Air-conditioning Inatallations and Hospital Equipment at Siu Lam Hospital | Electrical and Mechanical Services Department | Jan 2016- On Progress |
Provision of Maintenance Services for Fire Dampers and Miscellaneous Equipment at Pok Oi Hopsital | Electrical and Mechanical Services Department | Jan 2016- Jan 2017 |
Provision of Electrical Maintenace Services at Castle Peak Hopstial | Electrical and Mechanical Services Department | Jan 2016- Dec 2016 |
Conversion of Orientation Theatre to Jin Yong Gallery at Hong Kong Heritage Museum | Leisure and Cultural Serivces Department | Jan 2016- Dec 2016 |
Electrical and MVAC Installation at Tuen Mun Public Toilet | Architectural Services Department | Nov 2015 -Sep 2016 |
Renovation of Existing E&M Installation and Builder Works for DBOC at Discovery Bay | Hong Kong Resort Company Limited | Oct 2015- On Progress |
Electrical Installation for A&A Works at Metro City Plaza II, Phase 5, Tseung Kwan O, TKOTL27 | Heng Tat Construction Co. Ltd. | Oct 2015- Sep 2016 |
Alteation Works for New Footbridge Connection at Popcorn 2 and Bauhinia Garden | MTR Corporation Limited | Oct 2015- On Progress |
Provision of Engineering Services for E&M Installation at Cape Collinson Cematorium and Columbarium | Electrical and Mechanical Services Department | Oct 2015- On Progress |
Replacement of Building Services Pipework and Chilled Water Pipes | Hong Kong Baptist University | Sep 2015-Dec 2015 |
Proposed A&A Works at 3rd Floor Tropicana Garden | Tropicana Garden | Aug 2015-Dec 2015 |
Internal and External Refurbishment of Kowloon City Road Public Toilet | Architectural Services Department | Aug 2015-Nov 2015 |
Upgrading Existing Electrical Distribution System at Staff Quarters, Shatin Racecourse | The Hong Kong Jockey Club | Aug 2015-Nov 2015 |
Provision of Engineering Services for E&M Installation and other Services at Wo Hop Shek Crematorium and Columbarium | Electrical and Mechanical Services Department | Aug 2015-On Progress |
E&M Installation for Kwun Tong Government Primary School | Kwun Tong Government Primary School | Aug 2015-Dec 2015 |
E&M Works for Sixty Eight at Granville | Sixty Eight | Aug 2015 -Nov 2015 |
12-Month Contract for Operation and Maintenance of Electrical, Mechanical and Air-conditioning Systems at Yung Fung Shee Memorial Centre and Pamela Youde Polyclinic | Electrical and Mechanical Services Department | Jul 2015-Jan 2015 |
Refurbishment of Disable Toilet at City U | City University of Hong Kong | Jul 2015-Jul 2016 |
E&M Installation of Solar Power Generating System at R/F of Hostel 4 and 5 at Lee Woo Sing College | The Chinese University of Hong Kong | Jul 2015-Sep 2015 |
Home Shanghai at Yoho Midtown | Home Shanghai | Jul 2015-Dec 2015 |
6 Month Term Contract for the Maintenance of Electrical, Mechanical, Air-conditioning and Laundary Equipment at Butterfly Beach Laundry | Electrical and Mechanical Services Department | Jun 2015-Oct 2015 |
Renovation of the Existing Library of The Hong Kong Academy for Performing Arts | The Hong Kong Academy for Performing Arts | Jun 2015-Dec 2015 |
A&A Works at Sunshine City (Western Portion) Ma On Shan | Heng Tat Construction Co. Ltd. | Jun 2015-Dec 2015 |
E&M Installation for Office at Laws Commerical Plaza | Laws Commerical Plaza | May 2015-Aug 2015 |
Design and Build of Office at To Yuen Building and Cheng Yick-Chi Building | City University of Hong Kong | May 2015-Jun 2015 |
E&M Installation for West Kowloon Cultural District | West Kowloon Culrural District | May 2015-Nov 2015 |
Provision of Engineering Services for E&M Installation and other Services at Wo Hop Shek Crematorium and Columbarium | Electrical and Mechanical Services Department | May 2015-Nov 2015 |
Provision of Electrical Maintenance Services at Catle Peak Hospital | Electrical and Mechanical Services Department | May 2015-Jul 2015 |
Provision of Engineering Services for E&M Installation at Cape Collinson Cematorium and Columbarium | Electrical and Mechanical Services Department | Apr 2015 -Apr 2016 |
Prevision of Engineering Services for E&M Installation and other Services at Kwai Chung Crematorium and Columbarium | Electrical and Mechanical Services Department | Apr 2015 -Aug 2015 |
Renovation Work at 1/F Chen Kou Bun Building of CUHK | The Chinese University of Hong Kong | Apr 2015 -Aug 2015 |
Refurbishment of Potable Water Supply System of Tai Lung AFCD Farm | Tai Lung AFCD Farm | Apr 2015 -Aug 2015 |
Proposed Power Upgrading Works at Tropicana Garden | Tropicana Garden | Mar 2015 -Jul 2015 |
5-Month Contract for Operation & Maintenance of Electrical, Mechanical and Air-conditioning Systems at Yung Fung Shee Memorial Centre & Pamela Youde Polyclinic | Electrical and Mechanical Services Department | Feb 2015 -Dec 2015 |
Provision of Conduit and Cable for Lift | City University of Hong Kong | Feb 2015 -Jul 2015 |
Provision of Engineering Works for Supporting Engineering and Maintenance Services Under MunCS | Electrical and Mechanical Services Department | Feb 2015-Nov 2015 |
St Peter Village Garden In Sai Kung | Leisure and Cultural Serivces Department | Feb 2015 -Jan 2016 |
Provision of Maintenance Services for Electrical, Mechanical and Air-conditioning Installations and Hospital Equipment a Siu Lam Hospital | Electrical and Mechanical Services Department | Feb 2015 -Jun 2015 |
Electrical Installation at Morse Park | Leisure and Cultural Serivces Department | Jan 2015 -Dec 2015 |
Provison of Mechanical Maintenance Services at Castle Peak Hospital | Electrical and Mechanical Services Department | Jan 2015 -On Progress |
Periodic Inspection, Testing and Certification WR-2 of Fixed Electrical Installation for The Chinese University of Hong Kong | The Chinese University of Hong Kong | Jan 2015 -Dec 2015 |
E&M Instalation of Shop Sixty Eight at Tsuwn Wan Plaza | Sixty Eight | Jan 2015-Dec 2015 |
Retrofit of Park Facilities and Miscellaneous Improvement Works at Wa Shun Street SOA Kowloon City | Architectural Services Department | Dec 2014 -Feb 2015 |
E&M Instalation of Shop Sixty Eight at Landmark North | Sixty Eight | Dec 2014 -Jun 2015 |
Rehabilitation of HKYWCA Kowloon | YWCA | Dec 2014 -Jan 2015 |
Enhancement of Power at North Regional Headquarter | Architectural Services Department | Dec 2014 -Aug 2016 |
MVAC Installation at No 6 Tsun Wen Road Tuen Mun | Luk’s Industrial Company Limited. | Dec 2014 -Dec 2015 |
4-Month Contract for Operation and Maintenance of Electrical, Mechanical and Air-conditioning Systems at Yung Fung Shee Memorial Centre and Pamela Youde Polyclinic | Electrical and Mechanical Services Department | Dec 2014-Nov 2017 |
Provision of operation and maintenance of electronic works for AC systems in Hong Kong international Airport | Electrical and Mechanical Services Department | Nov 2014 -Feb 2015 |
Provision of Maintenance Support Team for Terminal 1 in Hong Kong International Airport | Electrical and Mechanical Services Department | Nov 2014-Mar 2016 |
Electrical and ELV Installation for Proposed A&A Works for Wholesale Conversion of Industrial Building to Office at 8 Wang Kwong Road, Kowloon Bay, Kowloon, Hong Kong | Henderson Land Development Company Limited | Nov 2014-May 2016 |
E&M Installation for Shop Sixty Eight at Mikiki Mall G26-G27 | Sixty Eight | Oct 2014-Dec 2015 |
5-Month Contract for Operation and Maintenance of Electrical, Mechanical and Air-conditioning Systems at Yung Fung Shee Memorial Centre and Pamela Youde Polyclinic | Electrical and Mechanical Services Department | Sep 2014-Nov 2014 |
Clable Containment Installation for English Schools Foundation South Island School | English School Foundation | Sep 2014-Feb 2015 |
Provison of maintenace services for air conditioning electrical mechanical installations and water filteration system at Lam Tin Complex | Electrical and Mechanical Services Department | Aug 2014 -Nov 2014 |
Maintenance Services of Electrical Installation for Civil Aviation Department Headquarters, On-airport and Off-airport Venues for Civil Aviation Department | Electrical and Mechanical Services Department | Aug 2014 -Feb 2015 |
Aberdeen Chinese Permanent Cemetery | The Board of Management of The Chinese Permanent Cemeteries | Aug 2014 -Apr 2015 |
E & M Installation at Café 187 TPTL Tai Po | Sino Group | Aug 2014 -Jan 2016 |
Electrical Installation – Proposed Residential Development at Nos. 7-9, Ying Wa Terrace | Henderson Land Development Company Limited | Aug 2014 -Sep 2014 |
Electrical nstallation for Po Leung Kuk Luk Hing Too Primary School | Po Leung Kuk | Jul 2014-Mar 2016 |
E&M Installation at Café’ at TPTL 187 Tai Po (Providence Bay) |
Sino Group | Jun 2014-Oct 2015 |
South Island School, 50 Nam Fung Rd, Aberdeen, Hong Kong | English School Foundation | Jun 2014 -Feb 2014 |
Term Contract for Minor Electrical Works at Various Locations of the CUHK for one year from 16 June 2014 to 30 June 2015 (Tender No. EMO-140505) | The Chinese University of Hong Kong | Jun 2014 -Apr 2015 |
Electrical Work for Fire Service Upgrading Works to Building Blocks of Police Driving and Traffic Training Division | Hong Kong Police Force | Jun 2014 -Oct 2015 |
180-Refurbishment to Hong Keung Street Public Toilet, Wong Tai Sin, Kowloon | Architectural Services Department | May 2014-Sep 2016 |
Provision of Electrical Maintenance Services at Butterfly Beach Laundry | Electrical and Mechanical Services Department | May 2014-Aug 2015 |
Operation and Maintenance Works for On-airport and Off-airport Venues for Civil Aviation Department | Electrical and Mechanical Services Department | May 2014-Apr 2015 |
E & M Installation at Tong Shui Road Toilet | Architectural Services Department | May 2014-Aug 2014 |
E & M Installation at Shop 126 to 127 Olympian City 2 | Sino Estates Management Limited | Apr 2014 -Jan 2015 |
Electrical Installation at Fu Hong Street Sitting Out Area | Architectural Services Department | Apr 2014 -Sep 2015 |
Operation and Maintenace Services for Kwai Chung Crematorium | Electrical and Mechanical Services Department | Apr 2014-Nov 2015 |
Operation and Maintenace Services for Fu Shan Crematorium | Electrical and Mechanical Services Department | Apr 2014 -Mar 2015 |
置富都會-新造L7及L8緊急電源線路工程 | Cheung Kong (Holdings) Limited | Apr 2014 -Mar 2015 |
E&M Work at 313 prince road | Paxton | Apr 2014 -Jun 2014 |
E&M Installation at Tuen Mun Law Courts Building | Architectural Services Department | Apr 2014 -Apr 2014 |
Supply and installation of Audiology Examination Syite for Alice Ho Miu Ling Nethersole Hospital | Hospital Authoity | Mar 2014-Mar 2015 |
P&D, Electical, MVAC & Chiller Plant Installation The Hong Kong Polytechnic University Alteration and Addition Works at W7/F |
The Hong Kong Polytechnic University | Mar 2014-May 2015 |
Waterfront Installation of Acoustic Panel and Silencers | Ocean Park | Mar 2014 -Jun 2015 |
Operation and Maintenance of Electrical and Mechanical Installations at Wo Hop Shek Crematorium and Columbarium | Electrical and Mechanical Services Department | Mar 2014 -Jun 2015 |
Provision of Mechanical Maintenance Services at Castle Peak Hospital Service Provided by Resident Maintenance Team Mechanical Technician II on January-14 and February-14 (Mr, Cheung Ying-lung, Mr. Ho Wai-ki and Mr. Lai Kwok-fei) | Electrical and Mechanical Services Department | Feb 2014-Apr 2014 |
Provision of Maintenance Services for Electrical Mechanical and Air-conditioning Installations and Hospital Equipment at Siu Lam Hospital | Electrical and Mechanical Services Department | Feb 2014 -Apr 2014 |
Electrical, Mechanical Ventilation & Frie Services of Enabling Works for Renovation at Tsing Yi Commercial Complex | The Link Management Limited | Jan 2014 -Jan 2015 |
Provision of Mechancical Maintenace Services at Castle Peak Hospital | Electrical and Mechanical Services Department | Jan 2014 -Jul 2014 |
Provision of Engineering and maintenace service for crematoriums | Electrical and Mechanical Services Department | Jan 2014- Dec 2014 |
The Salvation Army Headquarters and Booth Lodge at No. 11, Wing Sing Lane, Yaumatei, Kln. | The Salvation Army | Jan 2014- Dec 2014 |
E&M Installation at Shing Mun Valley Swimming Pool | Leisure and Cultural Serivces Department | Dec 2013-Aug 2014 |
E&M Installation at Level 1 amd Room 201 Academic and Administration Building HKBU | Hong Kong Baptist University | Dec 2013 -Jan 2016 |
Supply and installation of electrical and water check meter for cost allocaion | Sino Estates Management Limited | Dec 2013 -Sep 2014 |
Electrical Installation of the Proposed Addition & Aleration at Citimall, Y.L.T.L. 464, Yuen Long, New Territories | Henderson Land Development Company Limited | Nov 2013 -Jun 2015 |
Electrical Installation for Addition and Alternation Works at Metro City Plaza, II, Tseung Kwan O, TKOTL27, Phase 3 | Henderson Land Development Company Limited | Nov 2013-On Progress |
E&M Work at Mei Lam Estate | The Link Management Limited | Nov 2013 -Dec 2015 |
Interior Fit-out Works for Café’ at Tai Po TPTL 187 | Sino Group | Nov 2013 -Nov 2014 |
Refurbishment of Sheung Yuen Street Public Toilet | Architectural Services Department | Nov 2013 -Dec 2013 |
E&M Installation at Mei Tin Estate | Tung Wah Group of Hospitals | Oct 2013- Oct 2014 |
E&M Installation at G/F and 1/F Kingswood Ginza, Phase 2 Tin Shui Wai | Cheung Kong Property Development Ltd. | Oct 2013- May 2014 |
Po Leung Kuk YCC Centre | Po Leung Kuk | Oct 2013- May 2014 |
Yau Oi Estate Temporary Site Office | The Link Management Limited | Oct 2013- Dec 2013 |
Proposed for the Commercial Development at 1L-1M Sai Yeung Choi Street South, Mongkok | Times Investment Limited | Oct 2013- Nov 2013 |
Main Contract for the Renovation Works at Yau Oi Shopping Centre (Phase 3 – Yau Oi Shopping Centre) | The Link Management Limited | Sep 2013-Mar 2014 |
HI172-HKJEBN-Improvement Works at 3/F., Tropicana Garden-switchboard Replacement | Hsin Chong Construction Group Limited | Sep 2013-Sep 2015 |
Installation at 8/F Royal Plaza Hotel | Royal Plaza Hotel | Sep 2013 -Aug 2014 |
Celestial Garden Whole Building Renovation | Jones Lang LaSalle | Sep 2013-Oct 2013 |
E&M Works for Caritas Lok Hang Workshop and Lok Chung Hostel | Caritas Hong Kong | Aug 2013 -Dec 2014 |
WR2 defects rectification work at Management Office, Wisdom Court, 5 Hatton Road, Hong Kong | Jones Lang LaSalle | Aug 2013 -Dec 2014 |
Renovation of Ground Floor Lobby at St. John’s Building | St. John’s Building | Aug 2013 -Dec 2013 |
Home Care Centre for girls at 1/F Ching Kwai House Cheung Tsing Estate | Home Affairs Department | Aug 2013-Nov 2013 |
Ling Ying Public School-Supply temporary power for Building B Construction | Architectural Services Department | Jul 2013-Oct 2013 |
Renovation Works for Prining Room (OEM503 to OEM506) at Hong Kong Bapist University | Hong Kong Baptist University | Jul 2013-Sep 2013 |
Fitting-out Works to YMCA Shek Kip Mei | YMCA | Jun 2013-Nov 2013 |
E&M Installation Renovation Works for Chinese YMCA of Hong Kong Tin Ping Neighborhood Elderly Centre at Unit 116, 117 & 119, G/F., Tin Ming House, Tin Ping Estate, Sheung Shui, N.T. | YMCA | Jun 2013-Oct 2013 |
Renaissance College, No. 2 Hang Ming Street, Area 90B, Ma On Shan, Shatin, Lot No. 522 | English School Foundation | Jun 2013-Oct 2013 |
Shop Re layout at Level 3 at China Hong Kong City | Sino Group | Jun 2013-Oct 2013 |
Japanese & Vietnamese Restaurant – 4/F Lee Garden II | 1957 & Co. | Jun 2013-Sep 2013 |
Electrical works at Repuelse Bay Garden | Repulse Bay Garden | Jun 2013-Aug 2013 |
Provision of Statutory Inspection of Fixed Electrical Installations at Block C of The Open University of Hong Kong | The Open University of Hong Kong | May 2013-Dec 2014 |
Bone Ash Handling Works for Cremators at Fu Shan Crematorium and Kwai Chung Crematorium | Electrical and Mechanical Services Department | May 2013-Dec 2013 |
Comprehensive Operation and Maintenance Works for On-airport and Off-airport Buildings | Electrical and Mechanical Services Department | Apr 2013 -Jan 2014 |
E&M Installation at Temporary Container works at Quarry Bay School | English School Foundation | Apr 2013-Jun 2014 |
Installation of an External lift for the Youth Square in Chai Wan | Architectural Services Department | Apr 2013-May 2013 |
Dah Sing Bank – 13 Branches | Dah Sing Bank | Mar 2013-Aug 2014 |
HKEAA Tai Hing Estate Centre, Tai Hing Estate, Phase 1, Tuen Mun | Hong Kong Examinations and Assessment Authority | Mar 2013 -Aug 2013 |
Operation and Maintenance of Cremators and Other Engineering Installations at Cape Collinson Crematorium and Columbarium | Electrical and Mechanical Services Department | Mar 2013 -Apr 2013 |
Management Office 5 Hatton Road, Hong Kong | Jones Lang LaSalle | Feb 2013 -Jan 2014 |
Provision for electrical maintenance works carried out in municipal venues of Hong Kong Region | Electrical and Mechanical Services Department | Feb 2013 -Dec 2013 |
Operation and Maintenance of Electrical and Mechanical Installations at Wo Hop Shek Crematorium and Columbarium | Electrical and Mechanical Services Department | Jan 2013 -Feb 2014 |
Supply & Installation of T5 Lighting Fixtures for Siu Kwai Court at Tuen Mun | Hon Yip Services Company Limited | Jan 2013 -Feb 2014 |
E & M Installation at Hip Cellar Roof Cooling Tower Installation | Hip Cellar Limited | Jan 2013 -Sep 2013 |
E & M Installation at Hip Cellar 5/F | Hip Cellar Limited | Jan 2013 -Apr 2013 |
A&A Works of Commercial Building on I.L.s 7311-7314 at Gluocester Road and O’brien Road, Hong Kong | Sun Properties Company Limited | Jan 2013 -Apr 2013 |
Electrical Installation at Tin Hau Temple Road Park | Architectural Services Department | Dec 2012 -Jan 2016 |
Electrical and ACMV Installation for Quarry Bay Market | Architectural Services Department | Dec 2012 -Dec 2013 |
Builder / M&M system installation work for 3/F PABX equipment room | Island Pacific Hotel | Dec 2012-Oct 2013 |
Electrical Installation for Workers Children Secondary School | Architectural Services Department | Dec 2012-Oct 2013 |
Electrical and MVAC Installation at SV1 and SV2 Electronic Area at East Hall HKIA | Nuance Watson | Dec 2012-Oct 2013 |
Improvement Works to Play Area TWGHs Wong Chu Wai Fun Kindergarten | Tung Wah Group of Hospitals | Dec 2012 -Jan 2013 |
Fitting Out Works to Residential Showflat and Sales Centre at Basement of Bank of America Tower | Couture Homes | Dec 2012 -Jan 2013 |
Defects Rectification Works of Low Voltage Installations at Shan Tsui Court, 200 Tai Tam Road, Chai Wan, Hong Kong | ISS EastPoint Property Management Ltd. | Nov 2012 -Aug 2013 |
MVAC Installation For St. Paul’s College Primary School at 777 Victoria Road, Hong Kong | St. Paul’s College | Nov 2012 -Jun 2013 |
(IT12/055HN) Design, Supply and Installation of power socket outlets on the benches of lecture theaters in academic 2 | City University of Hong Kong | Nov 2012 -Jan 2013 |
Jockey Club New Hall at Tuen Mun T.M.T.L. No.376 for Lingnan University | Lingnan University | Nov 2012 -Jan 2013 |
Kornhill Gardens (PSPS) Mgt. Office G/F., Block 5 Kornhill Gardens, Quarry Bay, Hong Kong | MTR Corporation Limited | Oct 2012 -Dec 2013 |
Mango Tree at Shop 2032-2033, The Elements | 1957 & Co. | Oct 2012 -Jun 2013 |
IT12/026SE City U | City University of Hong Kong | Oct 2012 -Jan 2013 |
Supply and Installation of electrical installations for ventilation systems at Tiu Keng Leng, Tseung Kwan O, Wu Kai Sha Station Public Transport Interchange | Electrical and Mechanical Services Department | Sep 2012 -Dec 2012 |
(1194EM12S) 18-month Term Contract for Maintenance of Electrical, Mechanical, and Air-conditioning Installations and Hospital Equipment at Siu Lam Hospital | Electrical and Mechanical Services Department | Aug 2012-Nov 2012 |
Fanling Rhenish Church Secondary School Library | Fanling Rhenish Church Secondary School | Jul 2012-Feb 2014 |
E&M Quotation Kwai Hing Public Toilet | Architectural Services Department | Jul 2012-Oct 2013 |
E&M Installation at Kowloon Shangri-LA Hotel Kowloon Room | Shangri-LA Hotel | Jul 2012-Jan 2013 |
Po Leung Kuk Shek Kip Mei Small Group Home | Po Leung Kuk | Jul 2012-Sep 2012 |
E&M Work Staff Resturant at Repulse Bay | The Hong Kong and Shanghai Hotels Limited | Jul 2012-Aug 2012 |
E&M Installation at Proposed Food Factory at TIK 12-13 Tiu Keng Leng Station | Sushi Take-Out | Jul 2012-Aug 2012 |
E&M Installation at Kowloon Shangri-LA Hotel | Shangri-LA Hotel | Jul 2012-Aug 2012 |
Lighting Installation at Kai Tak CLP Temporary Transformer Room | CLP Power Hong Kong Limited | Jul 2012-Aug 2012 |
E&M Installation at G/F Kingswood Ginza, Phase 2 Tin Shui Wai | Sino Group | Jul 2012-Aug 2012 |
MVAC and PD Work Staff Restaurant Kitchen at Repulse Bay | Repulse Bay Hotel | Jun 2012-Jan 2013 |
Term Contract-Building Services Repairs and Maintenance Term Contract 2012/2015 The Hong Kong Polytechnic University | The Hong Kong Polytechnic University | Jun 2012 -Jul 2012 |
Phase 1 Main Contract for Redevelopment of St. Francis’ Canossian College at 9-13 Kennedy Road, Wanchai,Hong Kong | St. Francis’ Canossian College | May 2012-May 2015 |
Electrical and MVAC Installation at Nam Shan Estate Carpark | City University of Hong Kong | May 2012-Jul 2014 |
Electrical and MVAC Installation at AC2, City University of Hong Kong | City University of Hong Kong | May 2012-Sep 2012 |
E&M Installation at Royal Pacific Hotel | Royal Pacific Hotel | Apr 2012-May 2012 |
E&M Renovation of Lavatories at 9/F, 10/F, 11/F, 14/F & 24/F, Park-In Comm. Centre | Hang Lung Properties | Mar 2012 -Jun 2012 |
E&M Renovation of Wanchai Market | Social Walfare Dapertment | Feb 2012 -Apr 2012 |
Mango Tree Thai Restaurant – 5/F, 1 Hoi Ping Road | Mango Tree Thai Restauran | Dec 2011 -Jul 2013 |
Building & Refurbishment Works for OCC Migratiion | MTR Corporation Limited | Oct 2011 -Dec 2011 |
Electrical Installation at 25 Wang Lok Street Yuen Long Industrial Estate | Yuen Long Industrial Estate | Sep 2011 -Aug 2013 |
Lung Mun Oasis | Synergis Services Management Ltd. | Sep 2011 -Aug 2012 |
HKUST upgrade lab of Rm7108,1709,7110 & 7118 | Hong Kong University of Science and Technology | Sep 2011-Mar 2012 |
Conversion of Service Counter on 1/F and Extension of Service Counter on 13/F at CIE Shek Mun Campus , No 8 On Muk Street , Shek Mun , Shatin | Hong Kong Baptist University | Aug 2011 -Dec 2011 |
E&M Installation at Shatin Junior School | English School Foundation | Jul 2011-Sep 2011 |
Annual FMRII Works & Classroom Block Vertical Extension Works at Shatin College | English School Foundation | Jun 2011 -Aug 2012 |
Addition and Alteration Works at Portion of G/F, 2/F & upper 2/F, 413 Castle Peak Road, Cheung Sha Wan | Hong Kong Housing Society | Jun 2011 -Jun 2012 |
Exchange Lighting Fittings in Harbour Centre Tower 2 Public Area | Citybase Property Management Limited | Jun 2011- Oct 2011 |
The Electrical Installation, Ventilation Installation and Builder’s Works for Central Meal Portioning at 7 Numbers Subvented School in NT Areas | Electrical and Mechanical Services Department | Jun 2011- Oct 2011 |
Lighting Retrofit Works for Energy Efficiency Project In Pacific Trade Centre | Sino Estates Management Limited | Jun 2011- Sep 2011 |
E & M Installation for Renovation Works (Internal & External ) for Existing Hoi Bun School , Lei Yue Mun , Kln | Innovative Design Group Ltd. | Jun 2011- Jul 2011 |
Addition and Alteration Works at 12 Kai Chiu Road, Causeway Bay | Perfect Land Asia Limited | May 2011-Jul 2011 |
E&M Reinstatement Works at Fisherman’s Wharf | Cheung Kong (Holdings) Limited | Mar 2011 -Jul 2011 |
E&M Installation Works for Aon China Building 1/F Office | Hutchison Whampoa Property Limited | Feb 2011 -Apr 2011 |
12 Months Term Contract for Maintenance of Electrical, Mechanical and Air-conditioning Installations and Hospital Equipment at Siu Lam Hospital | Electrical and Mechanical Services Department | Feb 2011-Mar 2011 |
Refurbishment fo shops and station facilities at URL/LAR stations | MTR Corporation Limited | Jan 2011- Dec 2011 |
Dah Sing Bank-Mongkok Branch at B/F-G/F, No. 697 Nathan Road, Mongkok | Dah Sing Bank | Oct 2010- Jul 2011 |
Italian Restaurant at 11/F., 1 Hoi Ping Road, Hong Kong | Italian Restaurant | Oct 2010- Mar 2011 |
Electrical, MVAC and PD Intstallation at TMTL Jusco Store on UG/F and 1/F | Tuen Mun Town Plaza | Oct 2010- Dec 2010 |
Major Renovation of Stanley Plaza, Stanley, Hong Kong (Phase 1b) | The Link Management Limited | Sep 2010-May 2011 |
Caritas Bianchi Lodge at 4 Cliff Road, Yau Ma Tei, Kowloon | Caritas Hong Kong | Aug 2010 -Nov 2011 |
E & M and P & D Installation of Renovation Lavatories at Metropolis Mall | Metropolis Mall | Aug 2010 -Mar 2011 |
Fit-Out Work of Wellendorff Store at IFC Mall | Internation Finance Centre | Aug 2010 -Dec 2010 |
HKAPA-Proposed extension of 1F over carpentry workshop at theatre block | Hong Kong Academ for Performing Arts | Aug 2010-Oct 2010 |
Renovation work at Rm 905, Sir Run Run Shaw Bldg, HSH Campus | Hong Kong Baptist University | Aug 2010 -Sep 2010 |
E & M Installation Work at Leighton Centre G/F and 8/F | Hysan Development Company Limited | Aug 2010 -Sep 2010 |
Tuen Mun Town Plaza 209 | Sino Group | Jul 2010-Sep 2011 |
Supply and installation of T5 Fluorescent lamps at Tung Wah Group of Hospitals’ (TWGHs) Schools | Tung Wah Group of Hospitals | Jul 2010-Dec 2010 |
H&M Shop | H&M | Jul 2010-Oct 2010 |
Excelsior Hotel 1/F, 2/F & 3/F Washrooms | Excelsior Hotel | Jul 2010-Sep 2010 |
Proposed New Roof Extension for Victoria Shanghai Academy at Shum Wan Road, Aberdeen | Victoria Shanghai Academy | Jun 2010-Dec 2010 |
Fitting Out Works for Caritas Community Centre-Caine Road (A2R) G/F, 2/F, 4/F&5/F at Caritas House, 2 Caine Road, HK | Caritas Hong Kong | Jun 2010-Dec 2010 |
24-month contract for operation and maintenance of electrical, mechanical & air-conditioning systems at Yung Fung Shee Memorial Centre & Pamela Youde Polyclinic | Electrical and Mechanical Services Department | Jun 2010-Nov 2010 |
RFQ: 2869 – Exit Sign Replacement from T8 Conventional Ballst to LED | The Hong Kong Jockey Club | May 2010-May 2012 |
Main Entrance and Assembly Hall Renovation Works for St. Paul’s College at No. 69 Bonham Road, HK | St. Paul’s College | May 2010-May 2011 |
Maintenance Contract for Electrical System and Plumbing System | Tung Wah Group of Hospitals | May 2010-Dec 2010 |
Wong Chan Sook Ying Memorial School at Yuen Long | Architectural Services Department | Apr 2010 -Apr 2011 |
Fitting-out Works for 12/F., Renal Dialysis Unit and General Words, The Hong Kong Sanatormium & Hospital | Hong Kong Sanatormium & Hospital | Apr 2010 -Jan 2011 |
E & M Installation at BOC Mongkok Building | Bank of China (Hong Kong) Ltd. | Feb 2010-Oct 2010 |
RFQ 2631 – Capital Works Replacement of Energy Saving Luminaires for Block A B C D and RCV Staff Quarter Shatin | The Hong Kong Jockey Club | Feb 2010-May 2010 |
Replacement of Lighting System at Lok Ma Chau Spur Line Control Point, Births, Deaths & Marriage Registry Office, C&ED Venues | Electrical and Mechanical Services Department | Jan 2010-Apr 2010 |
Rest Garden at Open Space at J/O Hung Hom Road and Hung Lai Road | Home Affairs Department | Dec 2009-Aug 2010 |
E & M Installation at MTR Security Opertaion Centre at HTD and Canopy at HEO | MTR Corporation Limited | Dec 2009 -Jul 2010 |
Supply labour & meterial to carry out electrical installation works under our document with ref. no.:RFQ2697 | The Hong Kong Jockey Club | Dec 2009-May 2010 |
Promenade near Block 10, Phase II, South Horizons | South Horizons Management Ltd | Dec 2009-Apr 2010 |
8/F, St. Paul’s Hospital, Causeway Bay | St. Paul’s Hospital | Dec 2009 -Dec 2009 |
Office to Kindergarten, Stubbs road (ESF Centre) 43B Stubbs Road |
English School Foundation | Nov 2009 -Jan 2010 |
Mei Foo Phase 7 shopping centre | The Incorporated Owners of Mei Foo Sun Chuen | Nov 2009 -Jan 2010 |
Lam Tsuen River Lighting Installation | Home Affairs Department | Sep 2009-May 2010 |
Satay Inn and Function Rooms of Hong Kong Gold Coast Hotel | Sino Group | Sep 2009-May 2010 |
CLP Power Cable Tunnel Project Construction of Wu Shan Recreational Playground | CLP Power Hong Kong Limited | Sep 2009-Nov 2009 |
Refurbishment of Playground (Phase II) at Kwong Fai Circuit Kwai Chung | Architectural Services Department | Sep 2009-Oct 2009 |
Multi-purpose Hall for Kennedy School, English Schools Foundation | English School Foundation | Aug 2009 Oct 2009 |
City U-Student Residence WR2 | City University of Hong Kong | Jul 2009-Sep 2009 |
South Island School, 50 Nam Fung Rd, Hong Kong | English School Foundation | Jun 2009- Nov 2009 |
Kwu Tung Show House | Sino Group | Jun 2009-Aug 2009 |
Replacement of Light Fittings at Fencing Walls Surrounding The Main Campus | Lingnan University | Jun 2009-Jul 2009 |
Overhaul and Renovation of 80-seater Classrooms (Phase II), City University of Hong Kong | City University of Hong Kong | May 2009-Oct 2009 |
Constuction of Mezzanine Floor on 2/F., Theatre Block of Academy at the Hong Kong Academy for Performing Arts, 1 Gloucseter Road, Wanchai, Hong Kong | ISS EastPoint Property Management Ltd. | May 2009-Oct 2009 |
Renovation Works at the Entrance of Computer Laboratory for Department of Computer Science fpr City U of H.K. | City University of Hong Kong | May 2009-Sep 2009 |
9/F of Blcok R and G/F Lobby of Block K, Queen Elizabeth Hospital for Chinese Medicine Clinic of Hong Kong Baptist University | Hong Kong Baptist University | May 2009-Aug 2009 |
E & M Installation at Hing Wah Estate | The Link Management Limited | May 2009-Jul 2009 |
CUHKFAA Chan Chun Ha Secondary School | CUHKFAA Chan Chun Ha Secondary School | Mar 2009 -Mar 2012 |
E&W Works of Temporary Site Office of Central Park Towers (Phase 2) at Shops 907-912, Level 9, Metropolis Mall | Cheung Kong Property Development Ltd. | Feb 2009-Nov 2009 |
AA&I Project 2008-2009 Installation Occupancy Sensors to Lighting of Toilets at Ho Sin Hang, Shaw and Baptist University Road Campuses |
Hong Kong Baptist University | Feb 2009-Mar 2009 |
City U Library Subject Village |
City University of Hong Kong | Jan 2009- Apr 2009 |
Shatin YWCA – Electrical and MVAC Installation | YWCA | Dec 2008 -Apr 2009 |
To Install Electric Instant Water Heaters and Cleansing Water Taps | Hong Kong Baptist University | Oct 2008-Nov 2008 |
Lingnan University SO301 of the Dorothy Y L Wong | Lingnan University | Oct 2008- Nov 2008 |
Health Sector Services (Kowloon West) Sub-division | Electrical and Mechanical Services Department | Oct 2008- Nov 2008 |
Library Public Services Facilities | City University of Hong Kong | Sep 2008-Mar 2009 |
Electrical and MVAC Installation for Design and Build conversion of cooling, condensate and grey water to irrigation water | City University of Hong Kong | Sep 2008 -Dec 2008 |
16/F Whole Floor in Kennedy Town Centre | Joint Quality Review Committee Ltd. | Sep 2008 -Dec 2008 |
City U Library Media Modification | City University of Hong Kong | Sep 2008-Oct 2008 |
Proposed Construction of Management Office at Sui Wo Court, Shatin | Kai Shing Management Services Ltd. | Sep 2008 -Oct 2008 |
Teaching and Office Areas for ELC at City University of Hong Kong | City University of Hong Kong | Aug 2008 -Oct 2008 |
5/F Two Harbourfront, Whampoa | Hutchison Whampoa Property Limited | Aug 2008 -Oct 2008 |
Alternation & Addition Work at Kingswood Ginza Plaza on T.S.W.T.L. No.4 | Cheung Kong Property Development Ltd. | Aug 2008 -Sep 2008 |
Vigers-Renaissance College | English School Foundation | Jul 2008-Dec 2008 |
Tuen Mun Gold Coast Piazza | Sino Group | Jul 2008-Oct 2008 |
Renovation of School of Continuing and Professional Education (SCOPE)-Ka Chi School | City University of Hong Kong | Jul 2008-Oct 2008 |
City U 7/F Design and Build for Upgrading of Sitting and Reception Areas for Faculty of Business | City University of Hong Kong | Jul 2008-Sep 2008 |
E&M Installation at Block C, Level 2 of St. Paul’s Hospital | St. Paul’s Hospital | Jul 2008-Sep 2008 |
Renovation of 2/F, 3/F & 4/F Offices & Stores at Shatin Club House | The Hong Kong Jockey Club | Jul 2008-Sep 2008 |
Annual Maintenance for Swimming Pool Area at 4/F., Chinese YMCA of HK Kowloon Centre, 23 Waterloo Road, Kln | YMCA | Jul 2008-Aug 2008 |
Olympian City II G/F Food Court 400A TPN Power Supply Installation | Sino Group | Jun 2008-Jul 2008 |
The Palace, Broadcast Drive | City University of Hong Kong | Jun 2008-Jul 2008 |
Provision of Maintenance Support Services on Airport Engineer Systems at HK International Airport | Electrical and Mechanical Services Department | May 2008-Nov 2008 |
Renovation of G/F Lobbies at Blocks J to M of Kornhill | MTR Corporation Limited | May 2008-Oct 2008 |
Unit A, 20/F., Carnation Court, 43 Tai Hang Road, Hong Kong | Residential Flat | May 2008-Jun 2008 |
Alteration Works to G/F Area Chinese YMCA of HK – YM Concept (Dio Boy School) | YMCA | Apr 2008 -Jul 2008 |
21/F., Office Renovation at One Harbourfront | Whampoa Property Management Limited | Apr 2008 -Jun 2008 |
109 Repulse Bay Road, Repulse Bay Hotel | The Hong Kong and Shanghai Hotels Limited | Apr 2008 -Apr 2008 |
1/F male and female lavatories of British Council | British Council | Apr 2008 -Apr 2008 |
Went Iandfill Office Renovation | Swire Sita Waste Serices Ltd. | Mar 2008 -Oct 2008 |
Additional Power Supply to Various Lan Rooms Within The Campus (Phase II) | Lingnan University | Mar 2008 -Aug 2008 |
New Archives for Library at Grandtech Centre | City University of Hong Kong | Mar 2008 -Jul 2008 |
DBS Bank (HK) Ltd. at Queen’s Road Central G/F, 1/F & 22/F for Core Banking | DBS Bank (HK) Ltd. | Feb 2008 -Jun 2008 |
A&A Works for Ocean Terminal and Ocean Centre Link | Harbour City Estates Limited | Feb 2008-May 2008 |
Renovation Works at Sin Hua Bank Building Electrical and Drainage Installation Works | Bank of China (Hong Kong) Ltd. | Feb 2008 -Apr 2008 |
Lecture Theatres LT5, LT7, LT9, LT10, LT11 & LT12 | City University of Hong Kong | Feb 2008-Mar 2008 |
Renovation Works at Chak On Estate Market, Shek Kip Mei | City University of Hong Kong | Jan 2008 -Jul 2008 |
Inno Centre, 72 Tak Cee Avenue, City University of HK | City University of Hong Kong | Jan 2008 -May 2008 |
Entrance of Computer Laboratory, 2/F Mon Man Wai Building and 6/F Academic Building, for Department of Computer Science, City University of HK | City University of Hong Kong | Jan 2008 -Apr 2008 |
No. 10 Lai Yin Lane, Tung Lo Wan Rd., Causeway Bay, Hong Kong | The Chinese Rhenish Church Hong Kong Synod | Dec 2007 -Jan 2008 |
AA&I Project 2006/2007 Improvement to Campus Safety and Emergency Response System- Supply and installation of Trunking at Shaw Campus |
Hong Kong Baptist University | Oct 2007-Jun 2008 |
Renovation of toilets and Baby Care Room at G/F., UG/F. and 1/F. of Shopping Arcade at Olympian City Phase II | Sino Group | Oct 2007- Apr 2008 |
Grand Century Place at Levels 18 and 19 | City University of Hong Kong | Oct 2007- Nov 2007 |
No. 5 Hang Ming Street, Ma On Shan, Renaissance College | English School Foundation | Oct 2007- Nov 2007 |
The Salvation Army Chuk Yuen Centre for Senior Citizens | Salvation Army | Oct 2007- Oct 2007 |
The Hong Kong Polytechnic University, Ventilation Improvement to Corridors at Student Halls of Residence | The Hong Kong Polytechnic University | Sep 2007-Nov 2007 |
Satay Inn at Shop 3, Tower1, China Hong Kong City, 33 Canton Road, Tsim Sha Tsui, Kowloon | Sino Group | Aug 2007-Nov 2007 |
Hong Kong Baptist University at Wu Chung 26/F | Hong Kong Baptist University | Jul 2007-Sep 2007 |
Fitting out of learning commons and spatial reorganization of Run Run Shaw Library, City University of Hong Kong | City University of Hong Kong | Jul 2007-Sep 2007 |
E&M Installation Nominated Sub-Contract for Promenade Renovation at Harbour Plaza HK | Whampoa Property Management Limited | Jul 2007-Jul 2007 |
Design & Build of Renovation Works at Telford Annex City University of Hong Kong | City University of Hong Kong | Jun 2007 -Oct 2007 |
Renovation of G/F Lobbies at Blocks N to R of Kornhill | MTR Corporation Limited | Jun 2007 -Aug 2007 |
Shop MA, MF, Wing Tak Mansion, 15 Canal Road West, Causeway Bay, HK ($10 Shop) | AEON Store | May 2007-Aug 2007 |
Gold Coast Hotel-Wedding Garden | Sino Group | May 2007-Jun 2007 |
2C33CT07-Replacement of Lighting Installations at Lo Wu Control Point | Electrical and Mechanical Services Department | May 2007-May 2007 |
Provision of Maintenance for Electrical Installation of the OUHK (Term Contract 12 February 2007 – 11 February 2009) | The Open University of Hong Kong | Mar 2007 -Jun 2007 |
English School Foundation – Renovation of House 6, 7 & 8 Ruby Chalet, Mang Kung Wo Road | English School Foundation | Feb 2007 -Jan 2009 |
City University of Hong Kong SGS Office | City University of Hong Kong | Feb 2007-Apr 2007 |
NKIL 1175-117 Sales Office | Sino Group | Feb 2007-Mar 2007 |
Grand Lisboa Hotel & Casino Macau 12-Main Buffet | Action Design Company Limited | Feb 2007 -Feb 2007 |
Kwai Chung Plaza Addition of 2500A Main Switchboard and Distribution System | The Incorporated Owners of Kwai Chung Plaza | Feb 2007 -Jan 2007 |
Overhaul and Renovation of Lecture Theatres LT13, LT15 & LT17 for City University of Hong Kong | City University of Hong Kong | Jan 2007 -Jul 2007 |
Supply and Installation of LED Exit Signs at LCSD Various Venues in N.T. Region | Electrical and Mechanical Services Department | Jan 2007 -Jun 2007 |
16/F MLC Millennia Plaza | Goodwell-Prosperity Property Services Ltd. | Jan 2007- May 2007 |
Re-modelling of Lecture Theatre 14 | City University of Hong Kong | Jan 2007- Mar 2007 |
Lighting Replacement for Carpark of Chinese Recreation Club | Chinese Recreation Club | Dec 2006 -Jan 2007 |
City University – Wind Tunnel at Mong Man Wai Bldg. | City University of Hong Kong | Oct 2006 -Apr 2007 |
MTR Enhancement works contract no C7806-06C | MTR Corporation Limited | Oct 2006 -Dec 2006 |
Lighting Retrofit in Tai Po Hospital and North District Hospital | Electrical and Mechanical Services Department | Oct 2006- Nov 2006 |
1/F to 3/F Main Atrium Tuen Mun Town Plaza T.M.T.L. 209 | Sino Group | Sep 2006-Jan 2007 |
G/F Block B, Chinese Recreation Club, 123 Tung Lo Wan Road | Chinese Recreation Club | Sep 2006-Dec 2006 |
ST Paul’s School & S.K.H. Kei Hau Secondary School | Architectural Services Department | Aug 2006 -Nov 2006 |
Electrical installation for Show House No. 27 & 93, Man Kei Toi, Pak Sha Wan, Sai Kung | Nam Fung Development Ltd. | Aug 2006 -Aug 2006 |
Squash Court No. 3 in Laguna City Residential Clubhouse 1 | Citybase Property Management Limited | Jun 2006- Nov 2006 |
Mechanical Ventilation Improvement at Public Transport Interchange | Sino Group | Jun 2006- Aug 2006 |
Tai Po Tai Yuen Estate Grace Church | Remembrance of Grace Church | May 2006-Aug 2006 |
Po Leung Kuk Wong Wing Shu Primary | Po Leung Kuk | May 2006-Jul 2006 |
Warehouse Development at 14-18 Tsing Tim Street, Tsing Yi | Fly King Transportation Co. Ltd. | May 2006-Jul 2006 |
6/F Blk B, Chinese Recreation Club, 123 Tung Lo Wan Rd., Tai Hang, HK | Chinese Recreation Club | May 2006-Jun 2006 |
Design and Build Fitout works for YCY Health Centre | City University of Hong Kong | Apr 2006 -Dec 2006 |
Tsim Sha Tsui Centre | Sino Group | Mar 2006 -Aug 2006 |
Pacific Hong Kong Centre | Sino Group | Dec 2005 -Feb 2006 |
To Yuen Building | City University of Hong Kong | Dec 2005 -Feb 2006 |
Purple Zone 2/F additional Classroom | City University of Hong Kong | Nov 2005 -Dec 2005 |
Whampoa Garden Site 12 Electrical & MVAC Installation for Basement One Retail Refit | Hutchison Whampoa Property Limited | Sep 2005 -Dec 2005 |
Computer Laboratory of Library | City University of Hong Kong | Aug 2005-Nov 2005 |
Beacon Hill Primary School 5/F & 6/F Renovation | English School Foundation | Jul 2005-Sep 2005 |
CityU New Teaching Laboratory for CS at MMW (2/F) | City University of Hong Kong | Jun 2005-Aug 2005 |
E-logistics laboratory for department of management sciences, City University | City University of Hong Kong | Jun 2005-Aug 2005 |
Display Cabinet in Council Chamber Baptist University | Hong Kong Baptist University | May 2005-Aug 2005 |
City University Teaching Lab Rooms (Bis Laboratories) | City University of Hong Kong | May 2005-Jun 2005 |
CityU New Teaching Laboratory for CTL at AC Bldg 7/F | City University of Hong Kong | May 2005-Jun 2005 |
A&A works at China Hong Kong City, 33 Canton Road, Kowloon | Sino Group | May 2005-Jun 2005 |
La Salle Place, 51-53 La Salle Road | La Salle Place | May 2005-Jun 2005 |
House 19, Fei Ngo Shan | Owner of the House | May 2005-May 2005 |
IVE Term Contract 2005-2008 | IVE | Apr 2005 -Nov 2005 |
Skyline Tower Electrical Installation to PMD at 3/F | Sino Group | Feb 2005 -Feb 2008 |
Electrical & MVAC Installation for CLP Power Cable Tunnel Projects | CLP Power Hong Kong Limited | Jan 2005 -Apr 2005 |
Olympian City I Repositioning | Sino Group | Nov 2004 -Dec 2004 |
Ting Ping Children & Youth Integrated Services Centre | Children & Youth Integrated Services Centre | Jun 2004 -Aug 2004 |
Belvedere Garden Children & Youth Integrated Services Centre | Children & Youth Integrated Services Centre | Feb 2004 -Feb 2005 |
Haven of Hop Neigborhood Elderly Centre at Kin Ming Estate | Haven of Hope Christian Service | Feb 2004 -Jul 2004 |
Community Specialist Clinic Kin Ming Estate | Haven of Hope Christian Service | Feb 2004-Mar 2004 |
The Three Bays at RBL 412, 7 Stanley Beach Road Show Flat | Sino Group | Nov 2003 -Dec 2003 |
A&A Works To Laboratories And Offices At FG 3/F, LGSI | The Hong Kong Polytechnic University | Nov 2003 -Dec 2003 |
Wanchai Baptish Church At No.42 Wood Road, Wanchai, Hong Kong | Baptish Church | Sep 2003 -Aug 2004 |
HIDC, Warehouse G/F-6/F Rampway and Driveway | Hutchison Whampoa Property Limited | Sep 2003 -Dec 2003 |
Covered Walkway Street & External Works | Hong Kong Baptist University | Sep 2003 -Nov 2003 |
Electrical Installation at Aberdeen Site 1,4 and 5 Renovation | Hutchison Whampoa Property Limited | Aug 2003-Dec 2003 |
King Fai Building Lobby Renovation | Owner Committee | Jul 2003- Dec 2003 |
Ritz Plaza Main Lobby Renovation Works | Sino Group | Jun 2003- Dec 2003 |
Shium Ay Alliance Church | Shium Ay Alliance Church | Jun 2003- Dec 2003 |
Whampoa Garden – Stie 4 External Facade Renovation Electrical Installation | Hutchison Whampoa Property Limited | Apr 2003-Sep 2003 |
Electrical Rectification Works at Centre of Chinese YMCA of Hong Kong | YMCA | Feb 2003 -Dec 2003 |
Shatin City One Cambridge Nursing Home | Cambridge Nursing Home | Feb 2003 -Jul 2003 |
Residential Care For Elderly (Rche) Cum Day Care Unit (DCU) at Podium & Level 2, Fu Yun House, Fu Cheong Estate | Po Leung Kuk | Feb 2003 -Jun 2003 |
Yau Chai Hospital Mrs. Kwok Yuk Cheung and Chinachem Care and Attention Homes Public Sewer Connection | Kwok Yuk Cheung and Chinachem Care and Attention Homes | Jan 2003-Dec 2003 |
Aberdeen Centre Shopping Mall Renovation Works | Whampoa Property Management Limited | Aug 2002-Dec 2002 |
Lot 2052 Show Flat And Sale Office at TMTL 209, Tuen Mun Town Plaza | Sino Group | Jul 2002- Nov 2002 |
Electrical System for Classroom Installation | Kwun Tong Government Secondary School | Jun 2002-Dec 2002 |
Hall A/C Installation (8 sets) | Kowloon Tang School (Secondary Section) | Jun 2002- Dec 2002 |
Shatin ASD Toilet Electrical and MVAC Installation | Architectural Services Department | Jun 2002-Jul 2002 |
Hall Split Type A/C Installation (10 sets) | Fong Shu Chuen Primary School | May 2002-Nov 2002 |
TKOTL 24 Show Flat And Sale Office At Olympian City II | Sino Group | Apr 2002 -May 2002 |
Tuen Mun Butterfly Estate Library Renovation | Architectural Services Department | Mar 2002 -Dec 2002 |
Installation of Electrical System, Window Type A/C Unit and Exhaust Air Fan (32 sets) | CNEC Lui Ming Choi Primary School | Jan 2002-Dec 2002 |
Installation of Electrical System and Window Type A/C Unit (51 sets) | Fong Shu Chuen Primary School | Dec 2001-Aug 2002 |
E&M Services for Aldrich Bay’s Pedestrian Subway Extension A | Electrical and Mechanical Services Department | Nov 2001 -Aug 2002 |
Fitting out of City U Library Replanning | City University of Hong Kong | Aug 2001-Apr 2002 |
Office Electrical Fitting Out Works | Woman Clinic | Aug 2001-Dec 2001 |
E&M Package for Proposed Religious Institution Building On 53 Cumberland | Hop Fat Construction Co., Ltd | Aug 2001-Oct 2001 |
Fitting out General Office and lobby of Department of Applied Social Studies | City University of Hong Kong | Jan 2001-Nov 2001 |
A&A Works for Production & Warehouse Bulding | Co Win (Asia) Limited | Jan 2001-Oct 2001 |
Fitting out of Conference Room, Research Centre and Seminar Room of School of Law | City University of Hong Kong | Jun 2015-Jun 2016 |
Unpgrading BFA Facilities for Tuen Mun Law Courts Building | Shun Bo | Jan 2001-Apr 2001 |
Installation of window type a/c unit and associated electrical work upgrading for 250A main income to 400A | FMO Aberdeen Secondary Technical School | Aug 2015 -Jun 2016 |
Refurbishment of Fu Kin Street Public Toilet, Tai Wai | Architectural Services Department | Jul 2000-Aug 2000 |
MVAC Installation
Our Air-Conditioning Department specializes in design, supply, installation, testing, commissioning and project management for MVAC systems that include office buildings, commercial complexes, institutions, hotels, hospitals, industrial buildings, residential buildings and computer/data centers, etc.
Services
1. Design and installation of MVAC in Hong Kong
2. Repair and maintenance services of MVAC in Hong Kong
Accreditation Buildings Department *Register of Specialist Contractors (Ventilation Works) Works Branch, Development Bureau *Air-conditioning Installation (Group I)
Job Reference
Project | Owner | Contract period |
Main contract for asset enhancement works at Sheung Tak Plaza (Phase 1) | Link Asset Management Ltd. | Oct 2017-On Progress |
HKU Haking Wong Building – Installation Standalone Window AC units | The University of Hong Kong | Oct 2017-On Progress |
Lift Addition for Three Schools- Carmel Bunnan Tong Memorial Secondary School, Cotton Spinners Assoiation Secondary School and CCC Kei Wai Primary School for HKSAE (RF FM002) | Education Bureau (HKSAR) | Oct 2017- On Progress |
Carmel Alison Lam Foundation Secondary School | Education Bureau (HKSAR) | Sep 2017 -On Progress |
Olympian city 2 G/F market and food corridor | Sino Estates Management Limited | Aug 2017 -Dec 2017 |
Hong Kong Polyu M102 M103 | Hong Kong Polytechnic University | Aug 2017 -Nov 2017 |
MVAC Installation 4/F Supplies Building Lamma Power Station | Hong Kong Electric Co | Aug 2017 -Dec 2017 |
Tung Hei Road Toilet | Architectural Services Department | Aug 2017 -On Progress |
New Entrance on GF of Metro City Plaza III, T.K.O.T.L. 34 Tseung Kwan O, New Territories – MVAC Installation | Henderson Land Development Company Limited | Jul 2017-On Progress |
The Proposed Residential and Commercial Development at YLTL527 Yuen Long, N.T – MVAC installation | Henderson Land Development Company Limited | Jul 2017-On Progress |
HKBU AML511 Level 5 Au Shue Hung Memorial Library | Hong Kong Baptist University | Jul 2017-Aug 2017 |
Island School – Shatin (campus B) | English School Foundation | Jul 2017-On Progress |
Discovery Bay Area 2A- MVAC Services Installation Nominated | Hong Kong Resort Co., Ltd. | Jun 2017- On Progress |
ESF – South Island School | English School Foundation | Jun 2017 -Aug 2017 |
CUHK 3/F Far East Consortuium Building Jordan | Chinese University of Hong Kong | May 2017-Jul 2017 |
Shatin Centre L3 shopping centre Phase 3 and 4 (MVAC) | Henderson Land Development Company Limited | May 2017-Dec 2017 |
Guestroom and corridor renovation 1/F to 3/F and 5/F Gold Coast Hotel | Sino Estates Management Limited | Apr 2017 -Jun 2017 |
UG/F shop re-layout at Olympian City 2 | Sino Estates Management Limited | Apr 2017 -Jul 2017 |
Tuen Mun Town Plazas 1 Upgrade Toilet | Sino Estates Management Limited | Apr 2017 -On Progress |
MVAC installation for Manhattan Plaza 23 Sai Ching Street Yuen Long | Henderson Land Development Company Limited | Feb 2017-On Progress |
E&M Installation for CSBS Mrs. Aw boon Haw Secondary School | Education Bureau (HKSAR) | Feb 2017 -On Progress |
Electrical, MVAC & Fire Services Installation for Proposed Extension (Phase 3) & Alterations & Additions for Hong Chi Association Advanced Training Centre at Pinehill Village, Cheung Nga Road, Nam Hang, Tai Po, N.T. | Hong Chi Association | Feb 2017 -On Progress |
MVAC Installation for Lamma Power Station ExtensionNo.4 Demineralization Plant | Hong Kong Electric Co. Ltd. | Jan 2017 -Dec 2017 |
E&M Installation for A&A Works at Tuen Mun Town Plaza 1, 1 Tuen Shun Street, Tuen Mun, N.T. | Sino Estates Management Limited | Dec 2016 -On Progress |
80 Gloucester Road – 10/F MVAC Installation | Luen Fung Contractors Ltd. | Dec 2016 -On Progress |
MVAC Installation Works of Proposed Fitting-out Works for Manhattan Plaza, 23 Sai Ching Street, Yuen Long | Henderson Land Development Company Limited | Dec 2016-On Progress |
E&M Installation for Cognita A&A Works at 25 Man Fuk Road , Ho Man Tin | Stamford American School | Dec 2016 -On Progress |
Electrical, MVAC and FS Installation for Renovation works for Hong Kong Playground Association Tung Chung Camp at 38 Ngau Au Village, Tung Chung, Hong Kong | Hong Kong Playground Association | Dec 2016 -Apr 2017 |
E & M Installation for A&A Works for HKBU-Renovation Works at 9/F of Sir Run Run Shaw Building | Hong Kong Baptist University | Dec 2016-Mar 2017 |
E&M Installation for Refurbishment and Strengthening of Mammal Cage at Hong Kong Zoological and Botanical Gardens (P1000819 ) | Architectural Services Department | Dec 2016 -Apr 2017 |
Renovation Works to Discovery Bay Office Centre (HKP/PD/DBOC/0387/2016) – Tender Query No.1 | Hong Kong Resort Company Limited | Dec 2016 -Dec 2017 |
Electrical, MVAC and Fire Services Installation for Alteration and Addition Works at U003 and U003A for the Hong Kong Polytechnic University | The Hong Kong Polytechnic University | Dec 2016 -Mar 2017 |
E&M Installation for Renovation Works for 3/F & 5/F, Holy Trinity Bradbury Centre, 139 Ma Tau Chung Road, Kowloon, HK | Golden Build | Dec 2016 -Apr 2017 |
Supply and Replacement of Cassette type Air Conditioner for Heng Fa Chuen | MTR Corporation Limited | Nov 2016 -Feb 2017 |
3-Month Term contract for Maintenance Heating, Ventilation and Air-Conditioning Installations for Tseung Kwan O Hospital | Electrical and Mechanical Services Department | Nov 2016 -Jan 2017 |
5-Month Contract for Operation and Maintenance of Electrical, Mechanical and Air-conditioning Systems at Yung Fung Shee Memorial Centre and Pamela Youde Polyclinic | Electrical and Mechanical Services Department | Oct 2016 -Mar 2017 |
E&M Installation for Yau Tsim Mong Multicultural Activity Centre | Architectural Services Department | Oct 2016- On Progress |
Electrical & MVAC Installation for Refurbishment to Shelter and Toilet in Tsuen Wan Tin Hau Temple Garden | Architectural Services Department | Sep 2016-Oct 2017 |
22-month Term Contract for Inspection, Testing and Maintenance of Fire Services Installations/Equipment and Related Building Services Installation for Jockey Club Innovation Tower (JCIT) & Phase 8 of PolyU for Year 2016-18 | The Hong Kong Polytechnic University | Sep 2016 -On Progress |
MVAC Installation for Renovation of G/F & 5/F Supplies Building, Lamma Power Station | Henderson Land Development Company Limited | Aug 2016 -Dec 2016 |
North Point Station Building – Refurbishment of MVAC System (Stage 4) (c/n 16/2712) (PD/835/14/110) | Hong Kong Electric Co. Ltd. | Aug 2016-On Progress |
E&M Installation for Refurbishment to Refurbishment to Fu Tei Sheung Tsuen Aqua Privy, Tuen Mun | Architectural Services Department | Aug 2016 -On Progress |
E&M Installation for Refurbishment of Changing Rooms at Sham Shui Po Sports Ground | Architectural Services Department | Jul 2016-Nov 2016 |
Electrical & MVAC Installation for Fitting Out Works at 6/F Ho Sin Hang Engineering Building | City University of Hong Kong | Jul 2016-Sep 2016 |
Electrical, MVAC, Fire Service and P&D Installation for The Bridges Street Market as Hong Kong New-Expo at 2 Bridge Street | Hong Kong New-Expo | Jul 2016-On Progress |
E&M Installation for Alteration and Addition Works for 3/F North Wing at West Kowloon Campus and 4/F Canteen at Hung Hum Bay Campus | The Hong Kong Polytechnic University | Jul 2016-Dec 2016 |
Replacement of Air Conditioning System at Hong Kong Observatory Headquarters | Electrical and Mechanical Services Department | Jul 2016-On Progress |
E&M Installation for Renovation Works on 4F of Au Shue Hung Memorial Library and 6F of Cha Chi-Ming Science Tower, HKBU | Hong Kong Baptist University | Jun 2016-Sep 2016 |
E&M Installation for Harbourview Guestroom Renovation Works to 20F and 21F | The Hong Kong Harbourview | Jun 2016-Aug 2016 |
Replacement of six sets of the existing 3-way control valve for the condensing pipe system by 2-way isolating gate valve complete with associated pipe work at Jockey ClubInnovation Tower 15/F | The Hong Kong Polytechnic University | May 2016-Aug 2016 |
The Chinese University of Hong Kong 702 Wong Foo Yuan Building | The Chinese University of Hong Kong | May 2016-Jun 2016 |
Modification of MVAC System for GCD/GC & GCD/CS Stores on 4F of Electrical centre (PD/670/14/015) | Hong Kong Electric Co. Ltd. | May 2016-Dec 2016 |
MVAC installation for 19/F Gloucester Road | Grand Rich | Apr 2016 -May 2016 |
Pak Fuk Tin Sum Playground, Fanling | Architectural Services Department | Apr 2016 -Jul 2016 |
80 Gloucester Road – 18/F MVAC installation | Grand Rich | Apr 2016-May 2016 |
Proposed Residential Development at Discovery Bay North Phase 16 MVAC Installation Sub-Contract | Hong Kong Resort Co., Ltd. | Mar 2016 -On Progress |
Commercial Center Extension at Discovery Bay, Lantau Island Nominated Sub-Contract for MVAC Installation | Hong Kong Resort Co., Ltd. | Mar 2016 -On Progress |
Replacement of cooling coil of air handling unit at Tai Po Hui Market and Cooked Food Centre in the New Territories | Electrical and Mechanical Services Department | Mar 2016 -Jul 2016 |
E & M Installation for Heep Hong Society Catherine Lo Centre | Heep Hong Society | Mar 2016-On Progress |
Mei Foo Neighborhood Activity Centre | Home Affairs Department | Mar 2016 -On Progress |
Provision of Daily Operation, Repairs and Maintenance Services to Mechanical Installation | The Hong Kong Polytechnic University | Mar 2016 -On Progress |
80 Gloucester Road – 17/F MVAC installation | Grand Rich | Feb 2016 -Feb 2016 |
Supply and Installation of Chilled Water Isolation Valve and Pipeworks for Hong Kong Museum of Art, Watt-hour Meter | Electrical and Mechanical Services Department | Feb 2016 -Feb 2017 |
Tsun Yip Cooked Food Market | Architectural Services Department | Feb 2016 -Aug 2016 |
E &M Installation for Toilets on 2/F of Cityview | YWCA | Feb 2016 -Apr 2016 |
保良局何壽南小學安裝冷氣系統工程 | Po Leung Kuk | Feb 2016 -Apr 2016 |
Electrical & MVAC Installation at Tuen Mun Storage Centre | Architectural Services Department | Feb 2016 -On Progress |
Proposed Residential Development at Discovery Bay North Phase 16 | Hong Kong Resort Company Limited | Jan 2016 -On Progress |
Maintenance of Air Conditioning System for Caibbean Square | Citybase Property Management Limited | Jan 2016 -On Progress |
Provusion of Maintenance Services for Electrical, Mechanical and Air-conditioning Inatallations and Hospital Equipment at Siu Lam Hospital | Electrical and Mechanical Services Department | Jan 2016 -Jan 2017 |
Supply and Replacement of Split Type Air-Conditioning Units at Central Park and Park Avenue (Q045047) | MTR Corporation Limited | Jan 2016 -On Progress |
Preventive Repair and Maintenance of MVAC System at The Cube, Wing Fat Building | Jones Lang LaSall Management Services Ltd | Jan 2016 -Dec 2017 |
Provision of Maintenance Services for Fire Dampers and Miscellaneous Equipment at Pok Oi Hopsital | Electrical and Mechanical Services Department | Jan 2016 -Dec 2016 |
雨川小學3至6樓輔導教學室冷氣更換工程 | Po Leung Kuk | Nov 2015 -Dec 2015 |
R/F Cooling Tower Relocation & Replacement | Hip Cellar Limited | Nov 2015-On Progress |
Replacement of pump, VRVs, split type units, pipework and ductwork of Leisure and Cultural Serivces Depatment in the New Territories | Electrical and Mechanical Services Department | Nov 2015 -Sep 2016 |
1881 Heritage – 更新1號風冷式冷氣機之散熱器盤管工程 | Citybase Property Management Limited | Nov 2015 -Dec 2015 |
Ministry Building – 更換天台冷氣機房隔音板之工程 | Citybase Property Management Limited | Nov 2015-Mar 2016 |
Air Conditioning Plant Services Contract | Citybase Property Management Limited | Nov 2015-Oct 2017 |
Conversion of Orientation Theatre to Jin Yong Gallery at Hong Kong Heritage Museum | Leisure and Cultural Serivces Department | Nov 2015 -Sep 2016 |
Electrical and MVAC Installation at Tuen Mun Public Toilet | Architectural Services Department | Oct 2015 -On Progress |
Renovation of Existing E&M Installation and Builder Works for DBOC at Discovery Bay | Hong Kong Resort Company Limited | Oct 2015 -Sep 2016 |
Alteation Works for New Footbridge Connection at Popcorn 2 and Bauhinia Garden | MTR Corporation Limited | Oct 2015 -On Progress |
鹿茵山莊會所及服務中心空調系統維修保養合約 | Goodwell Property Management Limited | Oct 2015 -Sep 2017 |
Maintenance Services of VRV System Contract at Banyan Mall | Citybase Property Management Limited | Sep 2015 -Sep 2017 |
Replacement of VRVs, Split Type Units, PAU & Ahu at Swimming Pool of Leisure and Cultural Serivces Depatment in the New Territories | Electrical and Mechanical Services Department | Sep 2015 -Sep 2016 |
Nursery Garden Next to Fu Tei Fire Station | Leisure and Cultural Serivces Department | Sep 2015 -May 2016 |
Provison of Operation and Maintenance in Water Pumps for A/C & Other Installations in Hong Kong International Airport | Electrical and Mechanical Services Department | Sep 2015-May 2016 |
Improvement Works on the Air-conditioning System at Hong Kong Heritage Museum, Sha Tin | Electrical and Mechanical Services Department | Sep 2015 -Mar 2016 |
Repair for Chiller and AHU at Caribbean Square | Citybase Property Management Limited | Sep 2015 -Nov 2015 |
Proposed A&A Works at 3rd Floor Tropicana Garden | Tropicana Garden | Aug 2015 -Nov 2015 |
Provide Two Year Maintenance Service of Air-conditioning & Hot Water Supply System | Whampoa Property Management Limited | Aug 2015 -Jul 2017 |
Replacement of Cooling Towers at East Wing of Hong Kong Police Headquarters | Electrical and Mechanical Services Department | Aug 2015 -Mar 2016 |
E&M Installation for Kwun Tong Government Primary School | Kwun Tong Government Primary School | Aug 2015-Nov 2015 |
Building Services Repairs & Maintenance Term Contract 2015-2018 | The Hong Kong Polytechnic University | Jul 2015-On Progress |
E&M Works for Sixty Eight at Granville | Sixty Eight | Jul 2015-Jan 2015 |
12-Month Contract for Operation and Maintenance of Electrical, Mechanical and Air-conditioning Systems at Yung Fung Shee Memorial Centre and Pamela Youde Polyclinic | Electrical and Mechanical Services Department | Jul 2015-Jul 2016 |
Refurbishment of Disable Toilet at City U | City University of Hong Kong | Jul 2015-Sep 2015 |
Supply and Replacement of Energy-Saving Split Type AC Units at Park Avenue and Central Park | MTR Corporation Limited | Jul 2015-Nov 2015 |
24 Months of Air Conditioning System Maintenance Services Contract for Residential & Clubhouse | Citybase Property Management Limited | Jul 2015-Jun 2017 |
中華大廈冷氣及通風系統保養服務合約 | Synergis Management Services Limited | Jul 2015-Apr 2017 |
Replacement of The Chiller Plant no. 1 Including All Piping and Wiring Works is Approved by The ARA Asset Managment (Fortime) Limited as 2014 CAPEX Works | Hutchison Whampoa Property Limited | Jun 2015 -Jul 2015 |
Refurbishment of Public Toilet at Kowloon City Complex | Architectural Services Department | Jun 2015 -Nov 2015 |
Home Shanghai at Yoho Midtown | Home Shanghai | Jun 2015 -Oct 2015 |
Chemical Cleaning for the Air-Conditioning Units in Shatin Senior Staff Quarter | The Hong Kong Jockey Club | Jun 2015 -On Progress |
6 Month Term Contract for the Maintenance of Electrical, Mechanical, Air-conditioning and Laundary Equipment at Butterfly Beach Laundry | Electrical and Mechanical Services Department | Jun 2015 -Dec 2015 |
E&M Installation for Choi Hung Bus Terminus Public Toilet | Architectural Services Department | Jun 2015 -Jan 2016 |
Renovation of the Existing Library of The Hong Kong Academy for Performing Arts | The Hong Kong Academy for Performing Arts | Jun 2015 -Dec 2015 |
E&M Installation for Office at Laws Commerical Plaza | Laws Commerical Plaza | May 2015-Jun 2015 |
Overhauling Works for Chiller No.2 at The Meropolis Tower | ARA Asset Management (Prosperity) Limited | May 2015-Nov 2015 |
Design and Build of Office at To Yuen Building and Cheng Yick-Chi Building | City University of Hong Kong | May 2015-Nov 2015 |
MVAC Installation for Renovation at Lamma Supplies Building 1/F-3/F | The Hongkong Electric Co., Ltd. | May 2015-Jun 2016 |
Provision of A/C and Mechanical Mainteanance Services at Tin Shui Wai Community Health Centre | Electrical and Mechanical Services Department | May 2015-Apr 2016 |
HVAC Nominated Sub-Contract Proposed Residential Development at Nos 1 to 11 Tang Fung Street Aberdeen | Top Sail International Limited | Apr 2015 -Feb 2017 |
Supply and Installation of a Compressor for Air-conditioning Package Unit 2 at Chuk Yuen Sports Centre | Electrical and Mechanical Services Department | Mar 2015 -Apr 2015 |
Refurbishment of Potable Water Supply System of Tai Lung AFCD Farm | Tai Lung AFCD Farm | Mar 2015 -Jul 2015 |
海逸豪園 – 第 16、 20 及 21 座 L1 層入口大堂及第 23 及 23A 座 L1 層升降機大堂更換分體式冷氣機工程 | Goodwell Property Management Limited | Mar 2015 -Sep 2015 |
5-Month Contract for Operation & Maintenance of Electrical, Mechanical and Air-conditioning Systems at Yung Fung Shee Memorial Centre & Pamela Youde Polyclinic | Electrical and Mechanical Services Department | Feb 2015 -Jul 2015 |
Provision of Maintenance Services for Electrical, Mechanical and Air-conditioning Installations and Hospital Equipment a Siu Lam Hospital | Electrical and Mechanical Services Department | Jan 2015 -Dec 2015 |
Wash & Clean AC System of Various Kitchens, Grandstand 1 & 2, Shatin Racecourse | The Hong Kong Jockey Club | Jan 2015 -Mar 2015 |
Provsion of Maintenance Services for Fire Dampers and Miscellaneous Equipment at Pok Oi Hospital | Electrical and Mechanical Services Department | Jan 2015 -Dec 2016 |
Annual Contract for Comprehensive Operation and Maintenance Contract of Air-conditioning Installations at Ko Shan Theatre New Wing | Electrical and Mechanical Services Department | Jan 2015 -Dec 2015 |
Improvement of Mechanical Ventilation System at Fo Tan Cooked Food Markets | Electrical and Mechanical Services Department | Dec 2014 -Mar 2015 |
Rehabilitation of HKYWCA Kowloon | YWCA | Dec 2014 -Aug 2016 |
Enhancement of Power at North Regional Headquarter | Architectural Services Department | Dec 2014 -Dec 2015 |
MVAC Installation at No 6 Tsun Wen Road Tuen Mun | Luk’s Industrial Company Limited. | Dec 2014-Nov 2017 |
Improvement Works on the Air-conditioning System for Municipal Venues in Hong Hom, Sham Shui Po, Wong Tai Sin and Yau Tsim Mong | Electrical and Mechanical Services Department | Nov 2014-Mar 2016 |
更換第二號冷凍機B2壓縮機及控制器一套 | Citytruth Property Management Limited | Nov 2014 -Feb 2015 |
Replacement of VRV Units with All Necessary Accessories at Lam Tin Ambulance Depot | Electrical and Mechanical Services Department | Nov 2014 -Dec 2015 |
4-Month Contract for Operation and Maintenance of Electrical, Mechanical and Air-conditioning Systems at Yung Fung Shee Memorial Centre and Pamela Youde Polyclinic | Electrical and Mechanical Services Department | Nov 2014-Feb 2015 |
Provision of operation and maintenance of electronic works for AC systems in Hong Kong international Airport | Electrical and Mechanical Services Department | Nov 2014 -Mar 2016 |
Provision of Maintenance Support Team for Terminal 1 in Hong Kong International Airport | Electrical and Mechanical Services Department | Nov 2014 -May 2016 |
MVAC Installation at No 8 Chung Fai Terrace, Tai Hang Road | The Signature | Nov 2014 -Nov 2014 |
Design and Replace the Existing MVAC System Monitoring Control Panel for Future Monitoring the new Chiller Plant Circuit and The FCUs in Line with Mall Renovation Work | Cayley Property Management Ltd. | Sep 2014 -Feb 2015 |
保良局顏寶鈴書院更換及加裝冷氣工程 | Po Leung Kuk | Sep 2014-Oct 2014 |
E&M Installation for Shop Sixty Eight at Mikiki Mall G26-G27 | Sixty Eight | Sep 2014-Nov 2014 |
5-Month Contract for Operation and Maintenance of Electrical, Mechanical and Air-conditioning Systems at Yung Fung Shee Memorial Centre and Pamela Youde Polyclinic | Electrical and Mechanical Services Department | Sep 2014 -Feb 2015 |
MVAC Installation for Joseph Lee Primary School at 9 Tin Fai Road Tin Shui Wai | Joseph Lee Primary School | Sep 2014 -Aug 2016 |
Provison of maintenace services for air conditioning electrical mechanical installations and water filteration system at Lam Tin Complex | Electrical and Mechanical Services Department | Aug 2014 -Feb 2015 |
Aberdeen Chinese Permanent Cemetery | The Board of Management of The Chinese Permanent Cemeteries | Aug 2014 -Jan 2016 |
E & M Installation at Café 187 TPTL Tai Po | Sino Group | Aug 2014 -Sep 2014 |
Operational Services for Sea Water Pump House at The Metropolis for The Period from 08 July 2014 to 07 July 2016 | Citybase Property Management Limited | Jul 2014-Jul 2016 |
Replacement of Deteriorated Air Handling Units and Associated Accessories for the Laboratories at Cha Chi-ming Science Tower, Ho Sin Hang Campus | Hong Kong Baptist University | Jul 2014-Oct 2015 |
E&M Installation at Café’ at TPTL 187 Tai Po (Providence Bay) |
Sino Group | Jun 2014-Feb 2014 |
MVAC Replacement for English Schools Foundation South Island School at 50 Nan Fung Road, Aberdeen | English School Foundation | Jun 2014-Nov 2014 |
South Island School, 50 Nam Fung Rd, Aberdeen, Hong Kong | English School Foundation | Jun 2014-Apr 2015 |
Replacement of VRV units cw All Necessary Accessories at Stanley Prison | Electrical and Mechanical Services Department | May 2014-Mar 2015 |
180-Refurbishment to Hong Keung Street Public Toilet, Wong Tai Sin, Kowloon | Architectural Services Department | May 2014-Aug 2015 |
Provision of Daily Operation, Repairs and Maintenance Services to Mechanical Installation | The Hong Kong Polytechnic University | May 2014-Mar 2016 |
Operation and Maintenance Works for On-airport and Off-airport Venues for Civil Aviation Department | Electrical and Mechanical Services Department | May 2014-Aug 2014 |
Improvement of Airducts at Basement of Hong Kong Cultural Centre | Electrical and Mechanical Services Department | May 2014-Jul 2014 |
E & M Installation at Tong Shui Road Toilet | Architectural Services Department | Apr 2014-Jan 2015 |
E & M Installation at Shop 126 to 127 Olympian City 2 | Sino Estates Management Limited | Apr 2014-Sep 2015 |
Maintenance of Air Conditioning Plant Services Contract (Period from 1 Apr 2014 to 30 Sep 2016) | Citybase Property Management Limited | Apr 2014-Sep 2016 |
Provide Labou and Materials to Carry Out Routine Maintenance Works for HVAC System (Air Side Equipment) for 2-years | Hutchison Logistics Centre | Apr 2014-Mar 2016 |
Provision of Maintenance Services for Fire Dampers and Mincellaneous Equipment at Pok Oi Hospital | Electrical and Mechanical Services Department | Apr 2014 -Mar 2015 |
E&M Work at 313 prince road | Paxton | Apr 2014 -Apr 2014 |
E&M Installation at Tuen Mun Law Courts Building | Architectural Services Department | Mar 2014-Mar 2015 |
Supply and installation of Audiology Examination Syite for Alice Ho Miu Ling Nethersole Hospital | Hospital Authoity | Mar 2014-May 2015 |
P&D, Electical, MVAC & Chiller Plant Installation The Hong Kong Polytechnic University Alteration and Addition Works at W7/F |
The Hong Kong Polytechnic University | Mar 2014 -Jun 2015 |
Improvement of MVAC System at NMR Room at City University of Hong Kong | City University of Hong Kong | Feb 2014 -Jul 2014 |
Provision of Maintenance Services for Electrical Mechanical and Air-conditioning Installations and Hospital Equipment at Siu Lam Hospital | Electrical and Mechanical Services Department | Jan 2014 -Jan 2015 |
Maintenance of Air Conditioning System for Caribbean Square | Citybase Property Management Limited | Jan 2014 -Jan 2016 |
Electrical, Mechanical Ventilation & Frie Services of Enabling Works for Renovation at Tsing Yi Commercial Complex | The Link Management Limited | Jan 2014 -Jul 2014 |
Replacement of Thermal Insulation for Chilled Water Pipes at Pei Ho Street Municipal Services Building | Electrical and Mechanical Services Department | Jan 2014 -Apr 2014 |
Maintenance Services of Air Conditioning Plant & Mechanical Ventilation System at Monte Vista | Citybase Property Management Limited | Jan 2014 -Dec 2015 |
The Salvation Army Headquarters and Booth Lodge at No. 11, Wing Sing Lane, Yaumatei, Kln. | The Salvation Army | Dec 2013 -Aug 2014 |
E&M Installation at Shing Mun Valley Swimming Pool | Leisure and Cultural Serivces Department | Dec 2013 -Jan 2016 |
E&M Installation at Level 1 amd Room 201 Academic and Administration Building HKBU | Hong Kong Baptist University | Dec 2013 -Sep 2014 |
Replacement of Thermal Insulation for Chilled Water Pipes at Pei Ho Street Municipal Services Building | Electrical and Mechanical Services Department | Nov 2013 -Jun 2014 |
E&M Work at Mei Lam Estate | The Link Management Limited | Nov 2013-Nov 2014 |
Interior Fit-out Works for Café’ at Tai Po TPTL 187 | Sino Group | Nov 2013 -Dec 2013 |
Refurbishment of Sheung Yuen Street Public Toilet | Architectural Services Department | Oct 2013- Oct 2014 |
鹿茵山莊 -會所大修冷凍機1號及2號壓縮機工程 | Goodwell Property Management Limited | Oct 2013- Sep 2015 |
DeerHill Bay 4699 Tai Po Road, Cheung Shu Tan, Tai Po, N.T. |
Goodwell Property Management Limited | Oct 2013- Sep 2015 |
E&M Installation at Mei Tin Estate | Tung Wah Group of Hospitals | Oct 2013- May 2014 |
E&M Installation at G/F and 1/F Kingswood Ginza, Phase 2 Tin Shui Wai | Cheung Kong Property Development Ltd. | Oct 2013- May 2014 |
Seafront near Seawater Intake Chamber, Phase II, South Horizons | South Horizons Management Ltd | Oct 2013- Apr 2014 |
Yau Oi Estate Temporary Site Office | The Link Management Limited | Oct 2013-Nov 2013 |
Proposed for the Commercial Development at 1L-1M Sai Yeung Choi Street South, Mongkok | Times Investment Limited | Sep 2013-Mar 2014 |
40-Month Maintenance Services for Air-conditioning Units at Airfield in Hong Kong International Airport | Electrical and Mechanical Services Department | Sep 2013-On Progress |
Main Contract for the Renovation Works at Yau Oi Shopping Centre (Phase 3 – Yau Oi Shopping Centre) | The Link Management Limited | Sep 2013-Sep 2015 |
Supply and Installation of one Section of Seawater Cooling Mains at Hong Kong Cultural Centre | Electrical and Mechanical Services Department | Sep 2013-Feb 2015 |
HI172-HKJEBN-Improvement Works at 3/F., Tropicana Garden-MVAC installation | Hsin Chong Construction Group Limited | Sep 2013 -Aug 2014 |
Replacement of Water Scrubber System at Cheung Tung Road Refuse Collection Point Tung Chung | Electrical and Mechanical Services Department | Sep 2013 -Jun 2014 |
Subcontract Works for Replacement of Chiller Plants and Air Handling Units for Belvedere Square 3, Tsuen Wan (Contract No 54/13) | ARA Asset Management (Prosperity) Limited | Sep 2013 -Feb 2014 |
Replacement Works for Chillers for AIA Central (Connaught Road Central Hong Kong) | ISS EastPoint Property Management Ltd. | Aug 2013-Nov 2013 |
E&M Works for Caritas Lok Hang Workshop and Lok Chung Hostel | Caritas Hong Kong | Aug 2013-Dec 2014 |
IAQ Improvement Works for Un Chau Street Public Library | Electrical and Mechanical Services Department | Aug 2013-Dec 2013 |
Renovation of Ground Floor Lobby at St. John’s Building | St. John’s Building | Aug 2013-Nov 2013 |
Letter of Intent For “提供人手、工具及一切所需之物料更換分體式室外冷氣機內之壓縮機、微喉及雪種filter連有關配件,共十五部,現時分體式冷氣機資 | Goodwell Property Management Limited | Aug 2013 -Nov 2013 |
Nob Hill 8 King Lai Path, Kwai Chung, NT |
Citybase Property Management Limited | Jul 2013-Jun 2015 |
Home Care Centre for girls at 1/F Ching Kwai House Cheung Tsing Estate | Home Affairs Department | Jul 2013-Oct 2013 |
2-Year Maintenance Services for Chiller Plants | City University of Hong Kong | Jun 2013-May 2015 |
Renovation Works for Prining Room (OEM503 to OEM506) at Hong Kong Bapist University | Hong Kong Baptist University | Jun 2013-Nov 2013 |
Fitting-out Works to YMCA Shek Kip Mei | YMCA | Jun 2013-Oct 2013 |
E&M Installation Renovation Works for Chinese YMCA of Hong Kong Tin Ping Neighborhood Elderly Centre at Unit 116, 117 & 119, G/F., Tin Ming House, Tin Ping Estate, Sheung Shui, N.T. | YMCA | Jun 2013-Oct 2013 |
Renaissance College, No. 2 Hang Ming Street, Area 90B, Ma On Shan, Shatin, Lot No. 522 | English School Foundation | Jun 2013-Oct 2013 |
Shop Re layout at Level 3 at China Hong Kong City | Sino Group | Jun 2013-Sep 2013 |
Japanese & Vietnamese Restaurant – 4/F Lee Garden II | 1957 & Co. | Jun 2013-Aug 2013 |
Replacement of Fill Packs for The Cooling Towers of Air-conditioning Plant for Library Building and Phase 7 Building (1034378) | The Hong Kong Polytechnic University | May 2013-Sep 2013 |
Comprehensive Operation and Maintenance Works for On-airport and Off-airport Buildings | Electrical and Mechanical Services Department | Apr 2013-Jun 2014 |
Fitting out Work Installation for Residential Development at 15-16 Wang Fung Terrace , HK | Pacific King Development Ltd. | Apr 2013-Jan 2014 |
E&M Installation at Temporary Container works at Quarry Bay School | English School Foundation | Apr 2013-May 2013 |
Cleaning of Air-Conditioners 2013 For St. Paul’s College at No. 69 Bonham Road, Hong Kong | St. Paul’s College | Mar 2013-Aug 2013 |
Dah Sing Bank – 13 Branches | Dah Sing Bank | Mar 2013 -Aug 2013 |
HKEAA Tai Hing Estate Centre, Tai Hing Estate, Phase 1, Tuen Mun | Hong Kong Examinations and Assessment Authority | Mar 2013 -Apr 2013 |
24-month Term Contract for Maintenance Works at MacLehose Medical Rehabilitation Centre, Fung Yiu King Hospital and Duchess of Kent Children’s Hospital | Electrical and Mechanical Services Department | Feb 2013-Jan 2016 |
(1520EM12M) Improvement Works for the Greenhouse at Jordan Valley Park | Electrical and Mechanical Services Department | Feb 2013-Dec 2013 |
Provision for electrical maintenance works carried out in municipal venues of Hong Kong Region | Electrical and Mechanical Services Department | Jan 2013-Feb 2014 |
(1745EM12M) Replacement of Air Conditioning Equipment at Queen Elizabeth Stadium, Hong Kong Stadium and Hong Kong Film Archive | Electrical and Mechanical Services Department | Jan 2013-Nov 2013 |
Replacement of Compresses for Air-conditioning System International Funeral Parlour | Tung Wah Group of Hospitals | Jan 2013-Apr 2013 |
E & M Installation at Hip Cellar Roof Cooling Tower Installation | Hip Cellar Limited | Jan 2013-Apr 2013 |
E & M Installation at Hip Cellar 5/F | Hip Cellar Limited | Jan 2013-Apr 2013 |
A&A Works of Commercial Building on I.L.s 7311-7314 at Gluocester Road and O’brien Road, Hong Kong | Sun Properties Company Limited | Dec 2012-Jan 2016 |
Chiller Plant B, West Commercial Block, South Horizons | South Horizons Management Ltd | Dec 2012 -May 2014 |
Electrical and ACMV Installation for Quarry Bay Market | Architectural Services Department | Dec 2012-Oct 2013 |
Builder / M&M system installation work for 3/F PABX equipment room | Island Pacific Hotel | Dec 2012 -Oct 2013 |
Phase I to IV Residential Towers, Clubhouse and Sports Complex, South Horizons | South Horizons Management Ltd | Dec 2012 -May 2013 |
Electrical and MVAC Installation at SV1 and SV2 Electronic Area at East Hall HKIA | Nuance Watson | Dec 2012 -Jan 2013 |
Improvement Works to Play Area TWGHs Wong Chu Wai Fun Kindergarten | Tung Wah Group of Hospitals | Dec 2012 -Jan 2013 |
Provision of Inspection and Maintenance Service for Ventilation Systems of United Christian Hospital, Kowloon East Cluster, Hospital Authority | United Christian Hospital | Nov 2012-Nov 2015 |
Operation and Maintenance of Heating, Ventilation and Air-Conditioning Installations at Tuen Mun Town Hall, Tsuen Wan Town Hall and Hong Kong Heritage Museum | Electrical and Mechanical Services Department | Nov 2012 -Aug 2013 |
MVAC Installation For St. Paul’s College Primary School at 777 Victoria Road, Hong Kong | St. Paul’s College | Nov 2012 -Jan 2013 |
HK/2009/02 CWPS – Ductwork installation | Water Supplies Department | Nov 2012-Nov 2012 |
Jockey Club New Hall at Tuen Mun T.M.T.L. No.376 for Lingnan University | Lingnan University | Oct 2012 -Dec 2013 |
Fan Coil unit for Staff Canteen | Hong Kong Gold Coast Hotel | Oct 2012 -Jan 2013 |
Mango Tree at Shop 2032-2033, The Elements | 1957 & Co. | Oct 2012 -Jan 2013 |
Replacement of Return Air Fan for Variable Air Volume Air Volume Air Handing Unit no. 1 and Associated Accessories in the Prince Philip Dental Hospital as per quotation no. 1213EM12M | Electrical and Mechanical Services Department | Sep 2012 -Apr 2013 |
Supply and Return chiller water pipe at Laguna Verde | Goodwell Property Management Limited | Aug 2012-Oct 2012 |
(1194EM12S) 18-month Term Contract for Maintenance of Electrical, Mechanical, and Air-conditioning Installations and Hospital Equipment at Siu Lam Hospital | Electrical and Mechanical Services Department | Jul 2012-Feb 2014 |
Fanling Rhenish Church Secondary School Library | Fanling Rhenish Church Secondary School | Jul 2012-Oct 2013 |
(1163EM12M) Improvement works on the Air-conditioning System at Ap Lei Chau Municipal Services Building, Ap Lei Chau, Hong Kong | Electrical and Mechanical Services Department | Jul 2012-May 2013 |
E&M Quotation Kwai Hing Public Toilet | Architectural Services Department | Jul 2012-Jan 2013 |
E&M Installation at Kowloon Shangri-LA Hotel Kowloon Room | Shangri-LA Hotel | Jul 2012-Sep 2012 |
Po Leung Kuk Shek Kip Mei Small Group Home | Po Leung Kuk | Jul 2012-Aug 2012 |
E&M Work Staff Resturant at Repulse Bay | The Hong Kong and Shanghai Hotels Limited | Jul 2012-Aug 2012 |
E&M Installation at Proposed Food Factory at TIK 12-13 Tiu Keng Leng Station | Sushi Take-Out | Jul 2012-Aug 2012 |
E&M Installation at Kowloon Shangri-LA Hotel | Shangri-LA Hotel | Jul 2012-Aug 2012 |
24-Month Contract for Operation and Maintenance of Electrical Mechanical and Air-conditioning Systems at Yung Fung Shee Memorial Centre and Pamela Youde Polylinic | Electrical and Mechanical Services Department | Jun 2012-May 2014 |
Repair & Maintenance 3 years Contract for Air Conditioning System for Discovery Park, No. 398 Castle Peak Road Tsuen Wan, N.T. | Wells Estate Services Ltd. | Jun 2012- Aug 2013 |
(1428EM12M) Replacement of Pipe Insulation for Air Conditioning System at Tsuen Wan Government Office | Electrical and Mechanical Services Department | Jun 2012- Jun 2013 |
Wai Hang Sports Centre to Connect to Ho Sin Hang Campus and Shaw Campus | Hong Kong Baptist University | Jun 2012- Mar 2013 |
E&M Installation at G/F Kingswood Ginza, Phase 2 Tin Shui Wai | Sino Group | Jun 2012 -Jan 2013 |
MVAC and PD Work Staff Restaurant Kitchen at Repulse Bay | Repulse Bay Hotel | Jun 2012 -Jul 2012 |
Term Contract-Building Services Repairs and Maintenance Term Contract 2012/2015 The Hong Kong Polytechnic University | The Hong Kong Polytechnic University | May 2012-May 2015 |
(1012EM12M) Replacement of HVAC Systems and Equipment at Television House | Electrical and Mechanical Services Department | May 2012-Dec 2013 |
Main Contract for the Renovation Works at Yiu On Shopping Centre Shatin | The Link Management Limited | May 2012-May 2013 |
Electrical and MVAC Installation at Nam Shan Estate Carpark | City University of Hong Kong | May 2012-Sep 2012 |
Maintenance works for HVAC system for 2 years at Terminal 4, Kwai Chung(1/4/2012 to 31/3/2014) | Hutchison Whampoa Property Limited | Apr 2012 -Mar 2014 |
Electrical and MVAC Installation at AC2, City University of Hong Kong | City University of Hong Kong | Apr 2012-May 2012 |
Sub-Contract No. S-11/8012D Mechanical Ventilation and Air-Conditioning Installation for Superstructure Works For LMX Maintenance Building and Associated Works | Hong Kong Electric Co. Ltd. | Mar 2012 -Dec 2013 |
Replacement of Fan Coil Units and Associated Accessories for Red Cross Blood Transfustion Service Centre | Electrical and Mechanical Services Department | Mar 2012-Nov 2012 |
E&M Installation at Royal Pacific Hotel | Royal Pacific Hotel | Mar 2012 -Jun 2012 |
Replacement of Bleed Off System, Condensation Pipes and Associated Accessories for Sea Water Cooling System at Block K, Queen Mary Hospital | Electrical and Mechanical Services Department | Feb 2012 -Apr 2013 |
Relocate the 60 HP Stable split type a/c outdoor unit TR-3, HQ B/F Carpark Zone C, Happy Valley (RFQ4146) | The Hong Kong Jockey Club | Feb 2012 -Jun 2012 |
Maintenance Service for Air-conditioning Plant & Mechanical Ventilation System(Monte Vista) | Citybase Property Management Limited | Jan 2012 -Jun 2014 |
Siu Lam Hospital Term Contract for Maintenance of Electrical, Mechanical and Air-conditioning Installations and Hospital Equipment at Siu Lam Hospital | Electrical and Mechanical Services Department | Jan 2012 -Jul 2012 |
E&M Renovation of Wanchai Market | Social Walfare Dapertment | Dec 2011 -Jul 2013 |
Operation and Maintenance of Electrical, Mechanical and Other Installations for Specified Municipal Venues in Kowloon | Electrical and Mechanical Services Department | Dec 2011-May 2013 |
Lamma Power Station Extension Supply And Installation of Mechanical Ventilation and Air Conditioning System | The Hongkong Electric Co., Ltd. | Oct 2011- Mar 2012 |
Building & Refurbishment Works for OCC Migratiion | MTR Corporation Limited | Sep 2011-Aug 2013 |
HKUST upgrade lab of Rm7108,1709,7110 & 7118 | Hong Kong University of Science and Technology | Aug 2011-Dec 2011 |
Replacement of split A/C unit in AAB Store | Electrical and Mechanical Services Department | Aug 2011 -Sep 2011 |
Supply and installation of playground glass sliding doors | Tseung Kwan O Heung To Secondary School | Jul 2011-Dec 2012 |
Conversion of Service Counter on 1/F and Extension of Service Counter on 13/F at CIE Shek Mun Campus , No 8 On Muk Street , Shek Mun , Shatin | Hong Kong Baptist University | Jul 2011-Sep 2011 |
E&M Installation at Shatin Junior School | English School Foundation | Jun 2011- Aug 2012 |
Annual FMRII Works & Classroom Block Vertical Extension Works at Shatin College | English School Foundation | Jun 2011-Jun 2012 |
Addition and Alteration Works at Portion of G/F, 2/F & upper 2/F, 413 Castle Peak Road, Cheung Sha Wan | Hong Kong Housing Society | Jun 2011-Oct 2011 |
The Electrical Installation, Ventilation Installation and Builder’s Works for Central Meal Portioning at 7 Numbers Subvented School in NT Areas | Electrical and Mechanical Services Department | Jun 2011-Sep 2011 |
Replacement of Condenser Coils at Hong Kong Film Archive | Electrical and Mechanical Services Department | May 2011-Apr 2012 |
E & M Installation for Renovation Works (Internal & External ) for Existing Hoi Bun School , Lei Yue Mun , Kln | Innovative Design Group Ltd. | May 2011-Jul 2011 |
E&M Reinstatement Works at Fisherman’s Wharf | Cheung Kong (Holdings) Limited | Feb 2011 -Apr 2011 |
E&M Installation Works for Aon China Building 1/F Office | Hutchison Whampoa Property Limited | Feb 2011 -Mar 2011 |
12 Months Term Contract for Maintenance of Electrical, Mechanical and Air-conditioning Installations and Hospital Equipment at Siu Lam Hospital | Electrical and Mechanical Services Department | Jan 2011-Dec 2011 |
City Garden,233 Electric Road, North Point, Hong Kong | Cayley Property Management Ltd. | Dec 2010-Dec 2011 |
Provison of O &M Works for Cape Collinson Crematorium and Municipal Venues under Mun/H1 Region( Period: November 2010 – April 2011) | Electrical and Mechanical Services Department | Nov 2010 -Apr 2011 |
Dah Sing Bank-Mongkok Branch at B/F-G/F, No. 697 Nathan Road, Mongkok | Dah Sing Bank | Oct 2010-Mar 2011 |
Electrical, MVAC and PD Intstallation at TMTL Jusco Store on UG/F and 1/F | Tuen Mun Town Plaza | Sep 2010-May 2011 |
Major Renovation of Stanley Plaza, Stanley, Hong Kong (Phase 1b) | The Link Management Limited | Aug 2010 -Nov 2011 |
Caritas Bianchi Lodge at 4 Cliff Road, Yau Ma Tei, Kowloon | Caritas Hong Kong | Aug 2010 -Mar 2011 |
E & M and P & D Installation of Renovation Lavatories at Metropolis Mall | Metropolis Mall | Aug 2010 -Dec 2010 |
Fit-Out Work of Wellendorff Store at IFC Mall | Internation Finance Centre | Aug 2010-Oct 2010 |
HKAPA-Proposed extension of 1F over carpentry workshop at theatre block | Hong Kong Academ for Performing Arts | Aug 2010 -Sep 2010 |
Renovation work at Rm 905, Sir Run Run Shaw Bldg, HSH Campus | Hong Kong Baptist University | Aug 2010 -Sep 2010 |
Operational Services for Sea Water Pump House | Citybase Property Management Limited | Jul 2010-Jul 2012 |
E & M Installation Work at Leighton Centre G/F and 8/F | Hysan Development Company Limited | Jul 2010-Sep 2011 |
Tuen Mun Town Plaza 209 | Sino Group | Jul 2010-Dec 2010 |
H&M Shop | H&M | Jul 2010-Sep 2010 |
Maintenance Service for Air-conditioning System at Rhine Garden | Synergis Services Management Ltd. | Jun 2010- May 2012 |
Replacement of Thermal Insulation in Lok Ma Chau Control Point (LMCCP) and A/C split type units in Kwun Tong World Trade Square (WTS) ImmD Office | Electrical and Mechanical Services Department | Jun 2010- Mar 2011 |
Excelsior Hotel 1/F, 2/F & 3/F Washrooms | Excelsior Hotel | Jun 2010- Dec 2010 |
Fitting Out Works for Caritas Community Centre-Caine Road (A2R) G/F, 2/F, 4/F&5/F at Caritas House, 2 Caine Road, HK | Caritas Hong Kong | Jun 2010- Nov 2010 |
24-month contract for operation and maintenance of electrical, mechanical & air-conditioning systems at Yung Fung Shee Memorial Centre & Pamela Youde Polyclinic | Electrical and Mechanical Services Department | May 2010-May 2012 |
Main Entrance and Assembly Hall Renovation Works for St. Paul’s College at No. 69 Bonham Road, HK | St. Paul’s College | May 2010-Dec 2010 |
Provison of O &M Works for Cape Collinson Crematorium and Municipal Venues under Mun/H1 Region( Period: May 2010 – Oct 2010) | Electrical and Mechanical Services Department | May 2010-Oct 2010 |
HVAC System Office Tower & Stepped Office HLC | Hutchision Logistics Centre | Apr 2010 -Mar 2012 |
Wong Chan Sook Ying Memorial School at Yuen Long | Architectural Services Department | Apr 2010 -Jan 2011 |
MVAC System and Fire Dampers – TWGHs Wong Cho Tong Social Service Building | Tung Wah Group of Hospitals | Apr 2010-Oct 2010 |
Fitting-out Works for 12/F., Renal Dialysis Unit and General Words, The Hong Kong Sanatormium & Hospital | Hong Kong Sanatormium & Hospital | Feb 2010 -Oct 2010 |
E & M Installation at BOC Mongkok Building | Bank of China (Hong Kong) Ltd. | Feb 2010 -May 2010 |
E & M Installation at MTR Security Opertaion Centre at HTD and Canopy at HEO | MTR Corporation Limited | Dec 2009-May 2010 |
Provision of O&M Works for cape Collinson Crematorium and Municpical venues under mun/H1 region (Period: Nov 2009 – Nov 2010) | Electrical and Mechanical Services Department | Nov 2009 -Nov 2010 |
8/F, St. Paul’s Hospital, Causeway Bay | St. Paul’s Hospital | Nov 2009 -Jan 2010 |
Office to Kindergarten, Stubbs road (ESF Centre) 43B Stubbs Road |
English School Foundation | Nov 2009 -Jan 2010 |
Mei Foo Phase 7 shopping centre | The Incorporated Owners of Mei Foo Sun Chuen | Sep 2009-May 2010 |
Ministry Building 42 Kennedy Road Hong Kong |
Citybase Property Management Limited | Sep 2009 -Dec 2009 |
Satay Inn and Function Rooms of Hong Kong Gold Coast Hotel | Sino Group | Sep 2009-Nov 2009 |
Apex Horizon Hotel 33 Wo Yi Hop Road, Kwai Chung N.T. (Term Contract : Aug 2009 – Aug 2011) | Goodwell-Prosperity Property Services Ltd. | Aug 2009 -Aug 2011 |
Multi-purpose Hall for Kennedy School, English Schools Foundation | English School Foundation | Jul 2009-Sep 2009 |
South Island School, 50 Nam Fung Rd, Hong Kong | English School Foundation | Jun 2009-Aug 2009 |
Kwu Tung Show House | Sino Group | Jun 2009-Jul 2009 |
Overhaul and Renovation of 80-seater Classrooms (Phase II), City University of Hong Kong | City University of Hong Kong | May 2009-Oct 2009 |
Constuction of Mezzanine Floor on 2/F., Theatre Block of Academy at the Hong Kong Academy for Performing Arts, 1 Gloucseter Road, Wanchai, Hong Kong | ISS EastPoint Property Management Ltd. | May 2009-Sep 2009 |
Renovation Works at the Entrance of Computer Laboratory for Department of Computer Science fpr City U of H.K. | City University of Hong Kong | May 2009-Aug 2009 |
9/F of Blcok R and G/F Lobby of Block K, Queen Elizabeth Hospital for Chinese Medicine Clinic of Hong Kong Baptist University | Hong Kong Baptist University | May 2009-Jul 2009 |
18 Month Term for Building Services Fitting-out Works to Health Services Venus in N.T. East Region | Electrical and Mechanical Services Department | Apr 2009 -Sep 2010 |
E & M Installation at Hing Wah Estate | The Link Management Limited | Mar 2009-Mar 2012 |
CUHKFAA Chan Chun Ha Secondary School | CUHKFAA Chan Chun Ha Secondary School | Feb 2009 -Nov 2009 |
E&W Works of Temporary Site Office of Central Park Towers (Phase 2) at Shops 907-912, Level 9, Metropolis Mall | Cheung Kong Property Development Ltd. | Feb 2009-Mar 2009 |
Tung Wah Eastern Hospitals MVAC Maintenance Service |
Tung Wah Group of Hospitals | Dec 2008 -Dec 2010 |
City U Library Subject Village |
City University of Hong Kong | Dec 2008 -Apr 2009 |
Supply and Install “VAU-7” at LT 10/12 Plant Rm. 3M/F | City University of Hong Kong | Oct 2008 -Jan 2009 |
Shatin YWCA – Electrical and MVAC Installation | YWCA | Oct 2008 -Nov 2008 |
Lingnan University SO301 of the Dorothy Y L Wong | Lingnan University | Oct 2008 -Nov 2008 |
Library Public Services Facilities | City University of Hong Kong | Sep 2008 -Dec 2008 |
Electrical and MVAC Installation for Design and Build conversion of cooling, condensate and grey water to irrigation water | City University of Hong Kong | Sep 2008 -Dec 2008 |
16/F Whole Floor in Kennedy Town Centre | Joint Quality Review Committee Ltd. | Sep 2008-Oct 2008 |
City U Library Media Modification | City University of Hong Kong | Sep 2008 -Oct 2008 |
Proposed Construction of Management Office at Sui Wo Court, Shatin | Kai Shing Management Services Ltd. | Aug 2008 -Oct 2008 |
Teaching and Office Areas for ELC at City University of Hong Kong | City University of Hong Kong | Aug 2008 -Oct 2008 |
Alternation & Addition Work at Kingswood Ginza Plaza on T.S.W.T.L. No.4 | Cheung Kong Property Development Ltd. | Jul 2008 -Dec 2008 |
Renovation of School of Continuing and Professional Education (SCOPE)-Ka Chi School | City University of Hong Kong | Jul 2008 -Sep 2008 |
City U 7/F Design and Build for Upgrading of Sitting and Reception Areas for Faculty of Business | City University of Hong Kong | Jul 2008 -Sep 2008 |
E&M Installation at Block C, Level 2 of St. Paul’s Hospital | St. Paul’s Hospital | Jul 2008 -Sep 2008 |
Renovation of 2/F, 3/F & 4/F Offices & Stores at Shatin Club House | The Hong Kong Jockey Club | Jul 2008 -Aug 2008 |
YMCA 6/F Male & Female Changing Room Split Type A/C Work | YMCA | Jul 2008 -Jul 2008 |
Grand Century Place Motorized Valve Installation for A/C Zone Control | City University of Hong Kong | Jun 2008 -Aug 2008 |
Annual Maintenance for Swimming Pool Area at 4/F., Chinese YMCA of HK Kowloon Centre, 23 Waterloo Road, Kln | YMCA | Jun 2008 -Jul 2008 |
The Palace, Broadcast Drive | City University of Hong Kong | May 2008-Nov 2008 |
Renovation of G/F Lobbies at Blocks J to M of Kornhill | MTR Corporation Limited | May 2008-Jun 2008 |
Unit A, 20/F., Carnation Court, 43 Tai Hang Road, Hong Kong | Residential Flat | Apr 2008 -Jul 2008 |
Alteration Works to G/F Area Chinese YMCA of HK – YM Concept (Dio Boy School) | YMCA | Apr 2008 -Jun 2008 |
109 Repulse Bay Road, Repulse Bay Hotel | The Hong Kong and Shanghai Hotels Limited | Apr 2008 -Apr 2008 |
1/F male and female lavatories of British Council | British Council | Mar 2008-Oct 2008 |
Went Iandfill Office Renovation | Swire Sita Waste Serices Ltd. | Mar 2008 -Aug 2008 |
Renovation Works at Sin Hua Bank Building Electrical and Drainage Installation Works | Bank of China (Hong Kong) Ltd. | Feb 2008-Mar 2008 |
Lecture Theatres LT5, LT7, LT9, LT10, LT11 & LT12 | City University of Hong Kong | Jan 2008 -Jul 2008 |
Renovation Works at Chak On Estate Market, Shek Kip Mei | City University of Hong Kong | Jan 2008 -May 2008 |
Inno Centre, 72 Tak Cee Avenue, City University of HK | City University of Hong Kong | Jan 2008 -Apr 2008 |
Entrance of Computer Laboratory, 2/F Mon Man Wai Building and 6/F Academic Building, for Department of Computer Science, City University of HK | City University of Hong Kong | Dec 2007 -Jan 2008 |
No. 10 Lai Yin Lane, Tung Lo Wan Rd., Causeway Bay, Hong Kong | The Chinese Rhenish Church Hong Kong Synod | Oct 2007 -Jun 2008 |
Renovation of toilets and Baby Care Room at G/F., UG/F. and 1/F. of Shopping Arcade at Olympian City Phase II | Sino Group | Oct 2007- Nov 2007 |
Grand Century Place at Levels 18 and 19 | City University of Hong Kong | Oct 2007- Nov 2007 |
No. 5 Hang Ming Street, Ma On Shan, Renaissance College | English School Foundation | Oct 2007- Oct 2007 |
The Salvation Army Chuk Yuen Centre for Senior Citizens | Salvation Army | Sep 2007-Nov 2007 |
The Hong Kong Polytechnic University, Ventilation Improvement to Corridors at Student Halls of Residence | The Hong Kong Polytechnic University | Aug 2007-Nov 2007 |
Satay Inn at Shop 3, Tower1, China Hong Kong City, 33 Canton Road, Tsim Sha Tsui, Kowloon | Sino Group | Jul 2007-Sep 2007 |
Hong Kong Baptist University at Wu Chung 26/F | Hong Kong Baptist University | Jul 2007-Sep 2007 |
Fitting out of learning commons and spatial reorganization of Run Run Shaw Library, City University of Hong Kong | City University of Hong Kong | Jul 2007-Jul 2007 |
Design & Build of Renovation Works at Telford Annex City University of Hong Kong | City University of Hong Kong | Jun 2007-Aug 2007 |
(PO 529472) Design & Build : Air Conditioning System for Wind Tunnel Testing Facilities | City University of Hong Kong | Jun 2007-Jun 2007 |
Renovation of G/F Lobbies at Blocks N to R of Kornhill | MTR Corporation Limited | May 2007-Aug 2007 |
Shop MA, MF, Wing Tak Mansion, 15 Canal Road West, Causeway Bay, HK ($10 Shop) | AEON Store | May 2007-Jun 2007 |
Replacement Work of Aging Thermal Insulation at Traffic Interchange, LG/F | Sino Group | May 2007-Jun 2007 |
Overhaul and Renovation of Lecture Theatres LT13, LT15 & LT17 for City University of Hong Kong | City University of Hong Kong | Jan 2007 -Jun 2007 |
16/F MLC Millennia Plaza | Goodwell-Prosperity Property Services Ltd. | Jan 2007- Mar 2007 |
Re-modelling of Lecture Theatre 14 | City University of Hong Kong | Dec 2006 -Jan 2007 |
20/F & 21/F Office Renovation and 1/F, 2/F, 3/F&5/F Minor Works at One Harbourfront | Whampoa Property Management Limited | Dec 2006 -Dec 2006 |
City University – Wind Tunnel at Mong Man Wai Bldg. | City University of Hong Kong | Oct 2006 -Dec 2006 |
MTR Enhancement works contract no C7806-06C | MTR Corporation Limited | Oct 2006- Nov 2006 |
Electrical installation for Show House No. 27 & 93, Man Kei Toi, Pak Sha Wan, Sai Kung | Nam Fung Development Ltd. | Jun 2006- Nov 2006 |
Squash Court No. 3 in Laguna City Residential Clubhouse 1 | Citybase Property Management Limited | Jun 2006- Aug 2006 |
Mechanical Ventilation Improvement at Public Transport Interchange | Sino Group | May 2006-Aug 2006 |
Tai Po Tai Yuen Estate Grace Church | Remembrance of Grace Church | May 2006-Jul 2006 |
Warehouse Development at 14-18 Tsing Tim Street, Tsing Yi | Fly King Transportation Co. Ltd. | May 2006-Jun 2006 |
Design and Build Fitout works for YCY Health Centre | City University of Hong Kong | Mar 2006 -Aug 2006 |
Castar Primary School Hall A/C Installation | Po Leung Kuk | Feb 2006 -May 2006 |
Tsim Sha Tsui Centre | Sino Group | Dec 2005 -Feb 2006 |
Pacific Hong Kong Centre | Sino Group | Dec 2005 -Feb 2006 |
To Yuen Building | City University of Hong Kong | Nov 2005-Dec 2005 |
Purple Zone 2/F additional Classroom | City University of Hong Kong | Sep 2005 -Dec 2005 |
Whampoa Garden Site 12 Electrical & MVAC Installation for Basement One Retail Refit | Hutchison Whampoa Property Limited | Aug 2005 -Nov 2005 |
Beacon Hill Primary School 5/F & 6/F Renovation | English School Foundation | Jun 2005 -Aug 2005 |
CityU New Teaching Laboratory for CS at MMW (2/F) | City University of Hong Kong | Jun 2005 -Aug 2005 |
E-logistics laboratory for department of management sciences, City University | City University of Hong Kong | May 2005-Aug 2005 |
City University Teaching Lab Rooms (Bis Laboratories) | City University of Hong Kong | May 2005-Jun 2005 |
CityU New Teaching Laboratory for CTL at AC Bldg 7/F | City University of Hong Kong | May 2005-Jun 2005 |
A&A works at China Hong Kong City, 33 Canton Road, Kowloon | Sino Group | May 2005-Jun 2005 |
La Salle Place, 51-53 La Salle Road | La Salle Place | May 2005-May 2005 |
House 19, Fei Ngo Shan | Owner of the House | Apr 2005 -Nov 2005 |
EMSD Conference Room A/C Installation | Electrical and Mechanical Services Department | Apr 2005 -Apr 2005 |
IVE Term Contract 2005-2008 | IVE | Feb 2005 -Feb 2008 |
Ting Ping Children & Youth Integrated Services Centre | Children & Youth Integrated Services Centre | Feb 2004 -Feb 2005 |
Belvedere Garden Children & Youth Integrated Services Centre | Children & Youth Integrated Services Centre | Feb 2004 -Jul 2004 |
Haven of Hop Neigborhood Elderly Centre at Kin Ming Estate | Haven of Hope Christian Service | Feb 2004 -Mar 2004 |
Community Specialist Clinic Kin Ming Estate | Haven of Hope Christian Service | Nov 2003 -Dec 2003 |
A&A Works To Laboratories And Offices At FG 3/F, LGSI | The Hong Kong Polytechnic University | Sep 2003 -Aug 2004 |
Covered Walkway Street & External Works | Hong Kong Baptist University | Aug 2003 -Dec 2003 |
King Fai Building Lobby Renovation | Owner Committee | Jun 2003 -Dec 2003 |
Shatin City One Cambridge Nursing Home | Cambridge Nursing Home | Feb 2003 -Jun 2003 |
Residential Care For Elderly (Rche) Cum Day Care Unit (DCU) at Podium & Level 2, Fu Yun House, Fu Cheong Estate | Po Leung Kuk | Jan 2003 -Dec 2003 |
Tsui Ping Mutual Help and After School Child Care Centre | Social Walfare Dapertment | Jan 2003 -Jun 2003 |
Aberdeen Centre Shopping Mall Renovation Works | Whampoa Property Management Limited | Jul 2002- Nov 2002 |
Hall A/C Installation (8 sets) | Kowloon Tang School (Secondary Section) | Jun 2002 -Jul 2002 |
Shatin ASD Toilet Electrical and MVAC Installation | Architectural Services Department | May 2002-Nov 2002 |
Hall Split Type A/C Installation (10 sets) | Fong Shu Chuen Primary School | Apr 2002 -May 2002 |
Hang Hau Station | MTR Corporation Limited | Feb 2002 -Sep 2002 |
Installation of Electrical System, Window Type A/C Unit and Exhaust Air Fan (32 sets) | CNEC Lui Ming Choi Primary School | Dec 2001 -Aug 2002 |
Installation of Electrical System and Window Type A/C Unit (51 sets) | Fong Shu Chuen Primary School | Nov 2001 -Aug 2002 |
E&M Package for Proposed Religious Institution Building On 53 Cumberland | Hop Fat Construction Co., Ltd | Jan 2001- Nov 2001 |
Fitting out General Office and lobby of Department of Applied Social Studies | City University of Hong Kong | Jan 2001- Oct 2001 |
A&A Works for Production & Warehouse Bulding | Co Win (Asia) Limited | Jun 2015- Jun 2016 |
Fitting out of Conference Room, Research Centre and Seminar Room of School of Law | City University of Hong Kong | Jan 2001-Apr 2001 |
Installation of window type a/c unit and associated electrical work upgrading for 250A main income to 400A | FMO Aberdeen Secondary Technical School | Jul 2000-Aug 2000 |
Installation of window type a/c unit and acoustic fan chamber (52 sets) | Kung Yik She Secondary School | Apr 2000-Dec 2000 |
Fire Services Installation
Our Fire Services Engineering Department provides contracting services for a full spectrum of fire suppression and detection systems. Our technical competence and ability to meet stringent acceptance criteria and statutory approval to the client’s satisfaction have been demonstrated in a portfolio of large residential developments, prestige office buildings, special hazard industrial plants and various institutional buildings.
Accreditation Fire Services Department
Fire Service Installation Contractors (Class 1,2 &3)Job Reference
Job Reference
Project | Owner | Contract period |
Main contract for asset enhancement works at Sheung Tak Plaza (Phase 1) | Link Asset Management Ltd. | Oct 2017-On Progress |
Lift Addition for Three Schools- Carmel Bunnan Tong Memorial Secondary School, Cotton Spinners Assoiation Secondary School and CCC Kei Wai Primary School for HKSAE (RF FM002) | Education Bureau (HKSAR) | Oct 2017-On Progress |
HKIA Level 3 Plantroom Transportation centre | Hong Kong International Airport | Sep 2017-On Progress |
Carmel Alison Lam Foundation Secondary School | Education Bureau (HKSAR) | Sep 2017-On Progress |
Island School – Shatin (campus B) | English School Foundation | Jul 2017-On Progress |
Discovery Bay Area 2A – Plumbing & Drainage Works, Fire Services Works and Pool Filtration System Installation Nominated Sub-Contract (HK-4401,/PD/LTR224438) | Hong Kong Resort Co., Ltd. | Jun 2017-On Progress |
E&M Installation for CSBS Mrs. Aw boon Haw Secondary School | Education Bureau (HKSAR) | Feb 2017-On Progress |
Electrical, MVAC & Fire Services Installation for Proposed Extension (Phase 3) & Alterations & Additions for Hong Chi Association Advanced Training Centre at Pinehill Village, Cheung Nga Road, Nam Hang, Tai Po, N.T. | Hong Chi Association | Feb 2017-On Progress |
E&M Installation for Signature Project Scheme (Eastern Distric) -Eastern District Cultural Square (SSE508) | Architectural Services Department | Jan 2017-On Progress |
Fire Services Installation for Refurbishment to Atrium of Po On Road Municipal Services Building (RF E817) | Architectural Services Department | Oct 2016-On Progress |
22-month Term Contract for Inspection, Testing and Maintenance of Fire Services Installations/Equipment and Related Building Services Installation for Jockey Club Innovation Tower (JCIT) & Phase 8 of PolyU for Year 2016-18 | The Hong Kong Polytechnic University | Sep 2016-On Progress |
Electrical, MVAC, Fire Service and P&D Installation for The Bridges Street Market as Hong Kong New-Expo at 2 Bridge Street | Hong Kong New-Expo | Jul 2016-On Progress |
E & M Installation for Heep Hong Society Catherine Lo Centre | Heep Hong Society | Mar 2016-On Progress |
2 Storeys Shop House at Sai Kung | Plaza Hut | Jan 2016-On Progress |
Alteation Works for New Footbridge Connection at Popcorn 2 and Bauhinia Garden | MTR Corporation Limited | Oct 2015-On Progress |
E & M Installation at Hip Cellar 5/F | Hip Cellar | Jan 2013 – Apr 2013 |
Fanling Rhenish Church Secondary School Library | Fanling Rhenish Church Secondary School | Jul 2012 – Oct 2013 |
E&M Installation at Kowloon Shangri-LA Hotel Kowloon Room | Shangri-LA Hotel | Jul 2012 – Sep 2012 |
E&M Installation at Kowloon Shangri-LA Hotel | Shangri-LA Hotel | Jul 2012 – Aug 2012 |
E&M Installation at G/F Kingswood Ginza, Phase 2 Tin Shui Wai | Sino Group | Jun 2012 – Jan 2013 |
Term Contract-Building Services Repairs and Maintenance Term Contract 2012/2015 The Hong Kong Polytechnic University | The Hong Kong Polytechnic University | May 2012 – On Progress |
Main Contract for the Renovation Works at Yiu On Shopping Centre Shatin | The Link | May 2012 – May 2013 |
Upgrading Work of Automatic Fire Alarm Installation | English School Foundation | Dec 2011 – Mar 2012 |
Building & Refurbishment Works for OCC Migratiion | MTR Corporation Limited | Sep 2011 – Aug 2013 |
E&M Installation at Shatin Junior School | English School Foundation | Jun 2011 to Aug 2012 |
Annual FMRII Works & Classroom Block Vertical Extension Works at Shatin College | English School Foundation | Jun 2011 to Jun 2012 |
Addition and Alteration Works at Portion of G/F, 2/F & upper 2/F, 413 Castle Peak Road, Cheung Sha Wan | Hong Kong Housing Society | Jun 2011 to Oct 2011 |
E & M Installation for Renovation Works (Internal & External ) for Existing Hoi Bun School , Lei Yue Mun , Kln | Innovative Design Group Ltd. | May 2011 to Jul 2011 |
Addition and Alteration Works at 12 Kai Chiu Road, Causeway Bay | Perfect Land Asia Limited | Mar 2011 to Jul 2011 |
E&M Reinstatement Works at Fisherman’s Wharf | Cheung Kong Holding Ltd. | Feb 2011 to Apr 2011 |
E&M Installation Works for Aon China Building 1/F Office | Hutchison Whampoa Property Limited | Feb 2011 to Mar 2011 |
Major Renovation of stanley Plaza, Stanley, Hong Kong (Phase 1b) | The Link | Aug 2010 to Nov 2011 |
Caritas Bianchi Lodge at 4 Cliff Road, Yau Ma Tei, Kowloon | Caritas Hong Kong | Aug 2010 to Mar 2011 |
E & M and P & D Installation of Renovation Lavatories at Metropolis Mall | Metropolis Mall | Aug 2010 to Dec 2010 |
Fitting Out Works for Caritas Community Centre-Caine Road (A2R) G/F, 2/F, 4/F&5/F at Caritas House, 2 Caine Road, HK | Caritas Hong Kong | Jun 2010 to Nov 2010 |
Wong Chan Sook Ying Memorial School at Yuen Long | ASD | Apr 2010 to Jan 2011 |
E & M Installation at BOC Mongkok Building | Bank of China (Hong Kong) Ltd. | Feb 2010 to May 2010 |
Mei Foo Phase 7 shopping centre | The Incorporated Owners of Mei Foo Sun Chuen | Sep 2009 to May 2010 |
E & M Installation at Hing Wah Estate | The Link | Mar 2009 – Mar 2010 |
Proposed Construction of Management Office at Sui Wo Court, Shatin | Kai Shing Management Servives Ltd. | Aug 2008 – Oct 2008 |
Renovation of School of Continuing and Professional Education (SCOPE)-Ka Chi School | City University of Hong Kong | Jul 2008 to Sep 2008 |
New Archives for Library at Grandtech Centre | City University of Hong Kong | Feb 2008 – Jun 2008 |
Lecture Theatres LT5, LT7, LT9, LT10, LT11 & LT12 | City University of Hong Kong | Jan 2008 – Jul 2008 |
Renovation Works at Chak On Estate Market, Shek Kip Mei | City University of Hong Kong | Jan 2008 – May 2008 |
Inno Centre, 72 Tak Cee Avenue, City University of Hong Kong | City University of Hong Kong | Jan 2008 – Apr 2008 |
Inno Centre, 72 Tak Cee Avenue, City University of HK | City University of Hong Kong | Jan 2008 to Apr 2008 |
Hong Kong Baptist University at Wu Chung 26/F | Hong Kong Baptist University | Jul 2007 – Sep 2007 |
16/F MLC Millennia Plaza | Goodwell – Prosperity Property Services Limited | Jan 2007 – Mar 2007 |
MTR Enhancement works contract no C7806-06C | MTR Properties Management | Oct 2006 – Nov 2006 |
Tai Po Tai Yuen Estate Grace Church | Remembrance of Grace Church | May 2006 – Jul 2006 |
Warehouse Development at 14-18 Tsing Tim Street, Tsing Yi | Hop Fat Construction Co. Ltd. | May 2006 – Jun 2006 |
E&M Package for Proposed Religious Institution Building On 53 Cumberland | Hop Fat Construction Co. Ltd. | Jan 2001 – Nov 2001 |
Plumbing & Drainage Installation
The Plumbing and Drainage Department specialises in the Design, Supply, Installation, Testing and Commissioning of P&D systems for various types of developments, including residential, industrial and commercial projects. Their success amply demonstrates our ability to provide a high standard of service to the client’s satisfaction.
Accreditation Water Supplies Department
Grade 1 Plumber’s Licence
Job Reference
Project | Owner | Contract Period |
Main contract for asset enhancement works at Sheung Tak Plaza (Phase 1) | Link Asset Management Ltd. | Oct 2017-On Progress |
Olympian city 2 G/F market and food corridor | Sino Estates Management Limited | Aug 2017-Dec 2017 |
Hong Kong Polyu M102 M103 | Hong Kong Polytechnic University | Aug 2017-Nov 2017 |
Discovery Bay Area 2A – Plumbing & Drainage Works, Fire Services Works and Pool Filtration System Installation Nominated Sub-Contract (HK-4401,/PD/LTR224438) | Hong Kong Resort Co., Ltd. | Jun 2017-On Progress |
Guestroom and corridor renovation 1/F to 3/F and 5/F Gold Coast Hotel | Sino Estates Management Limited | Apr 2017-Jun 2017 |
UG/F shop re-layout at Olympian City 2 | Sino Estates Management Limited | Apr 2017-Jul 2017 |
Tuen Mun Town Plazas 1 Upgrade Toilet | Sino Estates Management Limited | Apr 2017-On Progress |
Electrical, MVAC, Fire Service and P&D Installation for The Bridges Street Market as Hong Kong New-Expo at 2 Bridge Street | Hong Kong New-Expo | Jul 2016-On Progress |
E&M Installation for Alteration and Addition Works for 3/F North Wing at West Kowloon Campus and 4/F Canteen at Hung Hum Bay Campus | The Hong Kong Polytechnic University | Jul 2016-Dec 2016 |
E&M Installation for Harbourview Guestroom Renovation Works to 20F and 21F | The Hong Kong Harbourview | Jun 2016-Aug 2016 |
Electrical and P&D Installation for Temporary Footbridge Works at Tai Wai Station Property Development- Addendum no 1 | MTR Corporation Limited | Feb 2016-May 2016 |
Alteation Works for New Footbridge Connection at Popcorn 2 and Bauhinia Garden | MTR Corporation Limited | Oct 2015-On Progress |
Replacement Sewage Pump at Cheung Fat Plaza | The Link Management Limited | Sep 2015-On Progress |
Replacement of Building Services Pipework and Chilled Water Pipes | Hong Kong Baptist University | Aug 2015-Dec 2015 |
Plunbing and Drainage Works at 555 Nathan Road | Centtury Nice Development Limited | May 2015-Jun 2016 |
12-Month Contract for Operation and Maintenance of Electrical, Mechanical and Air-conditioning Systems at Yung Fung Shee Memorial Centre and Pamela Youde Polyclinic | Electrical and Mechanical Services Department | Jul 2015-Jul 2016 |
Refurbishment of Disable Toilet at City U | City University of Hong Kong | Jul 2015-Sep 2015 |
Home Shanghai at Yoho Midtown | Home Shanghai | Jun 2015-Oct 2015 |
Plumbing & Drainage Installation for Tung Hei Road Phase 2 | Leisure and Cultural Serivces Department | Jun 2015-Oct 2015 |
5-Month Contract for Operation & Maintenance of Electrical, Mechanical and Air-conditioning Systems at Yung Fung Shee Memorial Centre & Pamela Youde Polyclinic | Electrical and Mechanical Services Department | Feb 2015-Jul 2015 |
Replacement Works for Cold Water Tank and Flushing Water Tank at Enterprise Place (5W) and Green 18 (18E) in Hong Kong Science Park | Urban Property Management Limited | Jan 2015-May 2015 |
MVAC Installation at No 6 Tsun Wen Road Tuen Mun | Luk’s Industrial Company Limited. | Dec 2014-Nov 2017 |
E & M Installation at Café 187 TPTL Tai Po | Sino Group | Aug 2014-Sep 2014 |
E&M Installation at Café’ at TPTL 187 Tai Po (Providence Bay) |
Sino Group | Jun 2014-Feb 2014 |
E & M Installation at Shop 126 to 127 Olympian City 2 | Sino Estates Management Limited | Apr 2014-Sep 2015 |
Replacement fo The Damaged 500mm dia. Discharge Pipe Work Fittings for The Sea Water Pump Set no. 1-3 at Sea Water Pump House of City Garden | Cayley Property Management Ltd. | Apr 2014-Oct 2014 |
E&M Work at 313 prince road | Paxton | Apr 2014-Apr 2014 |
P&D, Electical, MVAC & Chiller Plant Installation The Hong Kong Polytechnic University Alteration and Addition Works at W7/F |
The Hong Kong Polytechnic University | Mar-14 |
Pumping Installation and Miscellaneous Mechanical Equipment Maintenance Services at Unattended Venues at New Territories West Cluster | Electrical and Mechanical Services Department | Jan 2014-Feb 2015 |
The Salvation Army Headquarters and Booth Lodge at No. 11, Wing Sing Lane, Yaumatei, Kln. | The Salvation Army | Dec 2013 |
E&M Work at Mei Lam Estate | The Link Management Limited | Nov 2013-Nov 2014 |
Interior Fit-out Works for Café’ at Tai Po TPTL 187 | Sino Group | Nov 2013 |
E&M Installation at Mei Tin Estate | Tung Wah Group of Hospitals | Oct 2013-May 2014 |
E&M Installation at G/F and 1/F Kingswood Ginza, Phase 2 Tin Shui Wai | Cheung Kong Property Development Ltd. | Oct 2013-May 2014 |
Proposed for the Commercial Development at 1L-1M Sai Yeung Choi Street South, Mongkok | Times Investment Limited | Sep 2013-Mar 2014 |
Main Contract for the Renovation Works at Yau Oi Shopping Centre (Phase 3 – Yau Oi Shopping Centre) | The Link Management Limited | Sep 2013-Sep 2015 |
Home Care Centre for girls at 1/F Ching Kwai House Cheung Tsing Estate | Home Affairs Department | Jul 2013-Oct 2013 |
Renovation Works for Prining Room (OEM503 to OEM506) at Hong Kong Bapist University | Hong Kong Baptist University | Jun 2013-Nov 2013 |
Fitting-out Works to YMCA Shek Kip Mei | YMCA | Jun 2013-Oct 2013 |
E&M Installation Renovation Works for Chinese YMCA of Hong Kong Tin Ping Neighborhood Elderly Centre at Unit 116, 117 & 119, G/F., Tin Ming House, Tin Ping Estate, Sheung Shui, N.T. | YMCA | Jun 2013-Oct 2013 |
Shop Re layout at Level 3 at China Hong Kong City | Sino Group | Jun 2013-Sep 2013 |
Japanese & Vietnamese Restaurant – 4/F Lee Garden II | 1957 & Co. | Jun 2013-Aug 2013 |
Provision for electrical maintenance works carried out in municipal venues of Hong Kong Region | Electrical and Mechanical Services Department | Jan 2013-Feb 2014 |
E & M Installation at Hip Cellar 5/F | Hip Cellar Limited | Jan 2013-Apr 2013 |
(1194EM12S) 18-month Term Contract for Maintenance of Electrical, Mechanical, and Air-conditioning Installations and Hospital Equipment at Siu Lam Hospital | Electrical and Mechanical Services Department | Jul 2012-Feb 2014 |
E&M Installation at Kowloon Shangri-LA Hotel Kowloon Room | Shangri-LA Hotel | Jul 2012-Sep 2012 |
Po Leung Kuk Shek Kip Mei Small Group Home | Po Leung Kuk | Jul 2012-Aug 2012 |
E&M Work Staff Resturant at Repulse Bay | The Hong Kong and Shanghai Hotels Limited | Jul 2012-Aug 2012 |
E&M Installation at Proposed Food Factory at TIK 12-13 Tiu Keng Leng Station | Sushi Take-Out | Jul 2012-Aug 2012 |
E&M Installation at Kowloon Shangri-LA Hotel | Shangri-LA Hotel | Jul 2012-Aug 2012 |
E&M Installation at G/F Kingswood Ginza, Phase 2 Tin Shui Wai | Sino Group | Jun 2012-Jan 2013 |
MVAC and PD Work Staff Restaurant Kitchen at Repulse Bay | Repulse Bay Hotel | Jun 2012-Jul 2012 |
Term Contract-Building Services Repairs and Maintenance Term Contract 2012/2015 The Hong Kong Polytechnic University | The Hong Kong Polytechnic University | May 2012-May 2015 |
Main Contract for the Renovation Works at Yiu On Shopping Centre Shatin | The Link Management Limited | May 2012-May 2013 |
Improvement of Flushing Water Supply System for Good Hope School | Good Hope School | May 2012-Aug 2012 |
E&M Installation at Royal Pacific Hotel | Royal Pacific Hotel | Mar 2012 |
E&M Renovation of Wanchai Market | Social Walfare Dapertment | Dec 2011 |
Building & Refurbishment Works for OCC Migratiion | MTR Corporation Limited | Sep 2011-Aug 2013 |
Addition and Alteration Works at Portion of G/F, 2/F & upper 2/F, 413 Castle Peak Road, Cheung Sha Wan | Hong Kong Housing Society | Jun 2011-Oct 2011 |
The Electrical Installation, Ventilation Installation and Builder’s Works for Central Meal Portioning at 7 Numbers Subvented School in NT Areas | Electrical and Mechanical Services Department | Jun 2011-Sep 2011 |
E & M Installation for Renovation Works (Internal & External ) for Existing Hoi Bun School , Lei Yue Mun , Kln | Innovative Design Group Ltd. | May 2011-Jul 2011 |
Addition and Alteration Works at 12 Kai Chiu Road, Causeway Bay | Perfect Land Asia Limited | Mar 2011 |
E&M Installation Works for Aon China Building 1/F Office | Hutchison Whampoa Property Limited | Feb 2011-Mar 2011 |
Electrical, MVAC and PD Intstallation at TMTL Jusco Store on UG/F and 1/F | Tuen Mun Town Plaza | Sep 2010-May 2011 |
Major Renovation of Stanley Plaza, Stanley, Hong Kong (Phase 1b) | The Link Management Limited | Aug 2010 |
Rhine Garden Block 5-Replacement of fresh water down pipe | Synergis Services Management Ltd. | Aug 2010 |
Caritas Bianchi Lodge at 4 Cliff Road, Yau Ma Tei, Kowloon | Caritas Hong Kong | Aug 2010 |
E & M and P & D Installation of Renovation Lavatories at Metropolis Mall | Metropolis Mall | Aug 2010 |
Replace tenant copper pipe at water meter at Richland Garden | Richland Garden Management Ltd. | Aug 2010 |
Tuen Mun Town Plaza 209 | Sino Group | Jul 2010-Dec 2010 |
Excelsior Hotel 1/F, 2/F & 3/F Washrooms | Excelsior Hotel | Jun 2010-Dec 2010 |
Proposed New Roof Extension for Victoria Shanghai Academy at Shum Wan Road, Aberdeen | Victoria Shanghai Academy | Jun 2010-Dec 2010 |
Wong Chan Sook Ying Memorial School at Yuen Long | Architectural Services Department | Apr 2010-Jan 2011 |
Ho Shun Fuk Building-Replacement of Whole Building’s Main and Sub-main fresh water pipe | Ho Shun Fuk Building | Apr 2010-May 2010 |
E & M Installation at BOC Mongkok Building | Bank of China (Hong Kong) Ltd. | Feb 2010-May 2010 |
Richland Garden, Tuen Mun | Richland Garden Property Management Ltd. | Nov 2009 |
8 Hart Avenue, Tsim Sha Tsui | Jones Lang LaSalle | Oct 2009-Dec 2009 |
Mei Foo Phase 7 shopping centre | The Incorporated Owners of Mei Foo Sun Chuen | Sep 2009-May 2010 |
Satay Inn and Function Rooms of Hong Kong Gold Coast Hotel | Sino Group | Sep 2009-Nov 2009 |
Kwu Tung Show House | Sino Group | Jun 2009-Jul 2009 |
Plumbing Work at TVB roof floor Tseung Kwan O | Television Broadcasts Limited | Apr 2009-Apr 2009 |
E & M Installation at Hing Wah Estate | The Link Management Limited | Mar 2009 |
Mei Foo Sun Chuen Stage 6 | The Incorporated Owners of Mei Foo Sun Chuen | Nov 2008-Mar 2010 |
Proposed Construction of Management Office at Sui Wo Court, Shatin | Kai Shing Management Services Ltd. | Aug 2008-Oct 2008 |
Alternation & Addition Work at Kingswood Ginza Plaza on T.S.W.T.L. No.4 | Cheung Kong Property Development Ltd. | Jul 2008-Dec 2008 |
Unit A, 20/F., Carnation Court, 43 Tai Hang Road, Hong Kong | Residential Flat | Apr 2008-Jul 2008 |
109 Repulse Bay Road, Repulse Bay Hotel | The Hong Kong and Shanghai Hotels Limited | Apr 2008-Apr 2008 |
Renovation Works at Sin Hua Bank Building Electrical and Drainage Installation Works | Bank of China (Hong Kong) Ltd. | Feb 2008-Mar 2008 |
Renovation of toilets and Baby Care Room at G/F., UG/F. and 1/F. of Shopping Arcade at Olympian City Phase II | Sino Group | Oct 2007-Nov 2007 |
Satay Inn at Shop 3, Tower1, China Hong Kong City, 33 Canton Road, Tsim Sha Tsui, Kowloon | Sino Group | Jul 2007-Sep 2007 |
Hong Kong Baptist University at Wu Chung 26/F | Hong Kong Baptist University | Jul 2007-Sep 2007 |
Gold Coast Hotel-Wedding Garden | Sino Group | May 2007-May 2007 |
20/F & 21/F Office Renovation and 1/F, 2/F, 3/F&5/F Minor Works at One Harbourfront | Whampoa Property Management Limited | Dec 2006 |
1/F to 3/F Main Atrium Tuen Mun Town Plaza T.M.T.L. 209 | Sino Group | Sep 2006-Dec 2006 |
ST Paul’s School & S.K.H. Kei Hau Secondary School | Architectural Services Department | Aug 2006-Aug 2006 |
Tai Po Tai Yuen Estate Grace Church | Remembrance of Grace Church | May 2006-Jul 2006 |
Tsim Sha Tsui Centre | Sino Group | Dec 2005 |
Pacific Hong Kong Centre | Sino Group | Dec 2005 |
House 19, Fei Ngo Shan | Owner of the House | Apr 2005-Nov 2005 |
Project | Owner | Contract period |
Main contract for asset enhancement works at Sheung Tak Plaza (Phase 1) | Link Asset Management Ltd. | Oct 2017-On Progress |
HKU Haking Wong Building – Installation Standalone Window AC units | The University of Hong Kong | Oct 2017-On Progress |
Lift Addition for Three Schools- Carmel Bunnan Tong Memorial Secondary School, Cotton Spinners Assoiation Secondary School and CCC Kei Wai Primary School for HKSAE (RF FM002) | Education Bureau (HKSAR) | Oct 2017-On Progress |
HKIA Level 3 Plantroom Transportation centre | Hong Kong International Airport | Sep 2017-On Progress |
Carmel Alison Lam Foundation Secondary School | Education Bureau (HKSAR) | Sep 2017-On Progress |
Olympian city 2 G/F market and food corridor | Sino Estates Management Limited | Aug 2017-Dec 2017 |
Hong Kong Polyu M102 M103 | Hong Kong Polytechnic University | Aug 2017-Nov 2017 |
MVAC Installation 4/F Supplies Building Lamma Power Station | Hong Kong Electric Co | Aug 2017-Dec 2017 |
Tennis Court at Causeway Sport Ground | Architectural Services Department | Aug 2017-On Progress |
Tung Hei Road Toilet | Architectural Services Department | Aug 2017-On Progress |
New Entrance on GF of Metro City Plaza III, T.K.O.T.L. 34 Tseung Kwan O, New Territories – MVAC Installation | Henderson Land Development Company Limited | Jul 2017-On Progress |
The Proposed Residential and Commercial Development at YLTL527 Yuen Long, N.T – MVAC installation | Henderson Land Development Company Limited | Jul 2017-On Progress |
HKBU AML511 Level 5 Au Shue Hung Memorial Library | Hong Kong Baptist University | Jul 2017-Aug 2017 |
Island School – Shatin (campus B) | English School Foundation | Jul 2017-On Progress |
Footbrige near Old Bailey Street | The jockey Club CPS Limited | Jun 2017-On Progress |
Discovery Bay Area 2A – Plumbing & Drainage Works, Fire Services Works and Pool Filtration System Installation Nominated Sub-Contract (HK-4401,/PD/LTR224438) | Hong Kong Resort Co., Ltd. | Jun 2017-On Progress |
Discovery Bay Area 2A- MVAC Services Installation Nominated | Hong Kong Resort Co., Ltd. | Jun 2017-On Progress |
ESF – South Island School | English School Foundation | Jun 2017-Aug 2017 |
Area 9A Discovery Bay – Electrical installation | HKR International Ltd | Jun 2017-On Progress |
CUHK 3/F Far East Consortuium Building Jordan | Chinese University of Hong Kong | May 2017-Jul 2017 |
Shatin Centre L3 shopping centre Phase 3 and 4 (MVAC) | Henderson Land Development Company Limited | May 2017-Dec 2017 |
Guestroom and corridor renovation 1/F to 3/F and 5/F Gold Coast Hotel | Sino Estates Management Limited | Apr 2017-Jun 2017 |
UG/F shop re-layout at Olympian City 2 | Sino Estates Management Limited | Apr 2017-Jul 2017 |
Tuen Mun Town Plazas 1 Upgrade Toilet | Sino Estates Management Limited | Apr 2017-On Progress |
Shopping Arcade One Silver | Sino Estates Management Limited | Mar 2017 -Feb 2018 |
One Silver G/F, UG/F and 2/F | Sino Estates Management Limited | Mar 2017 -Jun 2017 |
Cha Kwo Ling Sitting Out Area | Home Affairs Department | Feb 2017-Jul 2017 |
MVAC installation for Manhattan Plaza 23 Sai Ching Street Yuen Long | Henderson Land Development Company Limited | Feb 2017-On Progress |
E&M Installation for CSBS Mrs. Aw boon Haw Secondary School | Education Bureau (HKSAR) | Feb 2017-On Progress |
Electrical, MVAC & Fire Services Installation for Proposed Extension (Phase 3) & Alterations & Additions for Hong Chi Association Advanced Training Centre at Pinehill Village, Cheung Nga Road, Nam Hang, Tai Po, N.T. | Hong Chi Association | Feb 2017-On Progress |
Replacement of Electrostatic Precipitator at G1, STRC (2017) (RFQ7117) | Hong Kong Jocky Club | Feb 2017-On Progress |
E&M Installation for Signature Project Scheme (Eastern Distric) -Eastern District Cultural Square (SSE508) | Architectural Services Department | Jan 2017-On Progress |
MVAC Installation for Lamma Power Station ExtensionNo.4 Demineralization Plant | Hong Kong Electric Co. Ltd. | Jan 2017-Dec 2017 |
E&M Installation for A&A Works at Tuen Mun Town Plaza 1, 1 Tuen Shun Street, Tuen Mun, N.T. | Sino Estates Management Limited | Dec 2016 -On Progress |
80 Gloucester Road – 10/F MVAC Installation | Luen Fung Contractors Ltd. | Dec 2016 -On Progress |
MVAC Installation Works of Proposed Fitting-out Works for Manhattan Plaza, 23 Sai Ching Street, Yuen Long | Henderson Land Development Company Limited | Dec 2016 -On Progress |
E&M Installation for Cognita A&A Works at 25 Man Fuk Road , Ho Man Tin | Stamford American School | Dec 2016 -On Progress |
Electrical, MVAC and FS Installation for Renovation works for Hong Kong Playground Association Tung Chung Camp at 38 Ngau Au Village, Tung Chung, Hong Kong | Hong Kong Playground Association | Dec 2016 -Apr 2017 |
E & M Installation for A&A Works for HKBU-Renovation Works at 9/F of Sir Run Run Shaw Building | Hong Kong Baptist University | Dec 2016-Mar 2017 |
E&M Installation for Refurbishment and Strengthening of Mammal Cage at Hong Kong Zoological and Botanical Gardens (P1000819 ) | Architectural Services Department | Dec 2016 -Apr 2017 |
Electrical Installation for Construction of Sitting-out Area at the Eastern Bank of Tuen Mun River | Home Affairs Department | Dec 2016 -On Progress |
Renovation Works to Discovery Bay Office Centre (HKP/PD/DBOC/0387/2016) – Tender Query No.1 | Hong Kong Resort Company Limited | Dec 2016 -Dec 2017 |
HKBU Shek Mun power socket 7/F to 11/F | Hong Kong Baptist University | Dec 2016 -Apr 2017 |
Electrical, MVAC and Fire Services Installation for Alteration and Addition Works at U003 and U003A for the Hong Kong Polytechnic University | The Hong Kong Polytechnic University | Dec 2016 -Mar 2017 |
A&A Works fro Metro City Plaza II – Electrical Installation | Henderson Land Development Company Limited | Dec 2016 -May 2017 |
E&M Installation for Renovation Works for 3/F & 5/F, Holy Trinity Bradbury Centre, 139 Ma Tau Chung Road, Kowloon, HK | Golden Build | Dec 2016 -Apr 2017 |
Provision of Stage Engineering Services at Hong Kong Coliseum | Electrical and Mechanical Services Department | Nov 2016 -Dec 2016 |
1-19 Nam Cheong Street | Henderson Land Development Company Limited | Nov 2016 -On Progress |
Electrical Installation for Refurbishment to Leisure Pool and Water Play Equipment at Hammer Hill Road Swimming Pool | Architectural Services Department | Nov 2016 -Mar 2017 |
Supply and Replacement of Cassette type Air Conditioner for Heng Fa Chuen | MTR Corporation Limited | Nov 2016 -Feb 2017 |
3-Month Term contract for Maintenance Heating, Ventilation and Air-Conditioning Installations for Tseung Kwan O Hospital | Electrical and Mechanical Services Department | Nov 2016 -Jan 2017 |
5-Month Contract for Operation and Maintenance of Electrical, Mechanical and Air-conditioning Systems at Yung Fung Shee Memorial Centre and Pamela Youde Polyclinic | Electrical and Mechanical Services Department | Oct 2016-Mar 2017 |
Provision of Electrical, Mechanical & Building Services Support Services at New Specialist Clinic Block and Various Blocks of Queen Elizabeth Hosptial | Electrical and Mechanical Services Department | Oct 2016- May 2017 |
Provision of Technical Service at Stenecuttars Island Governement Dockyard under MunCS | Electrical and Mechanical Services Department | Oct 2016-On Progress |
Fire Services Installation for Refurbishment to Atrium of Po On Road Municipal Services Building (RF E817) | Architectural Services Department | Oct 2016-On Progress |
Electrical Installation for CUHK 4/F,Cheng Yu Tung Building | City University of Hong Kong | Oct 2016-On Progress |
E&M Installation for Yau Tsim Mong Multicultural Activity Centre | Architectural Services Department | Oct 2016- On Progress |
Electrical Installation for Proposed Residential Development at Kou To Shan | Eminent Gold Inverstment Ltd,. | Oct 2016-On Progress |
Electrical & MVAC Installation for Refurbishment to Shelter and Toilet in Tsuen Wan Tin Hau Temple Garden | Architectural Services Department | Sep 2016-Oct 2017 |
22-month Term Contract for Inspection, Testing and Maintenance of Fire Services Installations/Equipment and Related Building Services Installation for Jockey Club Innovation Tower (JCIT) & Phase 8 of PolyU for Year 2016-18 | The Hong Kong Polytechnic University | Sep 2016-On Progress |
Provision of Engineering Works for Supporting Engineering System Project Management Service under MunSD from Year 2016 to 2018 | Electrical and Mechanical Services Department | Sep 2016-On Progress |
Electrical Installation at 1752 DD122,Tong Yan San Tsuen, Yuen Long | Henderson Land Development Company Limited | Aug 2016 -On Progress |
MVAC Installation for Renovation of G/F & 5/F Supplies Building, Lamma Power Station | Henderson Land Development Company Limited | Aug 2016 -Dec 2016 |
North Point Station Building – Refurbishment of MVAC System (Stage 4) (c/n 16/2712) (PD/835/14/110) | Hong Kong Electric Co. Ltd. | Aug 2016 -On Progress |
E&M Installation for Refurbishment to Refurbishment to Fu Tei Sheung Tsuen Aqua Privy, Tuen Mun | Architectural Services Department | Aug 2016 -On Progress |
E&M Installation for Refurbishment of Changing Rooms at Sham Shui Po Sports Ground | Architectural Services Department | Jul 2016-Nov 2016 |
E & M Installation for Li Po Chun Health Centre | Architectural Services Department | Jul 2016-Nov 2016 |
Electrical Installation for Fitting Out Works to 4F & 6F Cheng Yu Tung Building, CUHK | City University of Hong Kong | Jul 2016-Sep 2016 |
Electrical & MVAC Installation for Fitting Out Works at 6/F Ho Sin Hang Engineering Building | City University of Hong Kong | Jul 2016-Sep 2016 |
Electrical, MVAC, Fire Service and P&D Installation for The Bridges Street Market as Hong Kong New-Expo at 2 Bridge Street | Hong Kong New-Expo | Jul 2016-On Progress |
E&M Installation for Alteration and Addition Works for 3/F North Wing at West Kowloon Campus and 4/F Canteen at Hung Hum Bay Campus | The Hong Kong Polytechnic University | Jul 2016-Dec 2016 |
Replacement of Air Conditioning System at Hong Kong Observatory Headquarters | Electrical and Mechanical Services Department | Jul 2016-On Progress |
E&M Installation for Pet Garden and a Model Car Play Area | Home Affairs Department | Jun 2016- Feb 2018 |
E&M Installation for Renovation Works on 4F of Au Shue Hung Memorial Library and 6F of Cha Chi-Ming Science Tower, HKBU | Hong Kong Baptist University | Jun 2016-Sep 2016 |
E&M Installation for Harbourview Guestroom Renovation Works to 20F and 21F | The Hong Kong Harbourview | Jun 2016-Aug 2016 |
Replacement of six sets of the existing 3-way control valve for the condensing pipe system by 2-way isolating gate valve complete with associated pipe work at Jockey ClubInnovation Tower 15/F | The Hong Kong Polytechnic University | May 2016-Aug 2016 |
E & M Installation for Design and Build Contract for Halal Catering Outlet at 5/F Amenities Building | City University of Hong Kong | May 2016-Aug 2016 |
The Chinese University of Hong Kong 702 Wong Foo Yuan Building | The Chinese University of Hong Kong | May 2016-Jun 2016 |
Modification of MVAC System for GCD/GC & GCD/CS Stores on 4F of Electrical centre (PD/670/14/015) | Hong Kong Electric Co. Ltd. | May 2016-Dec 2016 |
Diacovery Bay North Sales Office- Proposed E & M Works for Art Gallery | Hong Kong Resort Company Limited | May 2016-On Progress |
E & M Installation for Reference Electrical Diagrame for Pillar Box underneath Footbridge Staircase | Tsing Lun Road | May 2016-Aug 2016 |
12 Months Provision of Electronic and Electrcial Maintwnance Serivices at Tin Shui Wai Community Health Centre (TSWCHC) | Electrical and Mechanical Services Department | Apr 2016-Apr 2017 |
MVAC installation for 19/F Gloucester Road | Grand Rich | Apr 2016-May 2016 |
Provision of Fitness Equipment Near Holford And Lighting | Home Affairs Department | Apr 2016-On Progress |
Pak Fuk Tin Sum Playground, Fanling | Architectural Services Department | Apr 2016-Jul 2016 |
80 Gloucester Road – 18/F MVAC installation | Grand Rich | Apr 2016-May 2016 |
Proposed Residential Development at Discovery Bay North Phase 16 MVAC Installation Sub-Contract | Hong Kong Resort Co., Ltd. | Mar 2016 -On Progress |
Commercial Center Extension at Discovery Bay, Lantau Island Nominated Sub-Contract for MVAC Installation | Hong Kong Resort Co., Ltd. | Mar 2016-On Progress |
Replacement of cooling coil of air handling unit at Tai Po Hui Market and Cooked Food Centre in the New Territories | Electrical and Mechanical Services Department | Mar 2016 -Jul 2016 |
Electrical Installation at Peng Chau Clinic | Home Affairs Department | Mar 2016 -On Progress |
E & M Installation for Heep Hong Society Catherine Lo Centre | Heep Hong Society | Mar 2016 -On Progress |
Mei Foo Neighborhood Activity Centre | Home Affairs Department | Mar 2016 -On Progress |
Cheung Sha Wan Plaza | Henderson Land Development Company Limited | Mar 2016 -On Progress |
Provision of Stage Engineering Service at Ngua Chi Wan Civic Centre | Electrical and Mechanical Services Department | Apr 2016-On Progress |
Provision of Daily Operation, Repairs and Maintenance Services to Mechanical Installation | The Hong Kong Polytechnic University | Mar 2016-On Progress |
80 Gloucester Road – 17/F MVAC installation | Grand Rich | Feb 2016 -Feb 2016 |
Supply and Installation of Chilled Water Isolation Valve and Pipeworks for Hong Kong Museum of Art, Watt-hour Meter | Electrical and Mechanical Services Department | Feb 2016 -Feb 2017 |
Replacement of Existing Floodlight by Energy Efficient Induction Luminaires at Lai Sua Correctional Institution, Nei Kwu Correctional Insitution and Caoe Correctional Institution | Architectural Services Department | Jan 2016 -Feb 2016 |
Electrical Installation for Tuen Mun District Welcome Sign | Homes Affairs Department | Feb 2016 -On Progress |
Tsun Yip Cooked Food Market | Architectural Services Department | Feb 2016 -Aug 2016 |
E &M Installation for Toilets on 2/F of Cityview | YWCA | Feb 2016 -Apr 2016 |
保良局何壽南小學安裝冷氣系統工程 | Po Leung Kuk | Feb 2016 -Apr 2016 |
Electrical & MVAC Installation at Tuen Mun Storage Centre | Architectural Services Department | Feb 2016-On Progress |
Electrical and P&D Installation for Temporary Footbridge Works at Tai Wai Station Property Development- Addendum no 1 | MTR Corporation Limited | Feb 2016 -May 2016 |
Proposed Residential Development at Discovery Bay North Phase 16 | Hong Kong Resort Company Limited | Jan 2016-On Progress |
2 Storeys Shop House at Sai Kung | Plaza Hut | Jan 2016- On Progress |
Maintenance of Air Conditioning System for Caibbean Square | Citybase Property Management Limited | Jan 2016- On Progress |
Provusion of Maintenance Services for Electrical, Mechanical and Air-conditioning Inatallations and Hospital Equipment at Siu Lam Hospital | Electrical and Mechanical Services Department | Jan 2016- Jan 2017 |
Supply and Replacement of Split Type Air-Conditioning Units at Central Park and Park Avenue (Q045047) | MTR Corporation Limited | Jan 2016- On Progress |
Preventive Repair and Maintenance of MVAC System at The Cube, Wing Fat Building | Jones Lang LaSall Management Services Ltd | Jan 2016- Dec 2017 |
Provision of Maintenance Services for Fire Dampers and Miscellaneous Equipment at Pok Oi Hopsital | Electrical and Mechanical Services Department | Jan 2016- Dec 2016 |
Provision of Electrical Maintenace Services at Castle Peak Hopstial | Electrical and Mechanical Services Department | Jan 2016- Dec 2016 |
雨川小學3至6樓輔導教學室冷氣更換工程 | Po Leung Kuk | Nov 2015 -Dec 2015 |
R/F Cooling Tower Relocation & Replacement | Hip Cellar Limited | Nov 2015 -On Progress |
Replacement of pump, VRVs, split type units, pipework and ductwork of Leisure and Cultural Serivces Depatment in the New Territories | Electrical and Mechanical Services Department | Nov 2015 -Sep 2016 |
1881 Heritage – 更新1號風冷式冷氣機之散熱器盤管工程 | Citybase Property Management Limited | Nov 2015 -Dec 2015 |
Ministry Building – 更換天台冷氣機房隔音板之工程 | Citybase Property Management Limited | Nov 2015-Mar 2016 |
Air Conditioning Plant Services Contract | Citybase Property Management Limited | Nov 2015-Oct 2017 |
Conversion of Orientation Theatre to Jin Yong Gallery at Hong Kong Heritage Museum | Leisure and Cultural Serivces Department | Nov 2015 -Sep 2016 |
Electrical and MVAC Installation at Tuen Mun Public Toilet | Architectural Services Department | Oct 2015- On Progress |
Renovation of Existing E&M Installation and Builder Works for DBOC at Discovery Bay | Hong Kong Resort Company Limited | Oct 2015- Sep 2016 |
Electrical Installation for A&A Works at Metro City Plaza II, Phase 5, Tseung Kwan O, TKOTL27 | Heng Tat Construction Co. Ltd. | Oct 2015- On Progress |
Alteation Works for New Footbridge Connection at Popcorn 2 and Bauhinia Garden | MTR Corporation Limited | Oct 2015- On Progress |
鹿茵山莊會所及服務中心空調系統維修保養合約 | Goodwell Property Management Limited | Oct 2015- Sep 2017 |
Replacement Sewage Pump at Cheung Fat Plaza | The Link Management Limited | Sep 2015-On Progress |
Maintenance Services of VRV System Contract at Banyan Mall | Citybase Property Management Limited | Sep 2015-Sep 2017 |
Replacement of VRVs, Split Type Units, PAU & Ahu at Swimming Pool of Leisure and Cultural Serivces Depatment in the New Territories | Electrical and Mechanical Services Department | Sep 2015-Sep 2016 |
Nursery Garden Next to Fu Tei Fire Station | Leisure and Cultural Serivces Department | Sep 2015-May 2016 |
Provison of Operation and Maintenance in Water Pumps for A/C & Other Installations in Hong Kong International Airport | Electrical and Mechanical Services Department | Sep 2015-May 2016 |
Improvement Works on the Air-conditioning System at Hong Kong Heritage Museum, Sha Tin | Electrical and Mechanical Services Department | Sep 2015-Mar 2016 |
Provision of Engineering Services for E&M Installation at Cape Collinson Cematorium and Columbarium | Electrical and Mechanical Services Department | Sep 2015 -Dec 2015 |
Repair for Chiller and AHU at Caribbean Square | Citybase Property Management Limited | Sep 2015 -Nov 2015 |
Supply labour and materials to install Mid Autumn Festival Lighitngs | South Horizons Management Ltd | Aug 2015 -Oct 2015 |
Replacement of Building Services Pipework and Chilled Water Pipes | Hong Kong Baptist University | Aug 2015 -Dec 2015 |
Proposed A&A Works at 3rd Floor Tropicana Garden | Tropicana Garden | Aug 2015 -Nov 2015 |
Internal and External Refurbishment of Kowloon City Road Public Toilet | Architectural Services Department | Aug 2015 -Nov 2015 |
Upgrading Existing Electrical Distribution System at Staff Quarters, Shatin Racecourse | The Hong Kong Jockey Club | Aug 2015 -On Progress |
Provide Two Year Maintenance Service of Air-conditioning & Hot Water Supply System | Whampoa Property Management Limited | Aug 2015 -Jul 2017 |
Replacement of Cooling Towers at East Wing of Hong Kong Police Headquarters | Electrical and Mechanical Services Department | Aug 2015 -Mar 2016 |
Plunbing and Drainage Works at 555 Nathan Road | Centtury Nice Development Limited | May 2015-Jun 2016 |
Provision of Engineering Services for E&M Installation and other Services at Wo Hop Shek Crematorium and Columbarium | Electrical and Mechanical Services Department | Aug 2015 -Dec 2015 |
E&M Installation for Kwun Tong Government Primary School | Kwun Tong Government Primary School | Aug 2015-Nov 2015 |
Building Services Repairs & Maintenance Term Contract 2015-2018 | The Hong Kong Polytechnic University | Jul 2015-On Progress |
E&M Works for Sixty Eight at Granville | Sixty Eight | Jul 2015-Jan 2015 |
12-Month Contract for Operation and Maintenance of Electrical, Mechanical and Air-conditioning Systems at Yung Fung Shee Memorial Centre and Pamela Youde Polyclinic | Electrical and Mechanical Services Department | Jul 2015-Jul 2016 |
Refurbishment of Disable Toilet at City U | City University of Hong Kong | Jul 2015- Sep 2015 |
Supply and Replacement of Energy-Saving Split Type AC Units at Park Avenue and Central Park | MTR Corporation Limited | Jul 2015- Nov 2015 |
24 Months of Air Conditioning System Maintenance Services Contract for Residential & Clubhouse | Citybase Property Management Limited | Jul 2015- Jun 2017 |
中華大廈冷氣及通風系統保養服務合約 | Synergis Management Services Limited | Jul 2015- Apr 2017 |
E&M Installation of Solar Power Generating System at R/F of Hostel 4 and 5 at Lee Woo Sing College | The Chinese University of Hong Kong | Jul 2015- Dec 2015 |
Replacement of The Chiller Plant no. 1 Including All Piping and Wiring Works is Approved by The ARA Asset Managment (Fortime) Limited as 2014 CAPEX Works | Hutchison Whampoa Property Limited | Jun 2015- Jul 2015 |
Refurbishment of Public Toilet at Kowloon City Complex | Architectural Services Department | Jun 2015-Nov 2015 |
Home Shanghai at Yoho Midtown | Home Shanghai | Jun 2015-Oct 2015 |
Chemical Cleaning for the Air-Conditioning Units in Shatin Senior Staff Quarter | The Hong Kong Jockey Club | Jun 2015- On Progress |
6 Month Term Contract for the Maintenance of Electrical, Mechanical, Air-conditioning and Laundary Equipment at Butterfly Beach Laundry | Electrical and Mechanical Services Department | Jun 2015- Dec 2015 |
Plumbing & Drainage Installation for Tung Hei Road Phase 2 | Leisure and Cultural Serivces Department | Jun 2015- Oct 2015 |
E&M Installation for Choi Hung Bus Terminus Public Toilet | Architectural Services Department | Jun 2015- Jan 2016 |
Renovation of the Existing Library of The Hong Kong Academy for Performing Arts | The Hong Kong Academy for Performing Arts | Jun 2015- Dec 2015 |
Lighting Improvement Work in Compact Shelf Area 4-7F. Au Shue Hung Memorial Library Building | Hong Kong Baptist University | Jun 2015- Aug 2015 |
A&A Works at Sunshine City (Western Portion) Ma On Shan | Heng Tat Construction Co. Ltd. | May 2015-Aug 2015 |
E&M Installation for Office at Laws Commerical Plaza | Laws Commerical Plaza | May 2015-Jun 2015 |
Overhauling Works for Chiller No.2 at The Meropolis Tower | ARA Asset Management (Prosperity) Limited | May 2015-Nov 2015 |
Design and Build of Office at To Yuen Building and Cheng Yick-Chi Building | City University of Hong Kong | May 2015-Nov 2015 |
E&M Installation for West Kowloon Cultural District | West Kowloon Culrural District | May 2015-Nov 2015 |
MVAC Installation for Renovation at Lamma Supplies Building 1/F-3/F | The Hongkong Electric Co., Ltd. | May 2015-Jun 2016 |
Provision of A/C and Mechanical Mainteanance Services at Tin Shui Wai Community Health Centre | Electrical and Mechanical Services Department | May 2015-Apr 2016 |
Provision of Engineering Services for E&M Installation and other Services at Wo Hop Shek Crematorium and Columbarium | Electrical and Mechanical Services Department | May 2015-Jul 2015 |
Provision of Electrical Maintenance Services at Catle Peak Hospital | Electrical and Mechanical Services Department | Apr 2015 -Apr 2016 |
HVAC Nominated Sub-Contract Proposed Residential Development at Nos 1 to 11 Tang Fung Street Aberdeen | Top Sail International Limited | Apr 2015 -Feb 2017 |
Provision of Engineering Services for E&M Installation at Cape Collinson Cematorium and Columbarium | Electrical and Mechanical Services Department | Apr 2015 -Aug 2015 |
Prevision of Engineering Services for E&M Installation and other Services at Kwai Chung Crematorium and Columbarium | Electrical and Mechanical Services Department | Apr 2015-Aug 2015 |
Renovation Work at 1/F Chen Kou Bun Building of CUHK | The Chinese University of Hong Kong | Apr 2015-Aug 2015 |
Supply and Installation of a Compressor for Air-conditioning Package Unit 2 at Chuk Yuen Sports Centre | Electrical and Mechanical Services Department | Mar 2015 -Apr 2015 |
Refurbishment of Potable Water Supply System of Tai Lung AFCD Farm | Tai Lung AFCD Farm | Mar 2015 -Jul 2015 |
海逸豪園 – 第 16、 20 及 21 座 L1 層入口大堂及第 23 及 23A 座 L1 層升降機大堂更換分體式冷氣機工程 | Goodwell Property Management Limited | Mar 2015 -Sep 2015 |
Proposed Power Upgrading Works at Tropicana Garden | Tropicana Garden | Feb 2015 -Dec 2015 |
5-Month Contract for Operation & Maintenance of Electrical, Mechanical and Air-conditioning Systems at Yung Fung Shee Memorial Centre & Pamela Youde Polyclinic | Electrical and Mechanical Services Department | Feb 2015 -Jul 2015 |
Provision of Conduit and Cable for Lift | City University of Hong Kong | Feb 2015-Nov 2015 |
Provision of Engineering Works for Supporting Engineering and Maintenance Services Under MunCS | Electrical and Mechanical Services Department | Feb 2015 -Jan 2016 |
St Peter Village Garden In Sai Kung | Leisure and Cultural Serivces Department | Feb 2015 -Jun 2015 |
Provision of Maintenance Services for Electrical, Mechanical and Air-conditioning Installations and Hospital Equipment a Siu Lam Hospital | Electrical and Mechanical Services Department | Jan 2015-Dec 2015 |
Replacement Works for Cold Water Tank and Flushing Water Tank at Enterprise Place (5W) and Green 18 (18E) in Hong Kong Science Park | Urban Property Management Limited | Jan 2015-May 2015 |
Wash & Clean AC System of Various Kitchens, Grandstand 1 & 2, Shatin Racecourse | The Hong Kong Jockey Club | Jan 2015- Mar 2015 |
Electrical Installation at Morse Park | Leisure and Cultural Serivces Department | Jan 2015- On Progress |
Provsion of Maintenance Services for Fire Dampers and Miscellaneous Equipment at Pok Oi Hospital | Electrical and Mechanical Services Department | Jan 2015- Dec 2016 |
Annual Contract for Comprehensive Operation and Maintenance Contract of Air-conditioning Installations at Ko Shan Theatre New Wing | Electrical and Mechanical Services Department | Jan 2015- Dec 2015 |
Provison of Mechanical Maintenance Services at Castle Peak Hospital | Electrical and Mechanical Services Department | Jan 2015- Dec 2015 |
Periodic Inspection, Testing and Certification WR-2 of Fixed Electrical Installation for The Chinese University of Hong Kong | The Chinese University of Hong Kong | Jan 2015- Dec 2015 |
Improvement of Mechanical Ventilation System at Fo Tan Cooked Food Markets | Electrical and Mechanical Services Department | Dec 2014 -Mar 2015 |
E&M Instalation of Shop Sixty Eight at Tsuwn Wan Plaza | Sixty Eight | Dec 2014 -Feb 2015 |
Retrofit of Park Facilities and Miscellaneous Improvement Works at Wa Shun Street SOA Kowloon City | Architectural Services Department | Dec 2014 -Jun 2015 |
Fire Services Installation at Big Wave Bay Shek O | Architectural Services Department | Dec 2014 -Apr 2015 |
E&M Instalation of Shop Sixty Eight at Landmark North | Sixty Eight | Dec 2014 -Jan 2015 |
Rehabilitation of HKYWCA Kowloon | YWCA | Dec 2014 -Aug 2016 |
Enhancement of Power at North Regional Headquarter | Architectural Services Department | Dec 2014 -Dec 2015 |
MVAC Installation at No 6 Tsun Wen Road Tuen Mun | Luk’s Industrial Company Limited. | Dec 2014-Nov 2017 |
Improvement Works on the Air-conditioning System for Municipal Venues in Hong Hom, Sham Shui Po, Wong Tai Sin and Yau Tsim Mong | Electrical and Mechanical Services Department | Nov 2014-Mar 2016 |
更換第二號冷凍機B2壓縮機及控制器一套 | Citytruth Property Management Limited | Nov 2014 -Feb 2015 |
Replacement of VRV Units with All Necessary Accessories at Lam Tin Ambulance Depot | Electrical and Mechanical Services Department | Nov 2014 -Dec 2015 |
4-Month Contract for Operation and Maintenance of Electrical, Mechanical and Air-conditioning Systems at Yung Fung Shee Memorial Centre and Pamela Youde Polyclinic | Electrical and Mechanical Services Department | Nov 2014 -Feb 2015 |
Provision of operation and maintenance of electronic works for AC systems in Hong Kong international Airport | Electrical and Mechanical Services Department | Nov 2014-Mar 2016 |
Provision of Maintenance Support Team for Terminal 1 in Hong Kong International Airport | Electrical and Mechanical Services Department | Nov 2014-May 2016 |
MVAC Installation at No 8 Chung Fai Terrace, Tai Hang Road | The Signature | Nov 2014 -Nov 2014 |
Electrical and ELV Installation for Proposed A&A Works for Wholesale Conversion of Industrial Building to Office at 8 Wang Kwong Road, Kowloon Bay, Kowloon, Hong Kong | Henderson Land Development Company Limited | Oct 2014-Dec 2015 |
Design and Replace the Existing MVAC System Monitoring Control Panel for Future Monitoring the new Chiller Plant Circuit and The FCUs in Line with Mall Renovation Work | Cayley Property Management Ltd. | Sep 2014-Feb 2015 |
保良局顏寶鈴書院更換及加裝冷氣工程 | Po Leung Kuk | Sep 2014-Oct 2014 |
E&M Installation for Shop Sixty Eight at Mikiki Mall G26-G27 | Sixty Eight | Sep 2014 -Nov 2014 |
5-Month Contract for Operation and Maintenance of Electrical, Mechanical and Air-conditioning Systems at Yung Fung Shee Memorial Centre and Pamela Youde Polyclinic | Electrical and Mechanical Services Department | Sep 2014 -Feb 2015 |
MVAC Installation for Joseph Lee Primary School at 9 Tin Fai Road Tin Shui Wai | Joseph Lee Primary School | Sep 2014 -Aug 2016 |
Supply Labour and Material to Install Mid-Autumn Festival Lightings | South Horizons Management Ltd | Aug 2014-Oct 2014 |
Clable Containment Installation for English Schools Foundation South Island School | English School Foundation | Aug 2014 -Nov 2014 |
Provison of maintenace services for air conditioning electrical mechanical installations and water filteration system at Lam Tin Complex | Electrical and Mechanical Services Department | Aug 2014 -Feb 2015 |
Maintenance Services of Electrical Installation for Civil Aviation Department Headquarters, On-airport and Off-airport Venues for Civil Aviation Department | Electrical and Mechanical Services Department | Aug 2014 -Apr 2015 |
Aberdeen Chinese Permanent Cemetery | The Board of Management of The Chinese Permanent Cemeteries | Aug 2014 -Jan 2016 |
Lighting Retrofit in Grandstand 1 & 2 and Parade Ring, STRC | Hong Kong Jocky Club | Aug 2014-May 2015 |
E & M Installation at Café 187 TPTL Tai Po | Sino Group | Aug 2014 -Sep 2014 |
Electrical Installation – Proposed Residential Development at Nos. 7-9, Ying Wa Terrace | Henderson Land Development Company Limited | Jul 2014-Mar 2016 |
Light Installation for No 313 Prince Edward West | Paxton | Jul 2014-May 2014 |
Operational Services for Sea Water Pump House at The Metropolis for The Period from 08 July 2014 to 07 July 2016 | Citybase Property Management Limited | Jul 2014-Jul 2016 |
Replacement of Deteriorated Air Handling Units and Associated Accessories for the Laboratories at Cha Chi-ming Science Tower, Ho Sin Hang Campus | Hong Kong Baptist University | Jul 2014-Oct 2015 |
Electrical nstallation for Po Leung Kuk Luk Hing Too Primary School | Po Leung Kuk | Jun 2014- Oct 2015 |
E&M Installation at Café’ at TPTL 187 Tai Po (Providence Bay) |
Sino Group | Jun 2014- Feb 2014 |
MVAC Replacement for English Schools Foundation South Island School at 50 Nan Fung Road, Aberdeen | English School Foundation | Jun 2014-Nov 2014 |
South Island School, 50 Nam Fung Rd, Aberdeen, Hong Kong | English School Foundation | Jun 2014-Apr 2015 |
Term Contract for Minor Electrical Works at Various Locations of the CUHK for one year from 16 June 2014 to 30 June 2015 (Tender No. EMO-140505) | The Chinese University of Hong Kong | Jun 2014-Oct 2015 |
Replacement of VRV units cw All Necessary Accessories at Stanley Prison | Electrical and Mechanical Services Department | May 2014-Mar 2015 |
G/F Shop at 1L-1M, Sai Yeung Choi Street, Mongkok, Kln | Chow Tai Fook | May 2014-Jun 2014 |
Electrical Work for Fire Service Upgrading Works to Building Blocks of Police Driving and Traffic Training Division | Hong Kong Police Force | May 2014-Sep 2016 |
180-Refurbishment to Hong Keung Street Public Toilet, Wong Tai Sin, Kowloon | Architectural Services Department | May 2014-Aug 2015 |
Provision of Daily Operation, Repairs and Maintenance Services to Mechanical Installation | The Hong Kong Polytechnic University | May 2014-Mar 2016 |
Provision of Electrical Maintenance Services at Butterfly Beach Laundry | Electrical and Mechanical Services Department | May 2014-Apr 2015 |
Operation and Maintenance Works for On-airport and Off-airport Venues for Civil Aviation Department | Electrical and Mechanical Services Department | May 2014-Aug 2014 |
Improvement of Airducts at Basement of Hong Kong Cultural Centre | Electrical and Mechanical Services Department | May 2014-Jul 2014 |
E & M Installation at Tong Shui Road Toilet | Architectural Services Department | Apr 2014 -Jan 2015 |
E & M Installation at Shop 126 to 127 Olympian City 2 | Sino Estates Management Limited | Apr 2014 -Sep 2015 |
Maintenance of Air Conditioning Plant Services Contract (Period from 1 Apr 2014 to 30 Sep 2016) | Citybase Property Management Limited | Apr 2014 -Sep 2016 |
Provide Labou and Materials to Carry Out Routine Maintenance Works for HVAC System (Air Side Equipment) for 2-years | Hutchison Logistics Centre | Apr 2014-Mar 2016 |
Electrical Installation at Fu Hong Street Sitting Out Area | Architectural Services Department | Apr 2014-Nov 2015 |
Operation and Maintenace Services for Kwai Chung Crematorium | Electrical and Mechanical Services Department | Apr 2014-Mar 2015 |
Operation and Maintenace Services for Fu Shan Crematorium | Electrical and Mechanical Services Department | Apr 2014 -Mar 2015 |
Provision of Maintenance Services for Fire Dampers and Mincellaneous Equipment at Pok Oi Hospital | Electrical and Mechanical Services Department | Apr 2014 -Mar 2015 |
Replacement fo The Damaged 500mm dia. Discharge Pipe Work Fittings for The Sea Water Pump Set no. 1-3 at Sea Water Pump House of City Garden | Cayley Property Management Ltd. | Apr 2014 -Oct 2014 |
置富都會-新造L7及L8緊急電源線路工程 | Cheung Kong (Holdings) Limited | Apr 2014 -Jun 2014 |
E&M Work at 313 prince road | Paxton | Apr 2014 -Apr 2014 |
E&M Installation at Tuen Mun Law Courts Building | Architectural Services Department | Mar 2014-Mar 2015 |
Light Installation for Seahorse at Ocean Park | Ocean Park | Mar 2014 -Mar 2014 |
Supply and installation of Audiology Examination Syite for Alice Ho Miu Ling Nethersole Hospital | Hospital Authoity | Mar 2014 -May 2015 |
P&D, Electical, MVAC & Chiller Plant Installation The Hong Kong Polytechnic University Alteration and Addition Works at W7/F |
The Hong Kong Polytechnic University | Mar 2014 -Jun 2015 |
Waterfront Installation of Acoustic Panel and Silencers | Ocean Park | Mar 2014 -Jun 2015 |
Operation and Maintenance of Electrical and Mechanical Installations at Wo Hop Shek Crematorium and Columbarium | Electrical and Mechanical Services Department | Feb 2014 -Apr 2014 |
Provision of Mechanical Maintenance Services at Castle Peak Hospital Service Provided by Resident Maintenance Team Mechanical Technician II on January-14 and February-14 (Mr, Cheung Ying-lung, Mr. Ho Wai-ki and Mr. Lai Kwok-fei) | Electrical and Mechanical Services Department | Feb 2014 -Apr 2014 |
Improvement of MVAC System at NMR Room at City University of Hong Kong | City University of Hong Kong | Feb 2014 -Jul 2014 |
Provision of Maintenance Services for Electrical Mechanical and Air-conditioning Installations and Hospital Equipment at Siu Lam Hospital | Electrical and Mechanical Services Department | Jan 2014 -Jan 2015 |
Maintenance of Air Conditioning System for Caribbean Square | Citybase Property Management Limited | Jan 2014 -Jan 2016 |
Electrical, Mechanical Ventilation & Frie Services of Enabling Works for Renovation at Tsing Yi Commercial Complex | The Link Management Limited | Jan 2014 -Jul 2014 |
Replacement of Thermal Insulation for Chilled Water Pipes at Pei Ho Street Municipal Services Building | Electrical and Mechanical Services Department | Jan 2014 -Apr 2014 |
Maintenance Services of Air Conditioning Plant & Mechanical Ventilation System at Monte Vista | Citybase Property Management Limited | Jan 2014 -Dec 2015 |
Pumping Installation and Miscellaneous Mechanical Equipment Maintenance Services at Unattended Venues at New Territories West Cluster | Electrical and Mechanical Services Department | Jan 2014 -Feb 2015 |
Provision of Mechancical Maintenace Services at Castle Peak Hospital | Electrical and Mechanical Services Department | Jan 2014 -Dec 2014 |
Provision of Engineering and maintenace service for crematoriums | Electrical and Mechanical Services Department | Jan 2014 -Dec 2014 |
Replacement of Fluorescent Lighting Fittings at Control Rooms and Computer Rooms of Tsing Ma Control Area and Three Covernment Tunnels | Electrical and Mechanical Services Department | Dec 2013 -Mar 2014 |
The Salvation Army Headquarters and Booth Lodge at No. 11, Wing Sing Lane, Yaumatei, Kln. | The Salvation Army | Dec 2013 -Aug 2014 |
E&M Installation at Shing Mun Valley Swimming Pool | Leisure and Cultural Serivces Department | Dec 2013 -Jan 2016 |
E&M Installation at Level 1 amd Room 201 Academic and Administration Building HKBU | Hong Kong Baptist University | Dec 2013 -Sep 2014 |
Replacement of Thermal Insulation for Chilled Water Pipes at Pei Ho Street Municipal Services Building | Electrical and Mechanical Services Department | Nov 2013 -Jun 2014 |
Supply and installation of electrical and water check meter for cost allocaion | Sino Estates Management Limited | Nov 2013 -Jun 2015 |
Electrical Installation of the Proposed Addition & Aleration at Citimall, Y.L.T.L. 464, Yuen Long, New Territories | Henderson Land Development Company Limited | Nov 2013-On Progress |
Electrical Installation for Addition and Alternation Works at Metro City Plaza, II, Tseung Kwan O, TKOTL27, Phase 3 | Henderson Land Development Company Limited | Nov 2013 -Dec 2015 |
E&M Work at Mei Lam Estate | The Link Management Limited | Nov 2013-Nov 2014 |
Replacement of Fluorescent Lighting Fittings at Control Rooms and Computer Rooms of Tsing Ma Control Area and Three Covernment Tunnels | Electrical and Mechanical Services Department | Nov 2013 -Mar 2014 |
Interior Fit-out Works for Café’ at Tai Po TPTL 187 | Sino Group | Nov 2013 -Dec 2013 |
Refurbishment of Sheung Yuen Street Public Toilet | Architectural Services Department | Oct 2013- Oct 2014 |
鹿茵山莊 -會所大修冷凍機1號及2號壓縮機工程 | Goodwell Property Management Limited | Oct 2013 -Sep 2015 |
DeerHill Bay 4699 Tai Po Road, Cheung Shu Tan, Tai Po, N.T. |
Goodwell Property Management Limited | Oct 2013 -Sep 2015 |
E&M Installation at Mei Tin Estate | Tung Wah Group of Hospitals | Oct 2013- May 2014 |
E&M Installation at G/F and 1/F Kingswood Ginza, Phase 2 Tin Shui Wai | Cheung Kong Property Development Ltd. | Oct 2013 -May 2014 |
Seafront near Seawater Intake Chamber, Phase II, South Horizons | South Horizons Management Ltd | Oct 2013 -Apr 2014 |
Po Leung Kuk YCC Centre | Po Leung Kuk | Oct 2013 -Dec 2013 |
Yau Oi Estate Temporary Site Office | The Link Management Limited | Oct 2013- Nov 2013 |
Proposed for the Commercial Development at 1L-1M Sai Yeung Choi Street South, Mongkok | Times Investment Limited | Sep 2013-Mar 2014 |
40-Month Maintenance Services for Air-conditioning Units at Airfield in Hong Kong International Airport | Electrical and Mechanical Services Department | Sep 2013 -On Progress |
Main Contract for the Renovation Works at Yau Oi Shopping Centre (Phase 3 – Yau Oi Shopping Centre) | The Link Management Limited | Sep 2013 -Sep 2015 |
Supply and Installation of one Section of Seawater Cooling Mains at Hong Kong Cultural Centre | Electrical and Mechanical Services Department | Sep 2013 -Feb 2015 |
HI172-HKJEBN-Improvement Works at 3/F., Tropicana Garden-switchboard Replacement | Hsin Chong Construction Group Limited | Sep 2013 -Aug 2014 |
HI172-HKJEBN-Improvement Works at 3/F., Tropicana Garden-MVAC installation | Hsin Chong Construction Group Limited | Sep 2013 -Aug 2014 |
Replacement of Water Scrubber System at Cheung Tung Road Refuse Collection Point Tung Chung | Electrical and Mechanical Services Department | Sep 2013 -Jun 2014 |
Subcontract Works for Replacement of Chiller Plants and Air Handling Units for Belvedere Square 3, Tsuen Wan (Contract No 54/13) | ARA Asset Management (Prosperity) Limited | Sep 2013 -Feb 2014 |
Installation at 8/F Royal Plaza Hotel | Royal Plaza Hotel | Sep 2013-Oct 2013 |
Replacement Works for Chillers for AIA Central (Connaught Road Central Hong Kong) | ISS EastPoint Property Management Ltd. | Aug 2013-Nov 2013 |
Celestial Garden Whole Building Renovation | Jones Lang LaSalle | Aug 2013 -Dec 2014 |
E&M Works for Caritas Lok Hang Workshop and Lok Chung Hostel | Caritas Hong Kong | Aug 2013 -Dec 2014 |
IAQ Improvement Works for Un Chau Street Public Library | Electrical and Mechanical Services Department | Aug 2013 -Dec 2013 |
WR2 defects rectification work at Management Office, Wisdom Court, 5 Hatton Road, Hong Kong | Jones Lang LaSalle | Aug 2013 -Dec 2013 |
Renovation of Ground Floor Lobby at St. John’s Building | St. John’s Building | Aug 2013-Nov 2013 |
Letter of Intent For “提供人手、工具及一切所需之物料更換分體式室外冷氣機內之壓縮機、微喉及雪種filter連有關配件,共十五部,現時分體式冷氣機資 | Goodwell Property Management Limited | Aug 2013 -Nov 2013 |
Nob Hill 8 King Lai Path, Kwai Chung, NT |
Citybase Property Management Limited | Jul 2013-Jun 2015 |
Home Care Centre for girls at 1/F Ching Kwai House Cheung Tsing Estate | Home Affairs Department | Jul 2013-Oct 2013 |
HKJC -Replace shop front floodlight by LED (various branches) | The Hong Kong Jockey Club | Jul 2013-Sep 2013 |
Ling Ying Public School-Supply temporary power for Building B Construction | Architectural Services Department | Jul 2013-Sep 2013 |
2-Year Maintenance Services for Chiller Plants | City University of Hong Kong | Jun 2013 -May 2015 |
Renovation Works for Prining Room (OEM503 to OEM506) at Hong Kong Bapist University | Hong Kong Baptist University | Jun 2013 -Nov 2013 |
Fitting-out Works to YMCA Shek Kip Mei | YMCA | Jun 2013 -Oct 2013 |
E&M Installation Renovation Works for Chinese YMCA of Hong Kong Tin Ping Neighborhood Elderly Centre at Unit 116, 117 & 119, G/F., Tin Ming House, Tin Ping Estate, Sheung Shui, N.T. | YMCA | Jun 2013 -Oct 2013 |
Renaissance College, No. 2 Hang Ming Street, Area 90B, Ma On Shan, Shatin, Lot No. 522 | English School Foundation | Jun 2013- Oct 2013 |
Shop Re layout at Level 3 at China Hong Kong City | Sino Group | Jun 2013 -Sep 2013 |
Japanese & Vietnamese Restaurant – 4/F Lee Garden II | 1957 & Co. | Jun 2013 -Aug 2013 |
Electrical works at Repuelse Bay Garden | Repulse Bay Garden | May 2013-Dec 2014 |
Provision of Statutory Inspection of Fixed Electrical Installations at Block C of The Open University of Hong Kong | The Open University of Hong Kong | May 2013-Dec 2013 |
Replacement of Fill Packs for The Cooling Towers of Air-conditioning Plant for Library Building and Phase 7 Building (1034378) | The Hong Kong Polytechnic University | May 2013-Sep 2013 |
Bone Ash Handling Works for Cremators at Fu Shan Crematorium and Kwai Chung Crematorium | Electrical and Mechanical Services Department | Apr 2013 -Jan 2014 |
Comprehensive Operation and Maintenance Works for On-airport and Off-airport Buildings | Electrical and Mechanical Services Department | Apr 2013 -Jun 2014 |
Fitting out Work Installation for Residential Development at 15-16 Wang Fung Terrace , HK | Pacific King Development Ltd. | Apr 2013 -Jan 2014 |
E&M Installation at Temporary Container works at Quarry Bay School | English School Foundation | Apr 2013 -May 2013 |
Installation of an External lift for the Youth Square in Chai Wan | Architectural Services Department | Mar 2013 -Aug 2014 |
Cleaning of Air-Conditioners 2013 For St. Paul’s College at No. 69 Bonham Road, Hong Kong | St. Paul’s College | Mar 2013 -Aug 2013 |
Dah Sing Bank – 13 Branches | Dah Sing Bank | Mar 2013 -Aug 2013 |
HKEAA Tai Hing Estate Centre, Tai Hing Estate, Phase 1, Tuen Mun | Hong Kong Examinations and Assessment Authority | Mar 2013 -Apr 2013 |
24-month Term Contract for Maintenance Works at MacLehose Medical Rehabilitation Centre, Fung Yiu King Hospital and Duchess of Kent Children’s Hospital | Electrical and Mechanical Services Department | Feb 2013 -Jan 2016 |
Operation and Maintenance of Cremators and Other Engineering Installations at Cape Collinson Crematorium and Columbarium | Electrical and Mechanical Services Department | Feb 2013 -Jan 2014 |
(1520EM12M) Improvement Works for the Greenhouse at Jordan Valley Park | Electrical and Mechanical Services Department | Feb 2013 -Dec 2013 |
Management Office 5 Hatton Road, Hong Kong | Jones Lang LaSalle | Feb 2013 -Dec 2013 |
Provision for electrical maintenance works carried out in municipal venues of Hong Kong Region | Electrical and Mechanical Services Department | Jan 2013-Feb 2014 |
Operation and Maintenance of Electrical and Mechanical Installations at Wo Hop Shek Crematorium and Columbarium | Electrical and Mechanical Services Department | Jan 2013-Feb 2014 |
(1745EM12M) Replacement of Air Conditioning Equipment at Queen Elizabeth Stadium, Hong Kong Stadium and Hong Kong Film Archive | Electrical and Mechanical Services Department | Jan 2013-Nov 2013 |
Supply & Installation of T5 Lighting Fixtures for Siu Kwai Court at Tuen Mun | Hon Yip Services Company Limited | Jan 2013-Sep 2013 |
Replacement of Compresses for Air-conditioning System International Funeral Parlour | Tung Wah Group of Hospitals | Jan 2013-Apr 2013 |
E & M Installation at Hip Cellar Roof Cooling Tower Installation | Hip Cellar Limited | Jan 2013-Apr 2013 |
E & M Installation at Hip Cellar 5/F | Hip Cellar Limited | Jan 2013-Apr 2013 |
A&A Works of Commercial Building on I.L.s 7311-7314 at Gluocester Road and O’brien Road, Hong Kong | Sun Properties Company Limited | Dec 2012 -Jan 2016 |
Chiller Plant B, West Commercial Block, South Horizons | South Horizons Management Ltd | Dec 2012 -May 2014 |
Electrical Installation at Tin Hau Temple Road Park | Architectural Services Department | Dec 2012 -Dec 2013 |
Electrical and ACMV Installation for Quarry Bay Market | Architectural Services Department | Dec 2012 -Oct 2013 |
Builder / M&M system installation work for 3/F PABX equipment room | Island Pacific Hotel | Dec 2012 -Oct 2013 |
Electrical Installation for Workers Children Secondary School | Architectural Services Department | Dec 2012 -Oct 2013 |
Phase I to IV Residential Towers, Clubhouse and Sports Complex, South Horizons | South Horizons Management Ltd | Dec 2012 -May 2013 |
Electrical and MVAC Installation at SV1 and SV2 Electronic Area at East Hall HKIA | Nuance Watson | Dec 2012 -Jan 2013 |
Improvement Works to Play Area TWGHs Wong Chu Wai Fun Kindergarten | Tung Wah Group of Hospitals | Dec 2012 -Jan 2013 |
Provision of Inspection and Maintenance Service for Ventilation Systems of United Christian Hospital, Kowloon East Cluster, Hospital Authority | United Christian Hospital | Nov 2012 -Nov 2015 |
Fitting Out Works to Residential Showflat and Sales Centre at Basement of Bank of America Tower | Couture Homes | Nov 2012 -Aug 2013 |
Operation and Maintenance of Heating, Ventilation and Air-Conditioning Installations at Tuen Mun Town Hall, Tsuen Wan Town Hall and Hong Kong Heritage Museum | Electrical and Mechanical Services Department | Nov 2012 -Aug 2013 |
Defects Rectification Works of Low Voltage Installations at Shan Tsui Court, 200 Tai Tam Road, Chai Wan, Hong Kong | ISS EastPoint Property Management Ltd. | Nov 2012 -Jun 2013 |
MVAC Installation For St. Paul’s College Primary School at 777 Victoria Road, Hong Kong | St. Paul’s College | Nov 2012 -Jan 2013 |
(IT12/055HN) Design, Supply and Installation of power socket outlets on the benches of lecture theaters in academic 2 | City University of Hong Kong | Nov 2012 -Jan 2013 |
HK/2009/02 CWPS – Ductwork installation | Water Supplies Department | Nov 2012-Nov 2012 |
Jockey Club New Hall at Tuen Mun T.M.T.L. No.376 for Lingnan University | Lingnan University | Oct 2012 -Dec 2013 |
Kornhill Gardens (PSPS) Mgt. Office G/F., Block 5 Kornhill Gardens, Quarry Bay, Hong Kong | MTR Corporation Limited | Oct 2012 -Jun 2013 |
Fan Coil unit for Staff Canteen | Hong Kong Gold Coast Hotel | Oct 2012 -Jan 2013 |
Mango Tree at Shop 2032-2033, The Elements | 1957 & Co. | Oct 2012 -Jan 2013 |
Replacement of Return Air Fan for Variable Air Volume Air Volume Air Handing Unit no. 1 and Associated Accessories in the Prince Philip Dental Hospital as per quotation no. 1213EM12M | Electrical and Mechanical Services Department | Sep 2012 -Apr 2013 |
IT12/026SE City U | City University of Hong Kong | Sep 2012 -Dec 2012 |
Supply and Installation of electrical installations for ventilation systems at Tiu Keng Leng, Tseung Kwan O, Wu Kai Sha Station Public Transport Interchange | Electrical and Mechanical Services Department | Aug 2012-Nov 2012 |
Supply and Return chiller water pipe at Laguna Verde | Goodwell Property Management Limited | Aug 2012 -Oct 2012 |
(1194EM12S) 18-month Term Contract for Maintenance of Electrical, Mechanical, and Air-conditioning Installations and Hospital Equipment at Siu Lam Hospital | Electrical and Mechanical Services Department | Jul 2012-Feb 2014 |
Fanling Rhenish Church Secondary School Library | Fanling Rhenish Church Secondary School | Jul 2012-Oct 2013 |
(1163EM12M) Improvement works on the Air-conditioning System at Ap Lei Chau Municipal Services Building, Ap Lei Chau, Hong Kong | Electrical and Mechanical Services Department | Jul 2012-May 2013 |
E&M Quotation Kwai Hing Public Toilet | Architectural Services Department | Jul 2012-Jan 2013 |
E&M Installation at Kowloon Shangri-LA Hotel Kowloon Room | Shangri-LA Hotel | Jul 2012-Sep 2012 |
Po Leung Kuk Shek Kip Mei Small Group Home | Po Leung Kuk | Jul 2012-Aug 2012 |
E&M Work Staff Resturant at Repulse Bay | The Hong Kong and Shanghai Hotels Limited | Jul 2012-Aug 2012 |
E&M Installation at Proposed Food Factory at TIK 12-13 Tiu Keng Leng Station | Sushi Take-Out | Jul 2012-Aug 2012 |
E&M Installation at Kowloon Shangri-LA Hotel | Shangri-LA Hotel | Jul 2012-Aug 2012 |
Lighting Installation at Kai Tak CLP Temporary Transformer Room | CLP Power Hong Kong Limited | Jul 2012-Aug 2012 |
24-Month Contract for Operation and Maintenance of Electrical Mechanical and Air-conditioning Systems at Yung Fung Shee Memorial Centre and Pamela Youde Polylinic | Electrical and Mechanical Services Department | Jun 2012- May 2014 |
Repair & Maintenance 3 years Contract for Air Conditioning System for Discovery Park, No. 398 Castle Peak Road Tsuen Wan, N.T. | Wells Estate Services Ltd. | Jun 2012 -Aug 2013 |
(1428EM12M) Replacement of Pipe Insulation for Air Conditioning System at Tsuen Wan Government Office | Electrical and Mechanical Services Department | Jun 2012 -Jun 2013 |
Wai Hang Sports Centre to Connect to Ho Sin Hang Campus and Shaw Campus | Hong Kong Baptist University | Jun 2012 -Mar 2013 |
E&M Installation at G/F Kingswood Ginza, Phase 2 Tin Shui Wai | Sino Group | Jun 2012 -Jan 2013 |
MVAC and PD Work Staff Restaurant Kitchen at Repulse Bay | Repulse Bay Hotel | Jun 2012 -Jul 2012 |
Term Contract-Building Services Repairs and Maintenance Term Contract 2012/2015 The Hong Kong Polytechnic University | The Hong Kong Polytechnic University | May 2012-May 2015 |
Phase 1 Main Contract for Redevelopment of St. Francis’ Canossian College at 9-13 Kennedy Road, Wanchai,Hong Kong | St. Francis’ Canossian College | May 2012-Jul 2014 |
(1012EM12M) Replacement of HVAC Systems and Equipment at Television House | Electrical and Mechanical Services Department | May 2012-Dec 2013 |
Main Contract for the Renovation Works at Yiu On Shopping Centre Shatin | The Link Management Limited | May 2012-May 2013 |
Electrical and MVAC Installation at Nam Shan Estate Carpark | City University of Hong Kong | May 2012-Sep 2012 |
Improvement of Flushing Water Supply System for Good Hope School | Good Hope School | May 2012-Aug 2012 |
Maintenance works for HVAC system for 2 years at Terminal 4, Kwai Chung(1/4/2012 to 31/3/2014) | Hutchison Whampoa Property Limited | Apr 2012 -Mar 2014 |
Electrical and MVAC Installation at AC2, City University of Hong Kong | City University of Hong Kong | Apr 2012 -May 2012 |
Sub-Contract No. S-11/8012D Mechanical Ventilation and Air-Conditioning Installation for Superstructure Works For LMX Maintenance Building and Associated Works | Hong Kong Electric Co. Ltd. | Mar 2012 -Dec 2013 |
Replacement of Fan Coil Units and Associated Accessories for Red Cross Blood Transfustion Service Centre | Electrical and Mechanical Services Department | Mar 2012-Nov 2012 |
E&M Installation at Royal Pacific Hotel | Royal Pacific Hotel | Mar 2012 -Jun 2012 |
Replacement of Bleed Off System, Condensation Pipes and Associated Accessories for Sea Water Cooling System at Block K, Queen Mary Hospital | Electrical and Mechanical Services Department | Feb 2012 -Apr 2013 |
Relocate the 60 HP Stable split type a/c outdoor unit TR-3, HQ B/F Carpark Zone C, Happy Valley (RFQ4146) | The Hong Kong Jockey Club | Feb 2012-Jun 2012 |
E&M Renovation of Lavatories at 9/F, 10/F, 11/F, 14/F & 24/F, Park-In Comm. Centre | Hang Lung Properties | Feb 2012 -Apr 2012 |
Maintenance Service for Air-conditioning Plant & Mechanical Ventilation System(Monte Vista) | Citybase Property Management Limited | Jan 2012 -Jun 2014 |
Siu Lam Hospital Term Contract for Maintenance of Electrical, Mechanical and Air-conditioning Installations and Hospital Equipment at Siu Lam Hospital | Electrical and Mechanical Services Department | Jan 2012 -Jul 2012 |
E&M Renovation of Wanchai Market | Social Walfare Dapertment | Dec 2011 -Jul 2013 |
Operation and Maintenance of Electrical, Mechanical and Other Installations for Specified Municipal Venues in Kowloon | Electrical and Mechanical Services Department | Dec 2011-May 2013 |
Upgrading Work of Automatic Fire Alarm Installation | English School Foundation | Dec 2011 -Mar 2012 |
Lamma Power Station Extension Supply And Installation of Mechanical Ventilation and Air Conditioning System | The Hongkong Electric Co., Ltd. | Oct 2011- Mar 2012 |
Mango Tree Thai Restaurant – 5/F, 1 Hoi Ping Road | Mango Tree Thai Restauran | Oct 2011- Dec 2011 |
Building & Refurbishment Works for OCC Migratiion | MTR Corporation Limited | Sep 2011-Aug 2013 |
Electrical Installation at 25 Wang Lok Street Yuen Long Industrial Estate | Yuen Long Industrial Estate | Sep 2011-Aug 2012 |
Lung Mun Oasis | Synergis Services Management Ltd. | Sep 2011-Mar 2012 |
HKUST upgrade lab of Rm7108,1709,7110 & 7118 | Hong Kong University of Science and Technology | Aug 2011 -Dec 2011 |
Replacement of split A/C unit in AAB Store | Electrical and Mechanical Services Department | Aug 2011 -Sep 2011 |
Supply and installation of playground glass sliding doors | Tseung Kwan O Heung To Secondary School | Jul 2011-Dec 2012 |
Conversion of Service Counter on 1/F and Extension of Service Counter on 13/F at CIE Shek Mun Campus , No 8 On Muk Street , Shek Mun , Shatin | Hong Kong Baptist University | Jul 2011-Sep 2011 |
E&M Installation at Shatin Junior School | English School Foundation | Jun 2011-Aug 2012 |
Annual FMRII Works & Classroom Block Vertical Extension Works at Shatin College | English School Foundation | Jun 2011-Jun 2012 |
Addition and Alteration Works at Portion of G/F, 2/F & upper 2/F, 413 Castle Peak Road, Cheung Sha Wan | Hong Kong Housing Society | Jun 2011-Oct 2011 |
Exchange Lighting Fittings in Harbour Centre Tower 2 Public Area | Citybase Property Management Limited | Jun 2011-Oct 2011 |
The Electrical Installation, Ventilation Installation and Builder’s Works for Central Meal Portioning at 7 Numbers Subvented School in NT Areas | Electrical and Mechanical Services Department | Jun 2011-Sep 2011 |
Lighting Retrofit Works for Energy Efficiency Project In Pacific Trade Centre | Sino Estates Management Limited | Jun 2011-Jul 2011 |
Replacement of Condenser Coils at Hong Kong Film Archive | Electrical and Mechanical Services Department | May 2011-Apr 2012 |
E & M Installation for Renovation Works (Internal & External ) for Existing Hoi Bun School , Lei Yue Mun , Kln | Innovative Design Group Ltd. | May 2011-Jul 2011 |
Addition and Alteration Works at 12 Kai Chiu Road, Causeway Bay | Perfect Land Asia Limited | Mar 2011 -Jul 2011 |
E&M Reinstatement Works at Fisherman’s Wharf | Cheung Kong (Holdings) Limited | Feb 2011 -Apr 2011 |
E&M Installation Works for Aon China Building 1/F Office | Hutchison Whampoa Property Limited | Feb 2011 -Mar 2011 |
12 Months Term Contract for Maintenance of Electrical, Mechanical and Air-conditioning Installations and Hospital Equipment at Siu Lam Hospital | Electrical and Mechanical Services Department | Jan 2011 -Dec 2011 |
City Garden,233 Electric Road, North Point, Hong Kong | Cayley Property Management Ltd. | Dec 2010 -Dec 2011 |
Provison of O &M Works for Cape Collinson Crematorium and Municipal Venues under Mun/H1 Region( Period: November 2010 – April 2011) | Electrical and Mechanical Services Department | Nov 2010 -Apr 2011 |
Refurbishment fo shops and station facilities at URL/LAR stations | MTR Corporation Limited | Oct 2010 -Jul 2011 |
Dah Sing Bank-Mongkok Branch at B/F-G/F, No. 697 Nathan Road, Mongkok | Dah Sing Bank | Oct 2010- Mar 2011 |
Italian Restaurant at 11/F., 1 Hoi Ping Road, Hong Kong | Italian Restaurant | Oct 2010-Dec 2010 |
Electrical, MVAC and PD Intstallation at TMTL Jusco Store on UG/F and 1/F | Tuen Mun Town Plaza | Sep 2010-May 2011 |
Major Renovation of Stanley Plaza, Stanley, Hong Kong (Phase 1b) | The Link Management Limited | Aug 2010-Nov 2011 |
Rhine Garden Block 5-Replacement of fresh water down pipe | Synergis Services Management Ltd. | Aug 2010 -May 2011 |
Caritas Bianchi Lodge at 4 Cliff Road, Yau Ma Tei, Kowloon | Caritas Hong Kong | Aug 2010-Mar 2011 |
E & M and P & D Installation of Renovation Lavatories at Metropolis Mall | Metropolis Mall | Aug 2010 -Dec 2010 |
Fit-Out Work of Wellendorff Store at IFC Mall | Internation Finance Centre | Aug 2010 -Oct 2010 |
HKAPA-Proposed extension of 1F over carpentry workshop at theatre block | Hong Kong Academ for Performing Arts | Aug 2010 -Sep 2010 |
Renovation work at Rm 905, Sir Run Run Shaw Bldg, HSH Campus | Hong Kong Baptist University | Aug 2010 -Sep 2010 |
Replace tenant copper pipe at water meter at Richland Garden | Richland Garden Management Ltd. | Aug 2010 -Sep 2010 |
Operational Services for Sea Water Pump House | Citybase Property Management Limited | Jul 2010-Jul 2012 |
E & M Installation Work at Leighton Centre G/F and 8/F | Hysan Development Company Limited | Jul 2010-Sep 2011 |
Tuen Mun Town Plaza 209 | Sino Group | Jul 2010-Dec 2010 |
Supply and installation of T5 Fluorescent lamps at Tung Wah Group of Hospitals’ (TWGHs) Schools | Tung Wah Group of Hospitals | Jul 2010-Oct 2010 |
H&M Shop | H&M | Jul 2010-Sep 2010 |
Maintenance Service for Air-conditioning System at Rhine Garden | Synergis Services Management Ltd. | Jun 2010- May 2012 |
Replacement of Thermal Insulation in Lok Ma Chau Control Point (LMCCP) and A/C split type units in Kwun Tong World Trade Square (WTS) ImmD Office | Electrical and Mechanical Services Department | Jun 2010- Mar 2011 |
Excelsior Hotel 1/F, 2/F & 3/F Washrooms | Excelsior Hotel | Jun 2010- Dec 2010 |
Proposed New Roof Extension for Victoria Shanghai Academy at Shum Wan Road, Aberdeen | Victoria Shanghai Academy | Jun 2010- Dec 2010 |
Fitting Out Works for Caritas Community Centre-Caine Road (A2R) G/F, 2/F, 4/F&5/F at Caritas House, 2 Caine Road, HK | Caritas Hong Kong | Jun 2010- Nov 2010 |
24-month contract for operation and maintenance of electrical, mechanical & air-conditioning systems at Yung Fung Shee Memorial Centre & Pamela Youde Polyclinic | Electrical and Mechanical Services Department | May 2010-May 2012 |
RFQ: 2869 – Exit Sign Replacement from T8 Conventional Ballst to LED | The Hong Kong Jockey Club | May 2010-May 2011 |
Main Entrance and Assembly Hall Renovation Works for St. Paul’s College at No. 69 Bonham Road, HK | St. Paul’s College | May 2010-Dec 2010 |
Provison of O &M Works for Cape Collinson Crematorium and Municipal Venues under Mun/H1 Region( Period: May 2010 – Oct 2010) | Electrical and Mechanical Services Department | May 2010-Oct 2010 |
HVAC System Office Tower & Stepped Office HLC | Hutchision Logistics Centre | Apr 2010-Mar 2012 |
Maintenance Contract for Electrical System and Plumbing System | Tung Wah Group of Hospitals | Apr 2010 -Apr 2011 |
Wong Chan Sook Ying Memorial School at Yuen Long | Architectural Services Department | Apr 2010 -Jan 2011 |
MVAC System and Fire Dampers – TWGHs Wong Cho Tong Social Service Building | Tung Wah Group of Hospitals | Apr 2010-Oct 2010 |
Ho Shun Fuk Building-Replacement of Whole Building’s Main and Sub-main fresh water pipe | Ho Shun Fuk Building | Apr 2010 -May 2010 |
Replacement of Air-conditioning Unit International Funeral Parlour | Tung Wah Group of Hospitals | Mar 2010 -Dec 2010 |
Fitting-out Works for 12/F., Renal Dialysis Unit and General Words, The Hong Kong Sanatormium & Hospital | Hong Kong Sanatormium & Hospital | Feb 2010 -Oct 2010 |
E & M Installation at BOC Mongkok Building | Bank of China (Hong Kong) Ltd. | Feb 2010-May 2010 |
RFQ 2631 – Capital Works Replacement of Energy Saving Luminaires for Block A B C D and RCV Staff Quarter Shatin | The Hong Kong Jockey Club | Jan 2010 -Apr 2010 |
Replacement of Lighting System at Lok Ma Chau Spur Line Control Point, Births, Deaths & Marriage Registry Office, C&ED Venues | Electrical and Mechanical Services Department | Dec 2009 -Aug 2010 |
Rest Garden at Open Space at J/O Hung Hom Road and Hung Lai Road | Home Affairs Department | Dec 2009 -Jul 2010 |
E & M Installation at MTR Security Opertaion Centre at HTD and Canopy at HEO | MTR Corporation Limited | Dec 2009-May 2010 |
Supply labour & meterial to carry out electrical installation works under our document with ref. no.:RFQ2697 | The Hong Kong Jockey Club | Dec 2009 -Apr 2010 |
Promenade near Block 10, Phase II, South Horizons | South Horizons Management Ltd | Dec 2009 -Dec 2009 |
Provision of O&M Works for cape Collinson Crematorium and Municpical venues under mun/H1 region (Period: Nov 2009 – Nov 2010) | Electrical and Mechanical Services Department | Nov 2009-Nov 2010 |
Richland Garden, Tuen Mun | Richland Garden Property Management Ltd. | Nov 2009 -Apr 2010 |
8/F, St. Paul’s Hospital, Causeway Bay | St. Paul’s Hospital | Nov 2009 -Jan 2010 |
Office to Kindergarten, Stubbs road (ESF Centre) 43B Stubbs Road |
English School Foundation | Nov 2009 -Jan 2010 |
8 Hart Avenue, Tsim Sha Tsui | Jones Lang LaSalle | Oct 2009-Dec 2009 |
Mei Foo Phase 7 shopping centre | The Incorporated Owners of Mei Foo Sun Chuen | Sep 2009-May 2010 |
Lam Tsuen River Lighting Installation | Home Affairs Department | Sep 2009-May 2010 |
Ministry Building 42 Kennedy Road Hong Kong |
Citybase Property Management Limited | Sep 2009 -Dec 2009 |
Satay Inn and Function Rooms of Hong Kong Gold Coast Hotel | Sino Group | Sep 2009-Nov 2009 |
CLP Power Cable Tunnel Project Construction of Wu Shan Recreational Playground | CLP Power Hong Kong Limited | Sep 2009-Oct 2009 |
Apex Horizon Hotel 33 Wo Yi Hop Road, Kwai Chung N.T. (Term Contract : Aug 2009 – Aug 2011) | Goodwell-Prosperity Property Services Ltd. | Aug 2009-Aug 2011 |
Refurbishment of Playground (Phase II) at Kwong Fai Circuit Kwai Chung | Architectural Services Department | Aug 2009 -Oct 2009 |
Multi-purpose Hall for Kennedy School, English Schools Foundation | English School Foundation | Jul 2009-Sep 2009 |
City U-Student Residence WR2 | City University of Hong Kong | Jun 2009-Nov 2009 |
South Island School, 50 Nam Fung Rd, Hong Kong | English School Foundation | Jun 2009- Aug 2009 |
Kwu Tung Show House | Sino Group | Jun 2009- Jul 2009 |
Replacement of Light Fittings at Fencing Walls Surrounding The Main Campus | Lingnan University | May 2009-Oct 2009 |
Overhaul and Renovation of 80-seater Classrooms (Phase II), City University of Hong Kong | City University of Hong Kong | May 2009-Oct 2009 |
Constuction of Mezzanine Floor on 2/F., Theatre Block of Academy at the Hong Kong Academy for Performing Arts, 1 Gloucseter Road, Wanchai, Hong Kong | ISS EastPoint Property Management Ltd. | May 2009-Sep 2009 |
Renovation Works at the Entrance of Computer Laboratory for Department of Computer Science fpr City U of H.K. | City University of Hong Kong | May 2009-Aug 2009 |
9/F of Blcok R and G/F Lobby of Block K, Queen Elizabeth Hospital for Chinese Medicine Clinic of Hong Kong Baptist University | Hong Kong Baptist University | May 2009-Jul 2009 |
18 Month Term for Building Services Fitting-out Works to Health Services Venus in N.T. East Region | Electrical and Mechanical Services Department | Apr 2009 -Sep 2010 |
Plumbing Work at TVB roof floor Tseung Kwan O | Television Broadcasts Limited | Apr 2009 -Apr 2009 |
E & M Installation at Hing Wah Estate | The Link Management Limited | Mar 2009 -Mar 2012 |
CUHKFAA Chan Chun Ha Secondary School | CUHKFAA Chan Chun Ha Secondary School | Feb 2009-Nov 2009 |
E&W Works of Temporary Site Office of Central Park Towers (Phase 2) at Shops 907-912, Level 9, Metropolis Mall | Cheung Kong Property Development Ltd. | Feb 2009 -Mar 2009 |
AA&I Project 2008-2009 Installation Occupancy Sensors to Lighting of Toilets at Ho Sin Hang, Shaw and Baptist University Road Campuses |
Hong Kong Baptist University | Jan 2009 -Apr 2009 |
Tung Wah Eastern Hospitals MVAC Maintenance Service |
Tung Wah Group of Hospitals | Dec 2008 -Dec 2010 |
City U Library Subject Village |
City University of Hong Kong | Dec 2008 -Apr 2009 |
Mei Foo Sun Chuen Stage 6 | The Incorporated Owners of Mei Foo Sun Chuen | Nov 2008 -Mar 2010 |
Supply and Install “VAU-7” at LT 10/12 Plant Rm. 3M/F | City University of Hong Kong | Oct 2008 -Jan 2009 |
Shatin YWCA – Electrical and MVAC Installation | YWCA | Oct 2008 -Nov 2008 |
To Install Electric Instant Water Heaters and Cleansing Water Taps | Hong Kong Baptist University | Oct 2008 -Nov 2008 |
Lingnan University SO301 of the Dorothy Y L Wong | Lingnan University | Oct 2008 -Nov 2008 |
Health Sector Services (Kowloon West) Sub-division | Electrical and Mechanical Services Department | Sep 2008 -Mar 2009 |
Library Public Services Facilities | City University of Hong Kong | Sep 2008 -Dec 2008 |
Electrical and MVAC Installation for Design and Build conversion of cooling, condensate and grey water to irrigation water | City University of Hong Kong | Sep 2008 -Dec 2008 |
16/F Whole Floor in Kennedy Town Centre | Joint Quality Review Committee Ltd. | Sep 2008 -Oct 2008 |
City U Library Media Modification | City University of Hong Kong | Sep 2008 -Oct 2008 |
Proposed Construction of Management Office at Sui Wo Court, Shatin | Kai Shing Management Services Ltd. | Aug 2008 -Oct 2008 |
Teaching and Office Areas for ELC at City University of Hong Kong | City University of Hong Kong | Aug 2008 -Oct 2008 |
5/F Two Harbourfront, Whampoa | Hutchison Whampoa Property Limited | Aug 2008 -Sep 2008 |
Alternation & Addition Work at Kingswood Ginza Plaza on T.S.W.T.L. No.4 | Cheung Kong Property Development Ltd. | Jul 2008-Dec 2008 |
Vigers-Renaissance College | English School Foundation | Jul 2008-Oct 2008 |
Tuen Mun Gold Coast Piazza | Sino Group | Jul 2008-Oct 2008 |
Renovation of School of Continuing and Professional Education (SCOPE)-Ka Chi School | City University of Hong Kong | Jul 2008-Sep 2008 |
City U 7/F Design and Build for Upgrading of Sitting and Reception Areas for Faculty of Business | City University of Hong Kong | Jul 2008-Sep 2008 |
E&M Installation at Block C, Level 2 of St. Paul’s Hospital | St. Paul’s Hospital | Jul 2008-Sep 2008 |
Renovation of 2/F, 3/F & 4/F Offices & Stores at Shatin Club House | The Hong Kong Jockey Club | Jul 2008-Aug 2008 |
YMCA 6/F Male & Female Changing Room Split Type A/C Work | YMCA | Jul 2008-Jul 2008 |
Grand Century Place Motorized Valve Installation for A/C Zone Control | City University of Hong Kong | Jun 2008-Aug 2008 |
Annual Maintenance for Swimming Pool Area at 4/F., Chinese YMCA of HK Kowloon Centre, 23 Waterloo Road, Kln | YMCA | Jun 2008- Jul 2008 |
Olympian City II G/F Food Court 400A TPN Power Supply Installation | Sino Group | Jun 2008- Jul 2008 |
The Palace, Broadcast Drive | City University of Hong Kong | May 2008-Nov 2008 |
Provision of Maintenance Support Services on Airport Engineer Systems at HK International Airport | Electrical and Mechanical Services Department | May 2008-Oct 2008 |
Renovation of G/F Lobbies at Blocks J to M of Kornhill | MTR Corporation Limited | May 2008-Jun 2008 |
Unit A, 20/F., Carnation Court, 43 Tai Hang Road, Hong Kong | Residential Flat | Apr 2008 -Jul 2008 |
Alteration Works to G/F Area Chinese YMCA of HK – YM Concept (Dio Boy School) | YMCA | Apr 2008-Jun 2008 |
21/F., Office Renovation at One Harbourfront | Whampoa Property Management Limited | Apr 2008 -Apr 2008 |
109 Repulse Bay Road, Repulse Bay Hotel | The Hong Kong and Shanghai Hotels Limited | Apr 2008 -Apr 2008 |
1/F male and female lavatories of British Council | British Council | Mar 2008 -Oct 2008 |
Went Iandfill Office Renovation | Swire Sita Waste Serices Ltd. | Mar 2008 -Aug 2008 |
Additional Power Supply to Various Lan Rooms Within The Campus (Phase II) | Lingnan University | Mar 2008 -Jul 2008 |
New Archives for Library at Grandtech Centre | City University of Hong Kong | Feb 2008 -Jun 2008 |
DBS Bank (HK) Ltd. at Queen’s Road Central G/F, 1/F & 22/F for Core Banking | DBS Bank (HK) Ltd. | Feb 2008 -May 2008 |
A&A Works for Ocean Terminal and Ocean Centre Link | Harbour City Estates Limited | Feb 2008 -Apr 2008 |
Renovation Works at Sin Hua Bank Building Electrical and Drainage Installation Works | Bank of China (Hong Kong) Ltd. | Feb 2008-Mar 2008 |
Lecture Theatres LT5, LT7, LT9, LT10, LT11 & LT12 | City University of Hong Kong | Jan 2008 -Jul 2008 |
Renovation Works at Chak On Estate Market, Shek Kip Mei | City University of Hong Kong | Jan 2008- May 2008 |
Inno Centre, 72 Tak Cee Avenue, City University of HK | City University of Hong Kong | Jan 2008- Apr 2008 |
Entrance of Computer Laboratory, 2/F Mon Man Wai Building and 6/F Academic Building, for Department of Computer Science, City University of HK | City University of Hong Kong | Dec 2007 -Jan 2008 |
No. 10 Lai Yin Lane, Tung Lo Wan Rd., Causeway Bay, Hong Kong | The Chinese Rhenish Church Hong Kong Synod | Oct 2007 -Jun 2008 |
AA&I Project 2006/2007 Improvement to Campus Safety and Emergency Response System- Supply and installation of Trunking at Shaw Campus |
Hong Kong Baptist University | Oct 2007 -Apr 2008 |
Renovation of toilets and Baby Care Room at G/F., UG/F. and 1/F. of Shopping Arcade at Olympian City Phase II | Sino Group | Oct 2007- Nov 2007 |
Grand Century Place at Levels 18 and 19 | City University of Hong Kong | Oct 2007- Nov 2007 |
No. 5 Hang Ming Street, Ma On Shan, Renaissance College | English School Foundation | Oct 2007- Oct 2007 |
The Salvation Army Chuk Yuen Centre for Senior Citizens | Salvation Army | Sep 2007-Nov 2007 |
The Hong Kong Polytechnic University, Ventilation Improvement to Corridors at Student Halls of Residence | The Hong Kong Polytechnic University | Aug 2007-Nov 2007 |
Satay Inn at Shop 3, Tower1, China Hong Kong City, 33 Canton Road, Tsim Sha Tsui, Kowloon | Sino Group | Jul 2007-Sep 2007 |
Hong Kong Baptist University at Wu Chung 26/F | Hong Kong Baptist University | Jul 2007- Sep 2007 |
Fitting out of learning commons and spatial reorganization of Run Run Shaw Library, City University of Hong Kong | City University of Hong Kong | Jul 2007-Jul 2007 |
E&M Installation Nominated Sub-Contract for Promenade Renovation at Harbour Plaza HK | Whampoa Property Management Limited | Jun 2007-Oct 2007 |
Design & Build of Renovation Works at Telford Annex City University of Hong Kong | City University of Hong Kong | Jun 2007- Aug 2007 |
(PO 529472) Design & Build : Air Conditioning System for Wind Tunnel Testing Facilities | City University of Hong Kong | Jun 2007- Jun 2007 |
Renovation of G/F Lobbies at Blocks N to R of Kornhill | MTR Corporation Limited | May 2007-Aug 2007 |
Shop MA, MF, Wing Tak Mansion, 15 Canal Road West, Causeway Bay, HK ($10 Shop) | AEON Store | May 2007-Jun 2007 |
Replacement Work of Aging Thermal Insulation at Traffic Interchange, LG/F | Sino Group | May 2007-Jun 2007 |
Gold Coast Hotel-Wedding Garden | Sino Group | May 2007-May 2007 |
2C33CT07-Replacement of Lighting Installations at Lo Wu Control Point | Electrical and Mechanical Services Department | Mar 2007 -Jun 2007 |
Provision of Maintenance for Electrical Installation of the OUHK (Term Contract 12 February 2007 – 11 February 2009) | The Open University of Hong Kong | Feb 2007 -Jan 2009 |
English School Foundation – Renovation of House 6, 7 & 8 Ruby Chalet, Mang Kung Wo Road | English School Foundation | Feb 2007 -Apr 2007 |
City University of Hong Kong SGS Office | City University of Hong Kong | Feb 2007-Mar 2007 |
NKIL 1175-117 Sales Office | Sino Group | Feb 2007-Feb 2007 |
Grand Lisboa Hotel & Casino Macau 12-Main Buffet | Action Design Company Limited | Feb 2007 -Jan 2007 |
Kwai Chung Plaza Addition of 2500A Main Switchboard and Distribution System | The Incorporated Owners of Kwai Chung Plaza | Jan 2007 -Jul 2007 |
Overhaul and Renovation of Lecture Theatres LT13, LT15 & LT17 for City University of Hong Kong | City University of Hong Kong | Jan 2007 -Jun 2007 |
Supply and Installation of LED Exit Signs at LCSD Various Venues in N.T. Region | Electrical and Mechanical Services Department | Jan 2007- May 2007 |
16/F MLC Millennia Plaza | Goodwell-Prosperity Property Services Ltd. | Jan 2007-Mar 2007 |
Re-modelling of Lecture Theatre 14 | City University of Hong Kong | Dec 2006 -Jan 2007 |
20/F & 21/F Office Renovation and 1/F, 2/F, 3/F&5/F Minor Works at One Harbourfront | Whampoa Property Management Limited | Dec 2006 -Dec 2006 |
Lighting Replacement for Carpark of Chinese Recreation Club | Chinese Recreation Club | Oct 2006 -Apr 2007 |
City University – Wind Tunnel at Mong Man Wai Bldg. | City University of Hong Kong | Oct 2006 -Dec 2006 |
MTR Enhancement works contract no C7806-06C | MTR Corporation Limited | Oct 2006- Nov 2006 |
Lighting Retrofit in Tai Po Hospital and North District Hospital | Electrical and Mechanical Services Department | Sep 2006-Jan 2007 |
1/F to 3/F Main Atrium Tuen Mun Town Plaza T.M.T.L. 209 | Sino Group | Sep 2006-Dec 2006 |
G/F Block B, Chinese Recreation Club, 123 Tung Lo Wan Road | Chinese Recreation Club | Aug 2006-Nov 2006 |
ST Paul’s School & S.K.H. Kei Hau Secondary School | Architectural Services Department | Aug 2006-Aug 2006 |
Electrical installation for Show House No. 27 & 93, Man Kei Toi, Pak Sha Wan, Sai Kung | Nam Fung Development Ltd. | Jun 2006 -Nov 2006 |
Squash Court No. 3 in Laguna City Residential Clubhouse 1 | Citybase Property Management Limited | Jun 2006 -Aug 2006 |
Mechanical Ventilation Improvement at Public Transport Interchange | Sino Group | May 2006-Aug 2006 |
Tai Po Tai Yuen Estate Grace Church | Remembrance of Grace Church | May 2006-Jul 2006 |
Po Leung Kuk Wong Wing Shu Primary | Po Leung Kuk | May 2006-Jul 2006 |
Warehouse Development at 14-18 Tsing Tim Street, Tsing Yi | Fly King Transportation Co. Ltd. | May 2006-Jun 2006 |
6/F Blk B, Chinese Recreation Club, 123 Tung Lo Wan Rd., Tai Hang, HK | Chinese Recreation Club | Apr 2006-Dec 2006 |
Design and Build Fitout works for YCY Health Centre | City University of Hong Kong | Mar 2006 -Aug 2006 |
Castar Primary School Hall A/C Installation | Po Leung Kuk | Feb 2006 -May 2006 |
Tsim Sha Tsui Centre | Sino Group | Dec 2005 -Feb 2006 |
Pacific Hong Kong Centre | Sino Group | Dec 2005 -Feb 2006 |
To Yuen Building | City University of Hong Kong | Nov 2005 -Dec 2005 |
Purple Zone 2/F additional Classroom | City University of Hong Kong | Sep 2005 -Dec 2005 |
Whampoa Garden Site 12 Electrical & MVAC Installation for Basement One Retail Refit | Hutchison Whampoa Property Limited | Aug 2005-Nov 2005 |
Computer Laboratory of Library | City University of Hong Kong | Jul 2005-Sep 2005 |
Beacon Hill Primary School 5/F & 6/F Renovation | English School Foundation | Jun 2005- Aug 2005 |
CityU New Teaching Laboratory for CS at MMW (2/F) | City University of Hong Kong | Jun 2005- Aug 2005 |
E-logistics laboratory for department of management sciences, City University | City University of Hong Kong | May 2005-Aug 2005 |
Display Cabinet in Council Chamber Baptist University | Hong Kong Baptist University | May 2005-Jun 2005 |
City University Teaching Lab Rooms (Bis Laboratories) | City University of Hong Kong | May 2005-Jun 2005 |
CityU New Teaching Laboratory for CTL at AC Bldg 7/F | City University of Hong Kong | May 2005-Jun 2005 |
A&A works at China Hong Kong City, 33 Canton Road, Kowloon | Sino Group | May 2005-Jun 2005 |
La Salle Place, 51-53 La Salle Road | La Salle Place | May 2005-May 2005 |
House 19, Fei Ngo Shan | Owner of the House | Apr 2005-Nov 2005 |
EMSD Conference Room A/C Installation | Electrical and Mechanical Services Department | Apr 2005 -Apr 2005 |
IVE Term Contract 2005-2008 | IVE | Feb 2005 -Feb 2008 |
Skyline Tower Electrical Installation to PMD at 3/F | Sino Group | Jan 2005 -Apr 2005 |
Electrical & MVAC Installation for CLP Power Cable Tunnel Projects | CLP Power Hong Kong Limited | Nov 2004 -Dec 2004 |
Olympian City I Repositioning | Sino Group | Jun 2004 -Aug 2004 |
Ting Ping Children & Youth Integrated Services Centre | Children & Youth Integrated Services Centre | Feb 2004 -Feb 2005 |
Belvedere Garden Children & Youth Integrated Services Centre | Children & Youth Integrated Services Centre | Feb 2004 -Jul 2004 |
Haven of Hop Neigborhood Elderly Centre at Kin Ming Estate | Haven of Hope Christian Service | Feb 2004-Mar 2004 |
Community Specialist Clinic Kin Ming Estate | Haven of Hope Christian Service | Nov 2003-Dec 2003 |
The Three Bays at RBL 412, 7 Stanley Beach Road Show Flat | Sino Group | Nov 2003 -Dec 2003 |
A&A Works To Laboratories And Offices At FG 3/F, LGSI | The Hong Kong Polytechnic University | Sep 2003 -Aug 2004 |
Wanchai Baptish Church At No.42 Wood Road, Wanchai, Hong Kong | Baptish Church | Sep 2003 -Dec 2003 |
HIDC, Warehouse G/F-6/F Rampway and Driveway | Hutchison Whampoa Property Limited | Sep 2003-Nov 2003 |
Covered Walkway Street & External Works | Hong Kong Baptist University | Aug 2003 -Dec 2003 |
Electrical Installation at Aberdeen Site 1,4 and 5 Renovation | Hutchison Whampoa Property Limited | Jul 2003-Dec 2003 |
King Fai Building Lobby Renovation | Owner Committee | Jun 2003-Dec 2003 |
Ritz Plaza Main Lobby Renovation Works | Sino Group | Jun 2003- Dec 2003 |
Shium Ay Alliance Church | Shium Ay Alliance Church | Apr 2003-Sep 2003 |
Whampoa Garden – Stie 4 External Facade Renovation Electrical Installation | Hutchison Whampoa Property Limited | Feb 2003-Dec 2003 |
Electrical Rectification Works at Centre of Chinese YMCA of Hong Kong | YMCA | Feb 2003-Jul 2003 |
Shatin City One Cambridge Nursing Home | Cambridge Nursing Home | Feb 2003-Jun 2003 |
Residential Care For Elderly (Rche) Cum Day Care Unit (DCU) at Podium & Level 2, Fu Yun House, Fu Cheong Estate | Po Leung Kuk | Jan 2003- Dec 2003 |
Tsui Ping Mutual Help and After School Child Care Centre | Social Walfare Dapertment | Jan 2003- Jun 2003 |
Yau Chai Hospital Mrs. Kwok Yuk Cheung and Chinachem Care and Attention Homes Public Sewer Connection | Kwok Yuk Cheung and Chinachem Care and Attention Homes | Aug 2002 -Dec 2002 |
Aberdeen Centre Shopping Mall Renovation Works | Whampoa Property Management Limited | Jul 2002-Nov 2002 |
Lot 2052 Show Flat And Sale Office at TMTL 209, Tuen Mun Town Plaza | Sino Group | Jun 2002- Dec 2002 |
Electrical System for Classroom Installation | Kwun Tong Government Secondary School | Jun 2002- Dec 2002 |
Hall A/C Installation (8 sets) | Kowloon Tang School (Secondary Section) | Jun 2002- Jul 2002 |
Shatin ASD Toilet Electrical and MVAC Installation | Architectural Services Department | May 2002-Nov 2002 |
Hall Split Type A/C Installation (10 sets) | Fong Shu Chuen Primary School | Apr 2002 -May 2002 |
TKOTL 24 Show Flat And Sale Office At Olympian City II | Sino Group | Mar 2002 -Dec 2002 |
Hang Hau Station | MTR Corporation Limited | Feb 2002 -Sep 2002 |
Tuen Mun Butterfly Estate Library Renovation | Architectural Services Department | Jan 2002 -Dec 2002 |
Installation of Electrical System, Window Type A/C Unit and Exhaust Air Fan (32 sets) | CNEC Lui Ming Choi Primary School | Dec 2001 -Aug 2002 |
Installation of Electrical System and Window Type A/C Unit (51 sets) | Fong Shu Chuen Primary School | Nov 2001 -Aug 2002 |
E&M Services for Aldrich Bay’s Pedestrian Subway Extension A | Electrical and Mechanical Services Department | Aug 2001 -Apr 2002 |
Fitting out of City U Library Replanning | City University of Hong Kong | Aug 2001 -Dec 2001 |
Office Electrical Fitting Out Works | Woman Clinic | Aug 2001-Oct 2001 |
E&M Package for Proposed Religious Institution Building On 53 Cumberland | Hop Fat Construction Co., Ltd | Jan 2001- Nov 2001 |
Fitting out General Office and lobby of Department of Applied Social Studies | City University of Hong Kong | Jan 2001- Oct 2001 |
A&A Works for Production & Warehouse Bulding | Co Win (Asia) Limited | Jun 2015- Jun 2016 |
Fitting out of Conference Room, Research Centre and Seminar Room of School of Law | City University of Hong Kong | Jan 2001- Apr 2001 |
Unpgrading BFA Facilities for Tuen Mun Law Courts Building | Shun Bo | Aug 2015 -Jun 2016 |
Installation of window type a/c unit and associated electrical work upgrading for 250A main income to 400A | FMO Aberdeen Secondary Technical School | Jul 2000-Aug 2000 |
Installation of window type a/c unit and acoustic fan chamber (52 sets) | Kung Yik She Secondary School | Apr 2000-Dec 2000 |
Refurbishment of Fu Kin Street Public Toilet, Tai Wai | Architectural Services Department | |
5-year Electrical Installation Inspection Service for College of International Education | Hong Kong Baptist University | |
Split A/C unit A, 20/F, Carnation Court, 43 Tai Hang Road, HK | The Owner of House | Apr 2008-Aug 2008 |